| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20160504018 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W20160504018 |
| Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External | Tank Material: | Glass Fused To Steel |
| Corrosion Integrity: | Excellent | Chemical Resistance: | Excellent |
| Highlight: | NFPA 22 water storage tanks,data center fire protection tanks,pump integrated water tanks |
||
Fire protection water storage tanks for data centers are designed around the fire pump, not as a standalone reservoir, because the pump sets the suction, the drawdown curve and the reliability the hall depends on. NFPA 22 governs site-built water tanks for private fire protection, defining the volume, appurtenances and access the authority having jurisdiction expects. Center Enamel supplies bolted GFS, FBE and galvanized tanks engineered to NFPA 22 with the suction, anti-vortex and level details a data-center fire pump requires, shipped to 100-plus countries.
NFPA 22 Tank RequirementsNFPA 22 sets the rules for site-built fire tanks: properly configured suction and discharge, anti-vortex plates, level instrumentation, overflow, vents, freeze protection and OSHA-compliant access. For a data center the standard also frames the usable volume between normal and lowest effective levels that the fire pump can actually draw during drawdown. The tank is a system component, not a generic reservoir, so the drawings must show these appurtenances explicitly rather than leaving them to the installer.
The fire pump draws from the tank through a suction main sized so the required net positive suction head is available at the lowest effective level, not just at full. Anti-vortex plates and a sump maintain that margin as the tank draws down over the 30-90 minute event. Where redundancy is required, separate suction mains feed separate pumps so a single failure cannot remove fire protection, mirroring the hall's own redundancy model.
Fire water sits full but unused for years, then must work flawlessly on demand, so the lining matters more than pressure rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin with Ra below 0.8 micrometres, documented at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Hot-dip galvanized and Fusion-Bonded Epoxy bolted tanks cover cost-sensitive or documented-coating duties. Aluminum geodesic dome roofs (AWWA D108, API 650, EN 1090) keep weather out and heat in. A caveat applies: GFS suits most fire duty, but where the medium is aggressive beyond the enamel pH range, the right lining should be confirmed with the engineer rather than assumed. Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) builds the steel containment to AWWA D103-09 and ISO 28765, with more than 30,000 installed tank projects across 100-plus countries.
Sizing a fire water tank starts from the fire-protection engineer's hydraulic calculation, not a catalogue number. The required flow density of 4-12 L/min per square metre, the design area of operation of 140-480 square metres, the discharge duration of 30-90 minutes and the hazard class (Light through High Hazard) fix the usable volume of 9-200 m3 for European systems or larger for campus-scale reserves. The coating thickness of 0.25-0.45 mm, the refill window of 36 hours per EN 12845 and the freeze-protection margin of 1.0 metre for non-frost-proof tanks then set the shell, appurtenances and foundation. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
Design parameter |
Typical value or range |
Why it matters |
Standard |
NFPA 22 / NFPA 20 |
Private fire protection basis |
Discharge duration |
30-90 minutes |
From hazard class |
Usable volume |
normal to lowest effective |
Pump drawdown volume |
Suction NPSH |
available at lowest level |
Not only at full tank |
Coating thickness |
0.25-0.45 mm enamel |
Idle-duty inert surface |
Adhesion |
above 3,450 N/cm2 |
No lining loss on drawdown |
Spark test |
1,500 V DC per panel |
100 percent holiday check |
Access |
OSHA-compliant |
Safe inspection and maintenance |
The figures below are drawn from Center Enamel's verified fire-protection project record (case_library.csv). Each Project ID is allocated to exactly one article in this batch to avoid double-counting evidence. Where the source did not record a diameter or height, the field reads Not Provided and is not estimated. These are real water-storage deliveries for fire duty; they demonstrate the company's ability to engineer code-referenced bolted tanks, not a claim about any single standard's certification on that specific job.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
China Hubei fire protection |
China |
GFS bolted |
1,320 m3 (2 tanks) |
2023 |
Split two-tank reserve |
Hand the fire-protection engineer the tank's drawdown curve, the anti-vortex and suction geometry and the coating documentation so the pump curve and tank volume are verified together. Confirm the usable volume after clearances, not the geometric volume, and keep the fire suction isolated from any makeup or process tie. Submit the NFPA 22 appurtenance list with the drawings to avoid plan-review rework.
Configured suction and discharge, anti-vortex plates, level instrumentation, overflow, vents, freeze protection and OSHA access, with usable volume shown for pump drawdown.
How does the fire pump affect tank design?The pump sets suction size, drawdown curve and reliability; the tank must supply required NPSH at the lowest effective level, not just when full.
What is usable volume under NFPA 22?The water between the normal level and the lowest effective level after anti-vortex and suction clearance - the volume the fire pump can actually draw.
Why separate suction mains for data-center fire tanks?Redundant pumps need separate suction so a single failure cannot remove fire protection, matching the hall's redundancy model.
How long must a data-center fire tank sustain the pump?Typically 30-90 minutes per hazard class, set by the fire-protection engineer's hydraulic design.
What lining suits an NFPA 22 fire tank?GFS enamel for maintenance-free standby; FBE or galvanized where specified, all with documented coating evidence.
Does Center Enamel build NFPA 22 fire tanks for data centers?Yes - bolted GFS, FBE and galvanized tanks engineered to NFPA 22 with fire-pump suction details, shipped to 100-plus countries.
How is the tank inspected over its life?Per NFPA 25 or local equivalent, with external level checks and periodic internal inspection of the lining and appurtenances.
What standards pair with NFPA 22 on the structure?AWWA D103-09 and EN 1090 for the bolted shell, ISO 28765 for the enamel coating execution.
ConclusionFire protection water storage tanks for data centers are designed around the NFPA 22 fire pump, with usable volume, anti-vortex suction and level instrumentation verified together. Treating the tank as a system component rather than a standalone reservoir is what passes plan review and delivers reliable pump drawdown when the hall needs it.
Suggested CTA: Design a data-center fire tank around the NFPA 22 pump: verify usable volume, anti-vortex suction and level instrumentation together, not separately.