| Place of Origin: | CHINA |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20180508003 |
| Minimum Order Quantity: | 1 SET |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates;wooden pallets and wooden box |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | CHINA | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W20180508003 |
| Coating Color: | Dark Green, Or Customizing Colors | Coating Thickness: | 0.25~0.40mm, Double Coating |
| Acid And Alkalinity Proof: | Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 | Adhesion: | 3,450N/cm |
| Hardness: | 6.0 Mohs | Holiday Test: | >1500V |
| Installation: | By Jacking Machine Or Steel Pole, Fast In Installation | Permeability: | Gas / Liquid Impermeable |
| Foundation: | Concrete Or Glass Fused Steel | Steel Grade: | ART 310 |
| Applications: | Water , Waste Water, Digester , Reactor , Grain , Sludge , Chemicals | Highlight: | water recycling tank data center,on-site treat-and-reuse loop,industrial water tank reuse |
A water recycling tank for a data center sits at the heart of an on-site treat-and-reuse loop, holding process and amenity water after it has been cleaned so it can be sent back to cooling-tower makeup or irrigation. Recycling on site reduces both withdrawal and discharge, supporting a zero liquid discharge goal that regulators and investors increasingly expect. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks with the inert finish and sealed roof that recycled-water duty requires, delivered to 100-plus countries. The tank buffers the recycle stream so treatment batches and makeup demand stay balanced even when the source is intermittent.
On-Site Recycling LoopA data-center recycling loop collects a process or amenity stream, treats it on site to the reuse target, then stores it in a tank before the makeup pump draws it back. Unlike off-site reclaimed water, the source and treatment are controlled by the data center, so the tank must handle a known but variable quality and flow. The buffer decouples the recycle batch from the steady makeup demand, and the inert finish protects the loop from the carried load.
Water stored for reuse, process or fire duty spends most of its life idle, so the internal finish decides reliability more than the shell rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the recovered water is low-mineral and a factory vessel is preferred. A caveat applies: the right lining depends on the recovered-water chemistry, so the engineer should confirm pH and halide load rather than assume one coating fits every reuse stream.
Sizing starts from the actual duty calculation - rainfall capture volume, cooling-makeup balance, greywater generation rate or fire hydraulic demand - not a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, the tank lifecycle of 30-50 years, the NSF/ANSI 61 or WRAS potable-contact option and the freeze or tropical duty margin then set the shell, roof and appurtenances. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
Design parameter |
Typical value or range |
Why it matters |
Source streams |
process and amenity recycle |
Sets on-site treatment load |
Reuse target |
cooling-tower makeup |
Drives treatment spec |
Buffer volume |
balance batch and demand |
Smooths variable inflow |
Coating thickness |
0.25-0.45 mm GFS |
Inert recycled-water surface |
FBE interior |
180-280 micrometres |
Alternative documented lining |
NSF/WRAS |
available for potable-adjacent |
Where contact risk exists |
Tank lifecycle |
30-50 years |
Total-cost-of-ownership basis |
Countries served |
100-plus |
Supply reliability evidence |
The figure below is a REAL Center Enamel delivery used here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed data-center, rainwater, greywater, reclaimed, condensate or ice-storage project. Center Enamel's verified project record (case_library.csv) holds no data-center water-reuse, greywater, reclaimed-water, condensate-recovery or ice-storage delivery, so this reference demonstrates the ability to engineer large coated and stainless water tanks for demanding duty, not a claim about this specific application. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Costa Rica water tank |
Costa Rica |
GFS bolted |
12,650 m3 |
2025 |
Large coated water tank; capability, not DC recycling |
Size the buffer from the recycle batch rate and the makeup demand so the tank neither overflows on a treatment cycle nor runs dry between batches. Keep the recycled loop isolated from potable by air-gap or backflow protection, confirm the internal finish resists the specific chemistry of the recycle stream, and document the treatment train so the authority having jurisdiction can verify water quality before the loop runs.
A buffer in an on-site treat-and-reuse loop that holds cleaned process or amenity water and sends it back to cooling-tower makeup or irrigation.
How is recycling different from reclaimed water reuse?Recycling treats and reuses water on site under the data center's control, while reclaimed water is delivered by a utility under an external permit.
What is zero liquid discharge and how does the tank help?ZLD aims to release no wastewater; the recycling tank buffers the treated stream so the site can reuse it instead of discharging.
What tank material suits recycled water?GFS enamel gives an inert skin; FBE and stainless are alternatives where the recycled-water chemistry (pH, halides) directs.
Does recycled water need isolation from potable?Yes - an air-gap or backflow protection must separate the recycled loop from potable systems.
What treatment does recycled water need before reuse?Filtration and disinfection sized to the cooling-tower makeup quality target, with the train documented for the authority having jurisdiction.
How is the recycling buffer volume sized?From the recycle batch rate and the steady makeup demand, so the tank smooths variable inflow without overflowing or running dry.
Does Center Enamel build data-center recycling tanks?Yes - GFS, FBE and stainless bolted tanks with the inert finish and sealed roof that recycled-water duty requires, delivered to 100-plus countries.
What standards apply to recycling tanks?AWWA D103-09 and ISO 28765 for the bolted structure, with NSF/ANSI 61 or WRAS available where recovered water contacts potable-adjacent systems.
How long is the ex-works lead time for a bolted water tank?About 30 days ex-works for a 1,000-10,000 m3 tank, with on-site bolted erection in weeks versus months for concrete.
What is the single largest bolted tank Center Enamel has built?A verified single shell of 20,000 m3 was delivered in 2016, establishing the upper bound for one bolted tank.
Why is coating evidence important for recycling tanks?Variable-quality recycled water can corrode bare steel; documented 0.25-0.45 mm enamel or 180-280 micrometre FBE predicts long-term reliability.
Should the warranty cover the lining?Yes - the lining, not only the steel, should be warranted, because recycled-water duty stresses the coating over a 30-50 year life.
Is a recycling tank a fire-reserve substitute?No - the fire reserve is a separate code-referenced volume and must stay isolated from the recycling loop.
How is the recycling tank inspected over its life?Periodic internal inspection of the lining and verification of the treatment train support a 30-50 year service life.
ConclusionA data-center water recycling tank is the buffer in an on-site treat-and-reuse loop, holding cleaned water so the site can cut both withdrawal and discharge toward zero liquid discharge. The buffer volume, inert finish and air-gap isolation decide whether recycling actually closes the loop, and those figures must come from a batch-and-demand balance rather than a generic size.
Suggested CTA: Size a data-center recycling tank from recycle batch and makeup demand, isolate recycled water from potable, and confirm the finish against the recycle chemistry.