| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W201691123005 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W201691123005 |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Corrosion Integrity: | Excellent |
| Chemical Resistance: | Excellent | Capacity: | 20 M3 To 18,000 M3 |
| Service Life: | ≥30 Years | Permeability: | Gas / Liquid Impermeable |
| Highlight: | Customized Biogas Storage Tanks with warranty,Fusion Bonded Epoxy Tanks sizing options,Biogas Storage Tanks export logistics |
||
Biogas projects rarely fit a catalog. Feedstock, retention time, gas pressure and site geometry all push a digester toward a custom configuration, and the digester has to arrive on another continent in one piece. This article lays out the options a buyer can actually specify and what a competent exporter handles so the tank goes together on site without surprises.
Biogas digester volume follows the process: feedstock volume, solids content and hydraulic retention time (HRT), typically 20-40 days for mesophilic digestion at 35-38C. The tank is then sized to that retention, not to a standard diameter. A modular bolted shell lets the diameter and height be tuned to the available footprint.
The digester shell is usually a sealed GFS tank; the biogas is stored either as headspace pressure under a fixed roof or in a double-membrane gas holder sized for 5-30 mbar operating pressure. The choice depends on gas yield and whether you want pressure storage or a separate holder. Both interface with the same bolted shell.
GFS is the default for the digester because the inert glass face resists the acidic, H2S-laden environment. Where the feed or digestate is especially aggressive, stainless (SS304/316L) sections or a fully stainless tank is specified. The coating and the bolts must survive both the liquid and the gas phase.
| Option | When to choose | Note |
|---|---|---|
| GFS digester | General agricultural / municipal biogas | Inert face, bolted, fast. |
| Stainless sections | Aggressive or high-chloride streams | SS304 / 316L. |
| Double-membrane holder | Dedicated gas storage | 5-30 mbar. |
| Fixed roof | Simple pressure storage | Lower capital. |
A competent exporter crates coated panels to survive ocean freight, supplies numbered assembly drawings and bolt kits, and coordinates third-party inspection and Incoterms. Center Enamel's biogas export record includes the Turkey biogas plant (2 x 3,727 m3 digesters, 2020), the France CSTR digester (2,215 m3, 2021), the Sweden biogas project (2024), and the Swaziland anaerobic digester installation (2 x 21,094 m3, 2020).
Center Enamel delivers configurable GFS biogas digesters with membrane or fixed roofs, designs to ISO 28765, runs 100% 1500 V holiday testing, and packages complete bolted assemblies for export with drawings and inspection support.
From feedstock volume and hydraulic retention time (commonly 20-40 days at 35-38C mesophilic). The tank is sized to that, not to a catalog size.
GFS is the default for the corrosive, H2S-rich digester. Stainless (304/316L) is chosen for aggressive or high-chloride streams.
Either fixed-roof headspace pressure or a separate double-membrane gas holder (5-30 mbar). The shell is the same bolted GFS tank.
Coated panels are crated for ocean freight with numbered drawings, bolt kits and often third-party inspection before loading.
A bolted modular shell can be raised or paralleled; plan the foundation and roof interface for future capacity.
Assembly drawings, panel numbering, bolt kits, coating records and (often) supervision or installation guidance.
Customized biogas storage tanks are specified from the process outward - volume from retention time, roof from gas strategy, material from the stream - and a capable exporter delivers that as one coordinated, holiday-tested, crated package.