| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
An industrial process water tank for a data center stores the water the facility actually consumes in operation - cooling-tower makeup, humidification and ancillary processes - distinct from the IT load and from any reuse or recovery loop. Because data-center process water is a steady, schedulable demand, the tank's job is to buffer supply interruptions and balance makeup against recovery. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks with the inert finish and sealed roof that data-center process-water duty requires, delivered to 100-plus countries. The right tank is sized from the makeup and humidification rate, not a generic estimate.
Data-Center Process Water DemandA data center's process water is dominated by cooling-tower makeup and, where used, adiabatic or humidification water; it is steadier than IT load and tied to climate and schedule. The tank buffers this demand so a supply interruption or a recovery-batch gap never starves the cooling loop. Because the water is potable-adjacent or reuse-fed, the internal finish and the isolation from IT and from any fire reserve matter more than the volume.
Water stored for reuse, process or fire duty spends most of its life idle, so the internal finish decides reliability more than the shell rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the recovered water is low-mineral and a factory vessel is preferred. A caveat applies: the right lining depends on the recovered-water chemistry, so the engineer should confirm pH and halide load rather than assume one coating fits every reuse stream.
Sizing starts from the actual duty calculation - rainfall capture volume, cooling-makeup balance, greywater generation rate or fire hydraulic demand - not a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, the tank lifecycle of 30-50 years, the NSF/ANSI 61 or WRAS potable-contact option and the freeze or tropical duty margin then set the shell, roof and appurtenances. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
Design parameter |
Typical value or range |
Why it matters |
Demand |
cooling makeup and humidification |
Sets base draw rate |
Climate link |
humid sites use less makeup |
Adjusts volume by site |
Buffer role |
smooth supply gaps |
Protects cooling loop |
Coating thickness |
0.25-0.45 mm GFS |
Inert process-water surface |
FBE interior |
180-280 micrometres |
Alternative documented lining |
NSF/WRAS |
available for potable-adjacent |
Where contact risk exists |
Isolation |
from IT and fire reserve |
Prevents cross-contamination |
Tank lifecycle |
30-50 years |
Total-cost-of-ownership basis |
The figure below is a REAL Center Enamel delivery used here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed data-center, rainwater, greywater, reclaimed, condensate or ice-storage project. Center Enamel's verified project record (case_library.csv) holds no data-center water-reuse, greywater, reclaimed-water, condensate-recovery or ice-storage delivery, so this reference demonstrates the ability to engineer large coated and stainless water tanks for demanding duty, not a claim about this specific application. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Ghana water tank |
Ghana |
GFS bolted |
3,232 m3 |
2025 |
Large coated water tank; capability, not DC process water |
Size the tank from the makeup and humidification rate and the site climate, then select a lining and sealed roof that protect the potable-adjacent or reuse-fed water. Keep the process tank isolated from the IT loop and from the code-referenced fire reserve, and document the coating so the authority having jurisdiction can verify the stored water is fit for the process.
A vessel that stores the water a data center consumes in operation - cooling-tower makeup and humidification - distinct from IT load and from reuse or recovery loops.
How is data-center process water different from reuse water?Process water is the facility's steady operational demand, while reuse water is a recovered source that feeds the process tank; they are stored and piped separately.
What drives data-center process water demand?Cooling-tower makeup dominates, with humidification adding climate-tied volume; the demand is steadier than IT load.
What tank material suits data-center process water?GFS enamel gives an inert skin; FBE and stainless are alternatives where the stored water chemistry directs.
Does the process tank need isolation from the fire reserve?Yes - the fire reserve is a separate code-referenced volume and must stay isolated from the process-water loop.
Does process water need NSF or WRAS approval?Where the water is potable-adjacent, NSF/ANSI 61 or WRAS approval is selected on the lining.
How is the process tank volume sized?From the makeup and humidification rate and the site climate, so the tank buffers supply gaps without overflowing or running dry.
Does Center Enamel build data-center process water tanks?Yes - GFS, FBE and stainless bolted tanks with the inert finish and sealed roof that process-water duty requires, delivered to 100-plus countries.
What standards apply to process water tanks?AWWA D103-09 and ISO 28765 for the bolted structure, with NSF/ANSI 61 or WRAS available where the lining contacts potable-adjacent water.
How long is the ex-works lead time for a bolted water tank?About 30 days ex-works for a 1,000-10,000 m3 tank, with on-site bolted erection in weeks versus months for concrete.
What is the single largest bolted tank Center Enamel has built?A verified single shell of 20,000 m3 was delivered in 2016, establishing the upper bound for one bolted tank.
Why is coating evidence important for process tanks?Process-water quality is unforgiving; documented 0.25-0.45 mm enamel or 180-280 micrometre FBE predicts it will not contaminate the stream.
Should the warranty cover the lining?Yes - the lining, not only the steel, should be warranted, because process-water duty stresses the coating over a 30-50 year life.
How is the process tank inspected over its life?Periodic internal inspection of the lining and verification of appurtenances support a 30-50 year service life.
Is a process tank a fire-reserve substitute?No - the fire reserve is a separate code-referenced volume and must stay isolated from the process-water loop.
ConclusionA data-center process water tank stores the facility's steady operational demand - cooling-tower makeup and humidification - and buffers supply gaps so the cooling loop never starves. The demand-based volume, inert finish and isolation from the IT loop and fire reserve decide reliability more than the headline size, and those figures must come from the makeup and humidification rate rather than a generic estimate.
Suggested CTA: Specify a data-center process tank from makeup and humidification demand, isolate it from the IT loop and fire reserve, and select a protective lining.