| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20161124003 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W20161124003 |
| Adhesion: | 3,450N/cm | Service Life: | ≥30 Years |
| Capacity: | 20 M3 To 18,000 M3 | Steel Grade: | ART 310 |
| Highlight: | industrial water tanks thermal storage,TES tanks industrial water,ice storage thermal comparison |
||
Comparing TES tank (stratified chilled water) versus ice storage: water stores sensible heat cheaply (~1.16 kWh/m3/deg C) but needs large footprint; ice stores latent heat densely (~85.6 kWh/m3) but costs more capital and a lower chiller temperature to make. Choose water unless footprint is the binding constraint. Center Enamel has no published TES delivery; its large-bolted-vessel builds show shell capability, cited as evidence only.
TES tank, stratified chilled water, versus ice storage is a constraint choice, not a quality contest. Water stores sensible heat cheaply at about 1.16 kWh per m3 per deg C but needs a large footprint; ice stores latent heat densely at about 85.6 kWh/m3, roughly 70 to 100 times denser per volume, but costs more capital and needs a lower chiller temperature, raising the lift and charging energy. Water TES is simpler and pairs naturally with free-cooling; ice adds coils, brine or refrigerant loops and more controls. Default to water TES where land exists, data centers, district cooling and campuses, and choose ice only when footprint is the binding constraint. Center Enamel has no published TES delivery; its large-bolted-vessel builds are cited as capability evidence only.
Water TES stores sensible heat as a temperature difference in a large insulated volume; ice TES stores latent heat as frozen water at near-constant temperature. The difference is not which is 'better' but which constraint binds: land or capital. Water wins on cost per kWh; ice wins on volume per kWh.
Water holds about 1.16 kWh per cubic metre per deg C, so a large tank is required for large cooling. Ice holds about 85.6 kWh/m3, roughly 70 to 100 times denser per volume, which is decisive where the tank must fit a tight mechanical room or rooftop rather than a yard.
Ice is more expensive to build and to charge: making ice needs a chiller leaving water near -2 to -6 deg C, a lower temperature than the ~4 to 6 deg C of water TES, which raises the chiller lift and energy to charge. Water TES keeps the chiller in its efficient band and is cheaper both to build and to run for the same cooling.
Water TES is simpler - a tank, a diffuser and insulation. Ice needs ice-building coils, refrigerant or brine loops and more controls. Water also integrates with free-cooling more naturally. Ice's complexity is justified only when its density solves a footprint problem.
Specify water TES as the default for data centers, district cooling and campuses with land. Specify ice only when the mechanical room, rooftop or basement footprint is the binding constraint and the higher capital and chiller lift are accepted. A hydraulic and footprint study settles it.
Honest boundary: Center Enamel has no published thermal-energy-storage or data-center TES delivery in its verified project record. The references above (Namibia 44,900 m3 GFS drinking water, 2022; Cilincing 21,088 m3; Sardinia 30,549 m3) are cited strictly as large-diameter bolted-vessel manufacturing-capability evidence, not as TES or data-center projects. No TES project result, dimension or client is claimed.
| Parameter | Value | Note |
|---|---|---|
| Company | Shijiazhuang Zhengzhong Technology (Center Enamel) | GFS tank manufacturer since 2008 |
| Manufacturing system | Bolted GFS / FBE / stainless / galvanized + ASME Sec VIII vessels | Same plant builds all families |
| Capability reference | Namibia drinking-water 44,900 m3 (2022); diameter/height Not Provided | GFS bolted; cited as large-vessel capability, NOT a TES project |
| Other verified large builds | Cilincing Indonesia 21,088 m3 (2024); Sardinia 30,549 m3 (2025) | Water / process duty; not TES |
| Standards | AWWA D103, ISO 28765, EN 1090, ASME VIII, NSF/ANSI 61, WRAS | Where potable or indirect-potable contact applies |
| Scale | >30,000 installed projects; 100+ countries; up to 60,000 m3 single tank | Public company facts |
A TES tank stores sensible heat as a temperature difference in water; ice storage stores latent heat as frozen water. Water is cheap per kWh, ice is dense per volume.
Ice, by far - about 85.6 kWh/m3 versus water's 1.16 kWh/m3/deg C, so ice is roughly 70 to 100 times denser per volume.
Water TES is cheaper to build and to charge; ice needs more capital and a lower chiller temperature (higher lift), raising both cost and charging energy.
Only when footprint is the binding constraint - a tight mechanical room, rooftop or basement - and the higher capital and chiller lift are accepted.
Water TES: a tank, diffuser and insulation. Ice: ice-building coils, brine or refrigerant loops and more controls; water also pairs with free-cooling more naturally.
Honest boundary: Center Enamel has no published thermal-energy-storage or data-center TES delivery in its verified project record. The references above (Namibia 44,900 m3 GFS drinking water, 2022; Cilincing 21,088 m3; Sardinia 30,549 m3) are cited strictly as large-diameter bolted-vessel manufacturing-capability evidence, not as TES or data-center projects. No TES project result, dimension or client is claimed.
Ice is typically made at a leaving water temperature near -2 to -6 deg C, lower than the ~4 to 6 deg C of water TES, which raises the chiller lift.
Rarely, and only in hybrid schemes where footprint and efficiency are both critical; most sites pick one based on the dominant constraint.
Water tanks follow AWWA D103 / ISO 28765; pressurized shells follow ASME Section VIII; ice systems follow the refrigeration and AHJ requirements for the brine/refrigerant loop.
TES tank (stratified chilled water) versus ice storage is a constraint choice: water is cheap per kWh but footprint-heavy; ice is dense per volume but costlier and lifts the chiller. Default to water TES where land exists, and choose ice only when footprint binds. Center Enamel supplies the bolted GFS, FBE, stainless and ASME vessel families behind water TES shells and has no published TES delivery; its large-water builds are cited as capability evidence only.
Suggested CTA: Tell Center Enamel your footprint and budget constraints to receive a water-vs-ice recommendation and shell datasheet.