| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | J2016012651 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | J2016012651 |
| Coating Color: | Can Be Customized | Coating Thickness: | 0.25mm~0.40mm & Double Coating |
| Adhesion: | 3,450N/cm | Elastic: | Same As Steel Sheet ,around 500KN /mm |
| Acid And Alkalinity Proof: | Standard Sheet PH:3~11 Special Sheet PH: 1~14 | Service Life: | ≥30 Years |
| Permeability: | Gas And Liquid Impermeable | Material: | Glass And Steel |
| Highlight: | industrial water tanks engineering checklist,fire water tank buyer checklist,industrial water tank manufacturer guide |
||
A fire water tank manufacturer is measured by what it can document, not what it can claim, because a fire reserve is bought once and trusted for decades. The engineering checklist starts with the coating system, moves to the structural and fire standards referenced on the drawings, and ends with a verified project of comparable size. Center Enamel has produced roughly 300,000 enamel-coated steel plates a year since 2008, completed more than 30,000 installed tank projects and supplies GFS, FBE and galvanized bolted fire-water tanks to 100-plus countries.
Fire water sits stagnant, so the checklist leads with the lining: enamel thickness of 0.25-0.45 mm, adhesion above 3,450 N/cm2 and a 1,500 V DC spark test on 100 percent of panels. Ask for the holiday and torque records from erection and the panel traceability that lets a future inspector confirm the lining shipped. A manufacturer that cannot produce panel-level evidence is a risk no fire-code authority will accept.
The drawings should reference AWWA D103-09 or EN 1090 for the bolted shell, NFPA 22 or EN 12845 for the fire system, and ISO 28765 for the enamel execution. FM Approvals Class 4020 or 4820 may be required by the insurer, and the manufacturer should state which components carry FM approval. Clear standard references up front prevent the plan-review rework that delays occupancy and insurance sign-off.
Fire water sits full but unused for years, then must work flawlessly on demand, so the lining matters more than pressure rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin with Ra below 0.8 micrometres, documented at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Hot-dip galvanized and Fusion-Bonded Epoxy bolted tanks cover cost-sensitive or documented-coating duties. Aluminum geodesic dome roofs (AWWA D108, API 650, EN 1090) keep weather out and heat in. A caveat applies: GFS suits most fire duty, but where the medium is aggressive beyond the enamel pH range, the right lining should be confirmed with the engineer rather than assumed. Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) builds the steel containment to AWWA D103-09 and ISO 28765, with more than 30,000 installed tank projects across 100-plus countries.
Sizing a fire water tank starts from the fire-protection engineer's hydraulic calculation, not a catalogue number. The required flow density of 4-12 L/min per square metre, the design area of operation of 140-480 square metres, the discharge duration of 30-90 minutes and the hazard class (Light through High Hazard) fix the usable volume of 9-200 m3 for European systems or larger for campus-scale reserves. The coating thickness of 0.25-0.45 mm, the refill window of 36 hours per EN 12845 and the freeze-protection margin of 1.0 metre for non-frost-proof tanks then set the shell, appurtenances and foundation. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
| Design parameter | Typical value or range | Why it matters |
| Coating thickness | 0.25-0.45 mm enamel | Stagnant-duty inert surface |
| Adhesion | above 3,450 N/cm2 | Decades without recoating |
| Spark test | 1,500 V DC, 100 percent | Source holiday verification |
| Structural code | AWWA D103-09 / EN 1090 | Bolted shell basis |
| Fire code | NFPA 22 / EN 12845 | System demand reference |
| Coating standard | ISO 28765 | Enamel QA and execution |
| Single-tank max | 20,000 m3 | One-shell upper bound |
| Lifecycle | 30-50 years | Buy-once trust basis |
The figures below are drawn from Center Enamel's verified fire-protection project record (case_library.csv). Each Project ID is allocated to exactly one article in this batch to avoid double-counting evidence. Where the source did not record a diameter or height, the field reads Not Provided and is not estimated. These are real water-storage deliveries for fire duty; they demonstrate the company's ability to engineer code-referenced bolted tanks, not a claim about any single standard's certification on that specific job.
| Project | Country | Tank type | Volume | Year | Relevance |
| China Shanxi fire protection | China | GFS bolted | 8,930 m3 (2 tanks) | 2023 | Large two-tank industrial fire reserve |
Score each manufacturer on coating QA, standard references, a verified comparable project and the engineering package for plan review. Disqualify any that cannot show panel-level lining evidence or a real project near your size, because those gaps surface as coating failure or failed occupancy, not as a line-item saving. Keep the warranty on the lining as well as the steel.
Panel-level coating evidence: 0.25-0.45 mm enamel thickness, above 3,450 N/cm2 adhesion and 1,500 V DC spark test on 100 percent of panels.
AWWA D103-09 or EN 1090 for structure, NFPA 22 or EN 12845 for the fire system, ISO 28765 for enamel, and FM 4020 or 4820 where the insurer requires.
A real project near your size and standard proves the manufacturer can deliver the coating, logistics and engineering, not just quote a tank.
A verified single shell of 20,000 m3 delivered in 2016, setting the one-tank upper bound.
A well-specified coated bolted tank serves 30-50 years; the lining and seals, not the shell, set the maintenance interval.
Yes - the lining, not only the steel, should be warranted because standby fire duty stresses the coating most.
Yes; Center Enamel supplies all three bolted constructions and selects the lining to duty, budget and standard.
Ex-works lead is about 30 days for a 1,000-10,000 m3 tank, with on-site bolted erection in weeks.
Yes - bolted fire-water tanks shipped to 100-plus countries, with more than 30,000 installed projects as supply evidence.
A fire water tank manufacturer should be evaluated with an engineering checklist that leads on coating QA, standard references and a verified comparable project, because the reserve is trusted for decades after a single purchase. Panel-level lining evidence and clear standard references on the drawings are the strongest predictors of passing plan review and performing on demand.
Suggested CTA: Run the fire-water tank manufacturer checklist on coating QA, standard references and a verified comparable project before purchase.