| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W201691123005 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W201691123005 |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Corrosion Integrity: | Excellent |
| Chemical Resistance: | Excellent | Capacity: | 20 M3 To 18,000 M3 |
| Service Life: | ≥30 Years | Permeability: | Gas / Liquid Impermeable |
| Highlight: | ASME makeup water pressure vessel,fusion bonded epoxy water tank,ASME epoxy-coated makeup tank |
||
Most makeup water is stored in atmospheric bolted or welded tanks, but some duties - a pumped surge vessel, reverse-osmosis permeate under pressure, or a makeup buffer on a pressurized loop - put the water under pressure, and then an ASME Boiler and Pressure Vessel Code vessel is the correct choice. The risk is assuming a standard atmospheric tank is 'ASME' or claiming a U-stamp the manufacturer does not hold. This article explains when makeup water needs an ASME vessel, what Section VIII requires, and how to verify a U-stamp honestly.
An ASME makeup water tank is warranted when the makeup water is stored or delivered under pressure (design pressure above atmospheric), so it must be built to ASME BPVC Section VIII, Division 1, with a U-stamp from a holder of ASME certification, design pressure and temperature documented, and the medium and coating matched to the duty. For atmospheric makeup buffers, AWWA D103-19 or ISO 28765 bolted tanks remain correct. Center Enamel has no makeup or data-center project in this library; we cite a real pressure-vessel delivery, the Malta carbon steel pressure vessel (2026), as analogous proof of building code pressure vessels, not a makeup or data-center delivery, and we do not blanket-claim a U-stamp.
Makeup water is pressurized when it sits in a surge vessel after a pump, arrives as RO permeate under line pressure, or feeds a pressurized loop where the buffer must hold pressure rather than just volume. At that point an atmospheric tank is the wrong equipment, and an ASME Section VIII vessel is required.
Pressure, not volume, is the trigger.
ASME BPVC Section VIII, Division 1 governs the design, fabrication, inspection, and stamping of pressure vessels, with rules for materials, weld procedures, and hydrostatic testing. A compliant vessel carries a U-stamp only when built by a holder of ASME certification - the stamp is the manufacturer's authorization, not a generic label.
Division 1 is the rule; the U-stamp is the authorization.
A buyer should verify the U-stamp by confirming the manufacturer holds current ASME certification and can stamp the specific vessel, rather than assuming it. We do not blanket-claim a U-stamp; our Malta pressure-vessel delivery (2026) is cited as analogous pressure-vessel capability, and any U-stamp must be verified per project.
Verify the stamp; do not assume it.
Even a pressure vessel needs the lining matched to the water: potable or process-grade coating with NSF-61 or local equivalence where relevant, and design pressure, temperature, and medium documented in the data report. For atmospheric makeup buffers, return to AWWA D103-19 or ISO 28765 bolted tanks.
Lining by medium; code by pressure.
We have no makeup-water or data-center project in this library. Our Malta carbon steel pressure vessel (2026) is a real pressure-vessel delivery cited as analogous proof of building code vessels, not a makeup or data-center delivery, and we explicitly do not claim a U-stamp we do not hold. The ASME guidance above reflects the published ASME BPVC structure, not a specific makeup contract.
Every figure reflects documented pressure-vessel parameters, and the application remains analogous and is not claimed.
Reference check |
Action |
Red flag |
ASME |
Confirm cert |
No cert |
U-stamp |
Verify per vessel |
Blanket claim |
Pressure |
Document P/T |
Atmospheric |
Coating |
Medium match |
Generic |
When the water is stored or delivered under pressure - pumped surge, RO permeate under line pressure, or a pressurized loop - not merely when it is large.
The design, fabrication, inspection, and stamping of pressure vessels, with rules for materials, weld procedures, and hydrostatic testing.
The U-stamp marks a vessel built by a holder of ASME certification; only a certified manufacturer may stamp a specific vessel.
Confirm the manufacturer holds current ASME certification and can stamp the specific vessel; do not assume or accept a generic 'ASME' label.
No - an atmospheric bolted or welded tank follows AWWA D103-19 or ISO 28765; ASME applies when the vessel is pressurized.
Not in our project library. We cite our real Malta pressure vessel as analogous capability, not a makeup or data-center delivery.
A medium-matched coating with NSF-61 or local equivalence where the water is potable or process-grade.
Yes - design pressure, design temperature, and medium should be recorded in the data report and the inspection file.
Assuming an atmospheric tank is 'ASME' or claiming a U-stamp the manufacturer does not hold; verify both per project.
An ASME makeup water tank is warranted only when the makeup water is under pressure - a pumped surge vessel, RO permeate, or a pressurized loop - and then it must be built to ASME BPVC Section VIII, Division 1 with a U-stamp from a certified holder, design pressure and temperature documented, and the lining matched to the medium. For the far more common atmospheric makeup buffer, AWWA D103-19 or ISO 28765 bolted tanks remain correct. Center Enamel's real Malta carbon steel pressure vessel (2026) shows we build code pressure vessels; we do not blanket-claim a U-stamp, and the makeup or data-center application is analogous and not claimed. Verify the certification and the stamp per project, and the vessel is compliant instead of decorative. An atmospheric makeup buffer mislabeled as ASME is a compliance liability waiting for the first inspector, while a properly stamped Section VIII vessel is the quiet assurance that the pressure duty was engineered, not assumed. For the far more common atmospheric makeup buffer, return to AWWA D103-19 or ISO 28765 bolted tanks, and reserve the Section VIII vessel for the duty that is genuinely pressurized.
Suggested CTA: If you are specifying an ASME makeup water tank, send us the pressure, temperature, and medium and we will return a Section VIII, Division 1 design with U-stamp verification guidance.