| Place of Origin: | CHINA |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20180508003 |
| Minimum Order Quantity: | 1 SET |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | CHINA | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W20180508003 |
| Coating Color: | Dark Green, Or Customizing Colors | Coating Thickness: | 0.25~0.40mm, Double Coating |
| Acid And Alkalinity Proof: | Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 | Adhesion: | 3,450N/cm |
| Hardness: | 6.0 Mohs | Holiday Test: | >1500V |
| Installation: | By Jacking Machine Or Steel Pole, Fast In Installation | Permeability: | Gas / Liquid Impermeable |
| Foundation: | Concrete Or Glass Fused Steel | Steel Grade: | ART 310 |
| Applications: | Water , Waste Water, Digester , Reactor , Grain , Sludge , Chemicals | Highlight: | Industrial Water Tanks Sweden,Data Center Water Tank,Environmental Code Water Supply |
A data center water tank in Sweden is a storage vessel that holds makeup water, process top-up or an isolated fire reserve for a Swedish colocation or hyperscale site, and the specification is shaped by water permitting and the potable-contact rules that apply to the site. Sweden hosts a fast-growing data-center market where large, steady makeup demand meets strict environmental and drinking-water expectations. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks engineered for water duty, with more than 30,000 installed tank projects across 100-plus countries. This article sets out the compliance-first specification baseline a Swedish data-center project should work from.
A single water tank on a Swedish data-center site can serve three distinct duties: evaporated-cooling makeup, closed-loop or process top-up, and a fire reserve held under separate control. Treating them as one volume is the most common specification error, because the potable-contact and backflow requirements differ between a makeup line and a fire line. The correct approach assigns a defined volume and a documented isolation point to each duty, then sizes the shell for the sum while keeping the quality boundaries explicit. In a cold climate, freeze protection and the winter design temperature are part of the tank specification from the outset.
For a data-center water tank in Sweden, abstraction and discharge are governed by the Environmental Code and the competent authority, and a permit may be required depending on the source and volume. Materials in contact with drinking water are subject to Swedish food-contact requirements and EU framework Regulation 1935/2004 where a potable claim is made, with a recognised scheme such as NSF/ANSI 61 used where specified. The shell falls under the Planning and Building Act (PBL) and Boverket's regulations. The local räddningstjänst sets the fire reserve and access conditions. Confirm each with the authority having jurisdiction at concept stage.
A thermal store, chilled-water buffer, data-center water reservoir or fire reserve sits idle or cycles slowly for most of its life, so the internal finish and the shell discipline matter more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 degrees C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated vessel is preferred. The caveat is that lining choice follows fluid chemistry and code duty, so the specifier should confirm pH, chloride load and pressure class rather than assume one construction fits every duty.
Sizing starts from the real duty calculation - thermal charge/discharge profile, chilled-water temperature swing, makeup and process balance, or fire hydraulic demand - not from a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, a 30-50 year tank lifecycle, the NSF/ANSI 61 or WRAS potable-contact option where relevant, and the local freeze or seismic margin then set the shell, roof and appurtenances. Every figure below is checked against the applicable standard and the authority having jurisdiction in the destination country.
Design parameter |
Typical value or range |
Why it matters |
Makeup peak flow |
Site-specific m3/h |
Sets drawdown and refill rate |
Separated duty volumes |
Makeup + process + fire |
Prevents quality cross-contamination |
Potable-contact option |
NSF/ANSI 61 / EU 1935/2004 |
Required where water feeds human-use system |
Backflow protection |
Isolated, verified connections |
Protects the public supply |
Freeze margin |
Site-specific winter temperature |
Protects an outdoor tank |
Coating thickness |
0.25-0.45 mm enamel / 180-280 um FBE |
Idle-water surface integrity |
Adhesion |
above 3,450 N/cm2 (GFS) |
Lining integrity on drawdown |
Spark test |
1,500 V DC per panel |
Holiday verification |
The figure below is a REAL Center Enamel delivery cited here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed thermal-energy-storage, chilled-water, data-center water or fire-water delivery in the named country. Center Enamel's verified project record (case_library.csv) holds no dedicated TES, chilled-water, data-center-water or Belgium/Poland/Italy/Sweden/Finland fire-water tank project for this specific duty; where a real in-country tank exists it is cited as the closest analogue, never as the named application. Poland, Finland and Belgium have no in-country project entries in the available source at all. This reference demonstrates the ability to engineer large coated and bolted water tanks for demanding duty, not a claim about this specific application or geography. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Guadeloupe drinking-water tank |
Guadeloupe |
GFS bolted tank |
1 tank, 1,213 m3 |
2024 |
Real potable-water tank (capability, not a Sweden data-center water project) |
Issue a duty schedule that names each stored volume, its water quality, its refill and drawdown rates and its isolation point, then require the supplier to demonstrate the lining system, coating thickness, adhesion and spark-test record. Reject a proposal that quotes only a geometric volume with no link to the makeup balance or the fire demand. Because Swedish environmental and drinking-water expectations are high, the winning specification lets the operator prove compliance from the tank documentation alone and shows a clear freeze-protection detail.
It can hold evaporated-cooling makeup, closed-loop top-up water and an isolated fire reserve - each a separate volume with its own quality and isolation requirements.
The competent authority under the Environmental Code; permits and conditions depend on the water source and volume.
Where the stored water feeds a human-use system, Swedish drinking-water and EU 1935/2004 requirements apply, with a recognised scheme such as NSF/ANSI 61 used where specified.
Only with separately assigned volumes and documented isolation and backflow protection; the water-quality and control requirements differ.
GFS enamel for inert standby water, FBE or galvanized for specified or cost-sensitive duty, and stainless where the fluid is low-mineral.
From the makeup peak flow and drawdown/refill balance plus the separately calculated fire reserve - not from a generic rule of thumb.
Thickness (0.25-0.45 mm for GFS or 180-280 micrometres for FBE), adhesion above 3,450 N/cm2 for GFS and 100 percent 1,500 V DC spark testing per panel.
Yes - an outdoor or unheated tank needs a site-specific freeze margin and roof detail sized to the Swedish winter design temperature.
About 30 days ex-works for a 1,000-10,000 m3 vessel, with bolted erection on site in weeks.
A 30-50 year shell lifecycle is expected; the lining drives the maintenance interval under cyclic water duty.
Yes - the lining should be warranted separately because water chemistry and drawdown cycles stress the coating more than the shell.
A verified single shell of 20,000 m3 was delivered in 2016, setting the upper bound for one bolted tank.
No - it is a real potable-water tank cited as capability evidence, not a claimed Sweden data-center project.
The source lists a Swedish GFS biogas tank, but no data-center water tank; that project is used in the TES article, not here.
Because makeup, process and fire water have different quality and backflow requirements, and merging them makes compliance hard to demonstrate.
A data-center water tank in Sweden is specified around the Environmental Code, drinking-water rules and a clean separation of makeup, process and fire volumes, with a freeze-protection detail. Size it from the real water balance and demand lining evidence.
Suggested CTA: Issue a per-duty water schedule and require documentable lining evidence before ordering a Sweden data-center water tank.