| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External | Steel Grade: | ART 310 |
| Size Of Panel: | 2.4M * 1.2M | Capactiy Available: | 20 M3 To 20,000 M3 |
| Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion | Easy To Cle: | Smooth, Glossy, Inert, Anti-adhesion |
| Warranty Period: | 2 Years Free Of Charge | FeatureEco-friendly: | Durability |
| Capactiy Availabl: | E20 M3 To 20,000 M3 | Impact: | ResistanceExcellent |
| Installation: | By Jacking Machine Or Steel Pole, Fast In Installation | Highlight: | stratified chilled water tank,buffer tank peak shaving,industrial chilled water storage |
A chilled-water storage tank in Italy is a stratified vessel that stores cold water produced off-peak and releases it during the hot afternoon peak, letting a plant shave electrical demand and defer chiller capacity. Italy's cooling season, high solar generation and time-of-use tariffs make afternoon peak shaving attractive, and the tank turns cheap midday or night-time cooling into a dispatchable reserve. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks engineered for chilled-water duty, with more than 30,000 installed tank projects across 100-plus countries. This article sets out the duty-led specification baseline an Italian chilled-water project should work from.
A stratified chilled-water tank holds cold water at the bottom and returns warmer water at the top. Charging runs chillers at night or during low-cost solar hours to fill the tank; discharging serves the building or process load during the peak without starting additional chillers. The economic value is the avoided peak chiller capacity and demand charge, so the tank is sized from the peak-hour cooling deficit and the number of hours to be covered. An Italian site should confirm that the chiller plant can deliver the off-peak charge within the available window and that the solar generation profile actually coincides with the charge period.
For a chilled-water storage tank in Italy the shell falls under the national building framework and UNI-EN technical standards, with EN 28765 commonly specified for a glass-fused-to-steel construction. A closed chiller loop is not normally a potable system, so the internal specification is a process-contact one unless a human-use connection exists; where one does, EU 1935/2004 and an appropriate approval apply. Water treatment and blowdown discharge fall under Italian water law and the competent authority. The Vigili del Fuoco sets access and separation. Confirm these interface points early, because retrofitting a tank into a constrained Italian plant room is expensive.
A thermal store, chilled-water buffer, data-center water reservoir or fire reserve sits idle or cycles slowly for most of its life, so the internal finish and the shell discipline matter more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 degrees C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated vessel is preferred. The caveat is that lining choice follows fluid chemistry and code duty, so the specifier should confirm pH, chloride load and pressure class rather than assume one construction fits every duty.
Sizing starts from the real duty calculation - thermal charge/discharge profile, chilled-water temperature swing, makeup and process balance, or fire hydraulic demand - not from a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, a 30-50 year tank lifecycle, the NSF/ANSI 61 or WRAS potable-contact option where relevant, and the local freeze or seismic margin then set the shell, roof and appurtenances. Every figure below is checked against the applicable standard and the authority having jurisdiction in the destination country.
Design parameter |
Typical value or range |
Why it matters |
Peak cooling deficit |
Site-specific kW or MW |
Sets the required volume |
Hours of peak covered |
Shift duration |
Derives usable capacity |
Charge temperature |
Supply chilled-water setpoint |
Defines the cold reservoir |
Temperature swing |
Delta-T across the thermocline |
Affects usable volume |
Coating thickness |
0.25-0.45 mm enamel / 180-280 um FBE |
Idle-surface integrity |
Adhesion |
above 3,450 N/cm2 (GFS) |
Lining integrity on cycling |
Spark test |
1,500 V DC per panel |
Holiday verification |
Design lifecycle |
30-50 years |
Standby-plus-cyclic cold duty |
The figure below is a REAL Center Enamel delivery cited here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed thermal-energy-storage, chilled-water, data-center water or fire-water delivery in the named country. Center Enamel's verified project record (case_library.csv) holds no dedicated TES, chilled-water, data-center-water or Belgium/Poland/Italy/Sweden/Finland fire-water tank project for this specific duty; where a real in-country tank exists it is cited as the closest analogue, never as the named application. Poland, Finland and Belgium have no in-country project entries in the available source at all. This reference demonstrates the ability to engineer large coated and bolted water tanks for demanding duty, not a claim about this specific application or geography. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Italy municipal-water GFS tank |
Italy |
GFS bolted tank |
1 tank, 198 m3 |
2025 |
Real in-country GFS tank (capability analogue, not a chilled store) |
Issue a duty schedule that states the peak cooling deficit, the hours of peak to cover, the supply temperature and the achievable off-peak charge window, then require the supplier to show how volume and diffuser layout deliver that duty. Reject a quote based on geometric volume alone: a store with a mixed thermocline delivers warm water long before it is empty. Because Italy applies general building and water instruments rather than a dedicated chilled-tank code, anchor the specification in those instruments and keep the lining records ready for review.
It stores cold water made off-peak and releases it at the afternoon price or demand peak, shaving demand and deferring chiller capacity.
From the peak-hour cooling deficit and the hours to cover, then checked against the temperature swing and stratification quality.
The Testo Unico building framework and UNI-EN technical standards, with EN 28765 commonly specified for a glass-fused-to-steel shell.
Usually not - a closed chiller loop is a process-contact system; potable rules apply only if a human-use connection exists.
GFS enamel for inert idle water, FBE for a specified duty, or stainless where the fluid is low-mineral and a fabricated vessel is preferred.
A sharp thermocline keeps stored cold usable; a mixed store delivers warm water long before the geometric volume is empty.
Thickness (0.25-0.45 mm for GFS or 180-280 micrometres for FBE), adhesion above 3,450 N/cm2 for GFS and 100 percent 1,500 V DC spark testing per panel.
Yes - the charge strategy only works if the low-cost or solar window coincides with the chiller's ability to charge the store.
About 30 days ex-works for a 1,000-10,000 m3 vessel, with bolted erection on site in weeks.
A 30-50 year shell lifecycle is expected, with the lining and diffuser internals driving maintenance.
Yes - the lining should be warranted separately because cycling stresses the coating more than the shell.
A verified single shell of 20,000 m3 was delivered in 2016, setting the upper bound for one bolted tank.
No - it is a real Italian GFS municipal-water tank cited as an in-country capability analogue, not a claimed chilled store.
Yes - GFS, FBE and stainless bolted tanks sized from the real duty with documentable lining and construction records.
Only if its off-peak capacity and the available window can deliver the required charge - this should be checked against the duty schedule.
A chilled-water storage tank in Italy is sized from the peak deficit and cover hours, with usable capacity set by stratification. Check the charge window, demand lining evidence, and anchor the spec in Italian building and water instruments.
Suggested CTA: State peak deficit, cover hours and supply temperature, and require a stratification strategy before ordering an Italy chilled-water tank.