| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External | Adhesion: | 3,450N/cm |
| Steel Grade: | ART 310 | Size Of Panel: | 2.4M * 1.2M |
| Capactiy Available: | 20 M3 To 20,000 M3 | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Easy To Cle: | Smooth, Glossy, Inert, Anti-adhesion | Warranty Period: | 2 Years Free Of Charge |
| Impact Resistance: | Excellent | FeatureEco-friendly: | Durability |
| Capactiy Availabl: | E20 M3 To 20,000 M3 | Impact: | ResistanceExcellent |
| Applications: | Water , Waste Water, Digester , Reactor , Grain , Sludge , Chemicals | Defect Free: | Minimum Maintenance Needed |
| Highlight: | chilled water storage tank,stratified chilled water tank,cold-climate industrial water tank |
||
A chilled-water storage tank in Finland is a stratified vessel that stores cold water made off-peak and releases it during peak cooling hours, letting a plant shift electricity demand and defer chiller capacity. In a Finnish climate the specification carries two extra burdens: a long, severe heating season changes the cooling load profile, and an unheated or outdoor tank needs a real freeze and insulation strategy. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks engineered for water duty, with more than 30,000 installed tank projects across 100-plus countries. This article sets out the compliance-first specification baseline a Finnish chilled-water project should work from.
A stratified chilled-water tank holds cold water at the bottom and warmer return water at the top. Charging runs chillers at night or during low-cost, low-carbon hours; discharging meets the afternoon peak. The useful volume is not the geometric volume - it is the band that stays cold before the thermocline degrades and warm return breaks through to the outlet. Diffuser geometry and inlet velocity decide how sharp that thermocline stays, so a buyer should treat stratification as a specification item, not a vendor detail.
For a chilled-water storage tank in Finland the shell and siting fall under the Land Use and Building Act and the applicable Finnish building regulations, with a building permit or notification determined by the municipality and the tank's size and location. A closed chilled-water loop is normally a process-contact system rather than a potable one, so the potable-contact question arises mainly at the makeup connection to the public supply, where backflow protection and water-supply requirements apply. Environmental permitting can be triggered by volume, location and discharge. The local rescue service (pelastuslaitos) sets access and any fire-related separation. Confirm each with the authority having jurisdiction at concept stage.
A thermal store, chilled-water buffer, data-center water reservoir or fire reserve sits idle or cycles slowly for most of its life, so the internal finish and shell discipline matter more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 degrees C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated vessel is preferred. The caveat is that lining choice follows fluid chemistry and code duty, so the specifier should confirm pH, chloride load and pressure class rather than assume one construction fits every duty.
Sizing starts from the real duty calculation - thermal charge/discharge profile, chilled-water temperature swing, makeup and process balance, or fire hydraulic demand - not from a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, a 30-50 year tank lifecycle, the NSF/ANSI 61 or WRAS potable-contact option where relevant, and the local freeze or frost margin then set the shell, roof and appurtenances. Every figure below is checked against the applicable standard and the authority having jurisdiction in the destination country.
Design parameter |
Typical value or range |
Why it matters |
Peak duty / flow |
Site-specific m3/h or kW |
Sets drawdown, refill and diffuser design |
Separated duty volumes |
Makeup + process + reserve |
Prevents quality cross-contamination |
Potable-contact option |
NSF/ANSI 61 / EU 1935/2004 |
Required where water feeds a human-use system |
Backflow protection |
Isolated, verified connections |
Protects the public supply |
Coating thickness |
0.25-0.45 mm enamel / 180-280 um FBE |
Idle-water surface integrity |
Adhesion |
above 3,450 N/cm2 (GFS) |
Lining integrity on drawdown |
Spark test |
1,500 V DC per panel |
Holiday verification |
Design lifecycle |
30-50 years |
Standby-plus-cyclic water duty |
Freeze / frost margin |
Site-specific cold climate |
Protects shell, roof and appurtenances |
The figure below is a REAL Center Enamel delivery cited here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed thermal-energy-storage, chilled-water, data-center water or fire-water delivery in the named country or Nordic region. Center Enamel's verified project record (case_library.csv) holds no dedicated TES, chilled-water, data-center-water or Finland/Norway/Denmark/Nordic fire-water project for this specific duty, and no in-country delivery at all in Norway, Denmark or Finland. Where a real fire-protection tank exists it is cited as the closest analogue, never as the named geography's application. This reference demonstrates the ability to engineer large coated and bolted water tanks for demanding duty, not a claim about this specific application or location. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Guinea potable-water tank |
Guinea |
GFS bolted tank |
1 tank, 317 m3 |
2024 |
Real water tank (capability, not a Finland chilled-water project) |
Issue a duty schedule that states the peak cooling deficit, the hours of peak to cover, the supply temperature and the achievable off-peak charge window, then ask the supplier to show the volume and diffuser design that deliver it. In Finland add the cold-climate envelope explicitly: insulation, freeze margin, roof and appurtenance detail, and the winter charge strategy. Require coating thickness, adhesion and spark-test records, and keep the lining and construction documentation permit-ready for the municipality.
It stores cold water made off-peak and releases it at the cooling peak, shaving demand and deferring chiller capacity in an Finnish plant or district system.
From the peak-hour cooling deficit and the hours to cover, then checked against the temperature swing and stratification quality - not from a generic factor.
The Land Use and Building Act and Finnish building regulations, municipal permit or notification, possible environmental permitting, and rescue-service access conditions.
Usually no - a closed chiller loop is a process-contact system; potable and backflow rules apply mainly at the makeup connection to the public supply.
GFS enamel for inert idle water, FBE for a specified duty, or stainless where the fluid is low-mineral and a fabricated vessel is preferred.
A sharp thermocline keeps stored cold usable; a mixed store delivers warm water long before the geometric volume is empty.
Thickness (0.25-0.45 mm for GFS or 180-280 micrometres for FBE), adhesion above 3,450 N/cm2 for GFS and 100 percent 1,500 V DC spark testing per panel.
It drives insulation, freeze margin, roof and appurtenance detail, and the winter charge strategy for an outdoor or unheated tank.
About 30 days ex-works for a 1,000-10,000 m3 vessel, with bolted erection on site in weeks.
A 30-50 year shell lifecycle is expected, with the lining and diffuser internals driving maintenance.
Yes - the lining should be warranted separately because cycling stresses the coating more than the shell.
A verified single shell of 20,000 m3 was delivered in 2016, setting the upper bound for one bolted tank.
No - it is a real water tank cited as manufacturing-capability evidence, not a claimed Finland chilled-water project.
Yes - GFS, FBE and stainless bolted tanks sized from the real duty with documentable lining and cold-climate construction records.
Only if its off-peak capacity and window can deliver the required charge; check this against the duty schedule before sizing.
A chilled-water storage tank in Finland is sized from the peak deficit and cover hours, with usable capacity set by stratification and a real cold-climate envelope. Check the charge window, demand lining evidence and keep documentation permit-ready.
Suggested CTA: State peak deficit, cover hours and winter freeze margin, and require a stratification strategy before ordering a Finland chilled-water tank.