| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Body Color: | Dark Green / Can Be Customized | Corrosion Integrity: | Excellent |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Chemical Resistance: | Excellent |
| Size Of Panel: | 2.4M * 1.2M | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
When specifiers search for a 'buffer vessel' rather than a 'buffer tank', they usually mean a fabricated, often pressure-rated steel vessel with defined nozzles and a code pedigree. For data center chilled water, the buffer vessel must be corrosion-resistant, tightly sealed, and quick to install in a occupied mechanical space. This article covers how such vessels are built and what to specify.
A chilled water buffer vessel for a data center is a fabricated steel vessel, usually glass-fused-to-steel (GFS), fusion-bonded-epoxy (FBE) coated, or stainless, rated for the loop pressure and built from bolted panels for fast erection. The key decisions are material, pressure class, and seal strategy, not just volume.
The lining decides service life in continuously wet, chilled service. GFS fuses a glass layer to steel at 820-930C to give an inert, scratch-resistant surface; FBE is a thermoset epoxy powder coating good for potable and process water; stainless (304/316L) suits high-purity or compact skids. The Italy Sardinia chilled process water tank (2025, 30,549 m3, enamel and membrane roof) shows a large coated vessel built for process duty.
An atmospheric buffer vessel sees only static and pump head; a pressurized vessel must meet a design pressure with code-rated nozzles and reinforcement. The Malta pressure vessel project (2026, carbon steel, white coated) shows our pressure-vessel build experience. Decide the pressure class from the loop's highest expected pressure, including pump shut-off head.
Bolted-panel vessels ship flat-packed: enamel or epoxy panels, 8.8-grade bolts, butyl sealant, and roof. Crews erect tier by tier on site. The Thailand project (2015) was erected by 6 people in 12 days, illustrating how panel construction compresses the schedule versus welded builds. This matters in data centers where mechanical room access is tight.
| Build method | Shipping | Site speed | Best for |
|---|---|---|---|
| Bolted panel | Flat-pack, low | Fast (days) | Tight access, repeat units |
| Field welded | Bulk, high | Slow (weeks) | One-off large welds |
| Shop fabricated | Crated | Crane set | Pre-tested skids |
Chilled water vessels live wet, so the seal between panels and at every nozzle must hold. Butyl inter-panel sealant plus torque-controlled bolts give a repeatable joint; nozzles are reinforced and gasketed for the loop temperature. A factory holiday test on coated panels backs this up before shipment.
Center Enamel runs in-house enameling and epoxy lines and ships bolted panels with full QA records. From a 316 m3 buffer at a beverage plant to the 30,549 m3 Sardinia process tank, the same panel system scales. We supply the vessel, the lining, the roof, and the erection guidance.
GFS or FBE coated steel for most chilled-water duty at lower cost; stainless 304/316L for high-purity or small skids. Follow water quality.
Only if the loop requires it. Many chilled-water buffers are atmospheric; pressurized vessels are specified where system pressure must be held at the tank.
Panel systems erect in days; a comparable project was set by 6 people in 12 days. Welded builds typically take weeks.
Butyl inter-panel sealant plus torque-controlled bolts, reinforced gasketed nozzles, and a factory holiday test on coated panels.
Yes. An external insulation jacket sized to the local ambient swing is standard for chilled service to limit heat gain.
We have pressure-vessel build experience (e.g. the Malta carbon-steel vessel, 2026). For coded stamps such as ASME, confirm the specific certification with us before order.
A chilled water buffer vessel is defined by its material, pressure class, and how it is fabricated. GFS, FBE, or stainless linings set the service life; bolted panels make delivery and erection practical in tight mechanical rooms; and the seal strategy decides leak tightness. Specify the lining and pressure class from water quality and loop pressure, then let panel construction handle the schedule.