| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External | Adhesion: | 3,450N/cm |
| Steel Grade: | ART 310 | Size Of Panel: | 2.4M * 1.2M |
| Capactiy Available: | 20 M3 To 20,000 M3 | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Easy To Cle: | Smooth, Glossy, Inert, Anti-adhesion | Warranty Period: | 2 Years Free Of Charge |
| Impact Resistance: | Excellent | FeatureEco-friendly: | Durability |
| Capactiy Availabl: | E20 M3 To 20,000 M3 | Impact: | ResistanceExcellent |
| Applications: | Water , Waste Water, Digester , Reactor , Grain , Sludge , Chemicals | Defect Free: | Minimum Maintenance Needed |
| Steel Plates Thickness: | 3mm - 12mm , Depends On The Diameter & Height | Highlight: | CDU buffer tank sizing,coolant distribution unit loop,industrial water tank sizing |
A CDU buffer tank data center is the volume integrated into or beside a Coolant Distribution Unit that circulates coolant between the IT cold plates or immersion vessels and the building chilled water. The CDU is the interface where two loops meet, and its buffer keeps the primary (chilled-water) side and the secondary (IT coolant) side from fighting each other during a rack ramp, a glycol change or a unit trip. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks engineered for CDU-adjacent duty, with more than 30,000 installed tank projects across 100-plus countries. The right CDU buffer is sized from the CDU flow and the secondary-loop inventory, not from a generic factor.
A Coolant Distribution Unit moves heat from the IT coolant loop to the building chilled-water loop through a heat exchanger, pumps and controls, without mixing the fluids. The buffer tank on the CDU loop gives that interface a stable reference so a server hall event does not instantly disturb the central plant. In direct-to-chip and immersion designs the CDU is the most transients-sensitive node, and its buffer is the cheapest insurance against control upset.
A tank that supports a data-center cooling loop, thermal store or fire reserve sits idle for most of its life, so the internal finish and the shell discipline decide reliability more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated pressure vessel is preferred, and ASME BPVC Section VIII governs a vessel that exceeds the local pressure-equipment threshold. A caveat applies: the right lining depends on the fluid chemistry and the code duty, so the engineer should confirm pH, halide load and pressure class rather than assume one construction fits every duty.
Sizing starts from the actual duty calculation - loop volume and temperature swing, thermal charge/discharge profile, cooling-makeup balance or fire hydraulic demand - not a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, the tank lifecycle of 30-50 years, the NSF/ANSI 61 or WRAS potable-contact option and the freeze or tropical duty margin then set the shell, roof and appurtenances. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
| Design parameter | Typical value or range | Why it matters |
|---|---|---|
| CDU flow rate | Per-CDU cooling capacity | Primary sizing input |
| Secondary loop volume | IT side inventory | Drives buffer need |
| Temperature glide | Supply-return difference | Stratification target |
| Ramp rate | Rack kW per minute | Transient buffer driver |
| Coolant type | Water or water-glycol | Sets lining and expansion |
| Coating thickness | 0.25-0.45 mm enamel | Idle-surface integrity |
| Adhesion | above 3,450 N/cm2 | Lining failure resistance |
| Spark test | 1,500 V DC per panel | 100 percent holiday check |
The figure below is a REAL Center Enamel delivery used here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed data-center cooling, thermal-energy-storage, chilled-water, immersion, expansion or Germany/Ireland/Netherlands project. Center Enamel's verified project record (case_library.csv) holds no data-center cooling-loop, TES, chilled-water, immersion, expansion-vessel or DE/IE/NL tank delivery, so this reference demonstrates the ability to engineer large coated, stainless and bolted water tanks for demanding duty, not a claim about this specific application or geography. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
| Project | Country | Tank type | Volume | Year | Relevance |
|---|---|---|---|---|---|
| Jiangsu municipal water | China | Epoxy-coated bolted tank | 1,332 x2 m3 | 2025 | Real municipal water tank (capability, not CDU buffer) |
Require the buffer volume tied to the CDU flow and the secondary-loop inventory, the coolant chemistry and the coating documentation. Reject any proposal that quotes only a geometric volume with no link to the CDU control sequence, because the useful buffer is the volume that actually stabilizes the interface.
The volume on the Coolant Distribution Unit loop that stabilizes the interface between the IT coolant and the building chilled water.
A CDU buffer is the smaller volume at the single-unit interface; a liquid-cooling buffer is the broader secondary-loop volume.
The CDU is the most transient node where two loops meet, so a local buffer prevents IT events from disturbing the central plant.
From the CDU flow rate and the secondary-loop inventory, plus the rack ramp rate.
GFS enamel for inert standby, FBE or galvanized for specified duty, stainless where the coolant is low-mineral.
Yes - glycol changes the expansion factor and lining compatibility, so the chemistry must be fixed before sizing.
Thickness (0.25-0.45 mm GFS or 180-280 micrometres FBE), adhesion above 3,450 N/cm2 and 1,500 V DC spark testing per panel.
A shared secondary-loop buffer can, but each CDU still needs its local stability designed into the loop.
About 30 days ex-works for a 1,000-10,000 m3 equivalent scope.
A 30-50 year shell lifecycle, with the lining driving the maintenance interval.
Yes - the lining should be warranted because cyclic duty stresses the coating more than the steel.
A verified single shell of 20,000 m3 delivered in 2016.
Yes - GFS, FBE and stainless bolted tanks engineered for CDU-adjacent duty with the documentation plan review requires.
Immersion loops also benefit, because the tank-to-CDU loop is just as transient as a cold-plate loop.
Pump inertia does not store thermal energy; a buffer is the component that damps temperature and flow transients.
A CDU buffer tank data center stabilizes the Coolant Distribution Unit loop where the IT coolant meets the building chilled water, damping the transients that would otherwise reach the central plant. Its useful volume comes from the CDU flow and the secondary-loop inventory, and the coating evidence and coolant compatibility decide whether it earns its place.
Suggested CTA: Specify a CDU buffer tank on CDU flow, secondary-loop inventory and coolant chemistry before purchase.