| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Permeability: | Gas / Liquid Impermeable | Elastic: | Same As Steel Sheet ,around 500KN /mm |
| Capacity: | 20 M³ To 20,000 M³ | Tank Body Color: | Dark Green / Can Be Customized |
| Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External | Tank Material: | Glass Fused To Steel |
| Highlight: | EN 12845 fire water tank,fire-brigade compliant water tank,industrial fire water tank |
||
A fire water tank in Poland is a dedicated reserve that supplies sprinklers, hydrants or monitors for the agreed fire scenario, and it is judged on one thing above all: whether the required volume stays available at the required flow when the State Fire Service checks it. Polish fire protection is commonly specified to the EN 12845 automatic-sprinkler basis, with the local fire brigade (Straż Pożarna) as the approving authority and the insurer involved where one exists. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and galvanized bolted tanks engineered for fire reserve duty, with more than 30,000 installed tank projects across 100-plus countries. This article sets out the demand-led specification baseline a Polish fire-water project should work from.
A fire-water tank is not sized by rule of thumb. The design flow and duration come from the hazard classification and the sprinkler or hydrant hydraulic calculation, and the tank must hold that volume above the level at which the pumps lose suction. That remaining gap - the difference between the usable low level and the outlet - is where many undersized installations fail an acceptance check. A robust Polish specification states the design flow, the required duration, the unusable residue and the refill arrangement as separate, verifiable numbers, with a freeze margin added for outdoor tanks.
For a fire water tank in Poland the usual reference is EN 12845 for automatic sprinkler installations together with the requirements of the State Fire Service and any insurer. Poland widely uses the EN family through PN-EN adoption, and NFPA 22 may apply where the US basis is explicitly chosen for a particular project. There is no single Polish fire-water tank code that would replace an agreed design basis, so the specifier should record the basis in writing. Polish water law and the building law frame siting, bunding and any abstraction or discharge associated with the tank. Confirm the approval route before the shell is ordered.
A thermal store, chilled-water buffer, data-center water reservoir or fire reserve sits idle or cycles slowly for most of its life, so the internal finish and the shell discipline matter more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 degrees C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated vessel is preferred. The caveat is that lining choice follows fluid chemistry and code duty, so the specifier should confirm pH, chloride load and pressure class rather than assume one construction fits every duty.
Sizing starts from the real duty calculation - thermal charge/discharge profile, chilled-water temperature swing, makeup and process balance, or fire hydraulic demand - not from a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, a 30-50 year tank lifecycle, the NSF/ANSI 61 or WRAS potable-contact option where relevant, and the local freeze or seismic margin then set the shell, roof and appurtenances. Every figure below is checked against the applicable standard and the authority having jurisdiction in the destination country.
Design parameter |
Typical value or range |
Why it matters |
Design flow |
Site-specific m3/h or L/min |
Drives the hydraulic calculation |
Fire duration |
Minutes or hours by hazard |
Sets the required usable volume |
Usable level band |
Between outlet and low-level mark |
Excludes unusable dead volume |
Refill arrangement |
Mains or pump with verified rate |
Sustains demand during the event |
Freeze margin |
Site-specific winter design temperature |
Protects an outdoor reserve |
Coating thickness |
0.25-0.45 mm enamel / 180-280 um FBE |
Idle-water surface integrity |
Adhesion |
above 3,450 N/cm2 (GFS) |
Lining integrity at low level |
Spark test |
1,500 V DC per panel |
Holiday verification |
The figure below is a REAL Center Enamel delivery cited here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed thermal-energy-storage, chilled-water, data-center water or fire-water delivery in the named country. Center Enamel's verified project record (case_library.csv) holds no dedicated TES, chilled-water, data-center-water or Belgium/Poland/Italy/Sweden/Finland fire-water tank project for this specific duty; where a real in-country tank exists it is cited as the closest analogue, never as the named application. Poland, Finland and Belgium have no in-country project entries in the available source at all. This reference demonstrates the ability to engineer large coated and bolted water tanks for demanding duty, not a claim about this specific application or geography. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
India fire-protection tank battery |
India |
GFS bolted tank |
3 tanks, 12,261 m3 total |
2024 |
Real fire-water battery (capability, not a Poland delivery) |
Issue the fire strategy first: design flow, duration, hazard classification, usable level band and refill method. Then require the supplier to show how the shell, outlet and internal finish preserve that usable volume over a long standby life in a Polish winter. Reject a quote based only on geometric capacity or a generic duration, because an acceptance check measures available water at the outlet. Keep the lining and coating records ready and record the chosen standard basis in the documentation pack.
It holds a dedicated reserve for sprinklers, hydrants or monitors and must deliver the design flow for the agreed duration when checked.
From the hazard-based hydraulic calculation: design flow multiplied by required duration, with the unusable dead volume added back and the refill rate checked.
EN 12845 is the common basis for automatic sprinklers, adopted through PN-EN, with the State Fire Service and any insurer as approving parties; NFPA 22 applies only if explicitly adopted.
The local State Fire Service (Straż Pożarna), together with the insurer where one is involved and the chosen design basis.
Yes - water law and the building law frame siting, bunding and any abstraction or discharge associated with the installation.
GFS enamel for inert standby water, FBE for a specified duty, and galvanized where a lower-cost zinc-protected shell is acceptable.
Usable volume excludes water below the suction outlet that the pump cannot draw - an acceptance check measures usable water, not nameplate capacity.
Thickness (0.25-0.45 mm for GFS or 180-280 micrometres for FBE), adhesion above 3,450 N/cm2 for GFS and 100 percent 1,500 V DC spark testing per panel.
Yes - an outdoor reserve needs a site-specific freeze margin and roof detail sized to the Polish winter design temperature.
About 30 days ex-works for a 1,000-10,000 m3 vessel, with bolted erection on site in weeks.
A 30-50 year shell lifecycle is expected under standby duty, with the lining and outlets driving maintenance.
Yes - the lining should be warranted separately because long standby and occasional drawdown stress the coating.
A verified single shell of 20,000 m3 was delivered in 2016, setting the upper bound for one bolted tank.
No - it is a real fire-water tank battery cited as capability evidence, not a claimed Poland project.
Usually because usable volume was overstated - the design ignored the dead level below the suction point or the refill could not sustain the demand.
A fire water tank in Poland is sized from the hydraulic demand and an agreed EN 12845 or alternative basis, with usable - not geometric - volume as the acceptance criterion. Define the level band, add a freeze margin and demand lining evidence.
Suggested CTA: Fix the fire strategy and require a usable-volume calculation before ordering a Poland fire-water tank.