| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | J2016012323 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | J2016012323 |
| Permeability: | Gas / Liquid Impermeable | Steel Plates Thickness: | 3mm - 12mm , Depends On The Diameter & Height |
| Hardness: | 6.0 ( Mohs ) | Adhesion: | 3,450 N/cm |
| Service Life: | Over 30 Years | Capacity: | 20 K3 - 18,000 M3 |
| Highlight: | fire fighting water tank,hydrant and standpipe reserve,data center water tank |
||
Share your data-center hydrant and standpipe demand with Center Enamel for a bolted fire-fighting tank specification.
A fire fighting water tank for data centers extends the reserve beyond automatic sprinklers to hydrants, standpipes and hose streams that firefighters connect to during an event. The data-center context demands that this fighting reserve stay isolated, redundant and verifiable alongside the sprinkler and process systems. Center Enamel supplies bolted GFS, FBE and galvanized tanks with the coating and isolation discipline that a combined fire-fighting reserve requires, delivered to 100-plus countries with panel-level coating documentation.
Beyond the sprinkler flow, the fire fighting water tank must supply hydrant and standpipe demand for the duration the fire-protection engineer sets, often adding hose-stream flow of 10-30 L/s to the sprinkler base. In a data center the reserve is therefore larger than a pure sprinkler tank and must be drawn through separate, clearly labeled connections so firefighters and the pre-action system do not compete for the same suction during an event.
Large data-center campuses split the fire-fighting reserve across isolated tanks so a single failure cannot remove the hydrant and standpipe supply. The N-plus-1 logic applies to the fighting reserve exactly as to the sprinkler reserve, and the authority having jurisdiction verifies that the worst single failure still leaves the required usable volume. Externally readable level indicators let both facility staff and firefighters confirm the reserve without entry.
Fire water sits full but unused for years, then must work flawlessly on demand, so the lining matters more than pressure rating. Glass-Fused-to-Steel panels are fired at 820-930 °C to give a smooth inert skin with Ra below 0.8 micrometres, documented at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Hot-dip galvanized and Fusion-Bonded Epoxy bolted tanks cover cost-sensitive or documented-coating duties. Aluminum geodesic dome roofs (AWWA D108, API 650, EN 1090) keep weather out and heat in. A caveat applies: GFS suits most fire duty, but where the medium is aggressive beyond the enamel pH range, the right lining should be confirmed with the engineer rather than assumed. Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) builds the steel containment to AWWA D103-09 and ISO 28765, with more than 30,000 installed tank projects across 100-plus countries.
Sizing a fire water tank starts from the fire-protection engineer's hydraulic calculation, not a catalogue number. The required flow density of 4-12 L/min per square metre, the design area of operation of 140-480 square metres, the discharge duration of 30-90 minutes and the hazard class (Light through High Hazard) fix the usable volume of 9-200 m3 for European systems or larger for campus-scale reserves. The coating thickness of 0.25-0.45 mm, the refill window of 36 hours per EN 12845 and the freeze-protection margin of 1.0 metre for non-frost-proof tanks then set the shell, appurtenances and foundation. Every figure below is confirmed against the applicable standard and the local authority having jurisdiction.
Design parameter |
Typical value or range |
Why it matters |
Hose-stream flow |
10-30 L/s added |
Beyond sprinkler base |
Discharge duration |
30-90 minutes |
Set by engineer |
Usable volume |
normal to lowest effective |
Drawable fighting reserve |
Redundancy |
N-plus-1 split tanks |
Single failure leaves required volume |
Coating thickness |
0.25-0.45 mm enamel |
Idle-duty inert surface |
Adhesion |
above 3,450 N/cm2 |
No lining loss on drawdown |
Spark test |
1,500 V DC per panel |
100 percent holiday check |
Level indicator |
externally readable |
Confirm reserve without entry |
The figures below are drawn from Center Enamel's verified fire-protection project record (case_library.csv). Each Project ID is allocated to exactly one article in this batch to avoid double-counting evidence. Where the source did not record a diameter or height, the field reads Not Provided and is not estimated. These are real water-storage deliveries for fire duty; they demonstrate the company's ability to engineer code-referenced bolted tanks, not a claim about any single standard's certification on that specific job.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Chile fire protection |
Chile |
GFS bolted |
134 m3 (1 tank) |
2026 |
Compact single-tank reserve |
Add hydrant and standpipe demand to the sprinkler hydraulic base, convert to usable volume after anti-vortex and suction clearance, and keep the fighting connections isolated from process draws. Confirm with the authority having jurisdiction which reserves must be separate versus combinable, because some jurisdictions require the hydrant reserve to be independently verifiable even when shared in one bolted system.
A reserve that supplies hydrants, standpipes and hose streams beyond the automatic sprinkler system, kept isolated and redundant alongside the sprinkler and process systems.
Hose-stream demand of often 10-30 L/s is added to the sprinkler base for the set duration, making the fighting reserve larger than a pure sprinkler tank.
On large campuses they are often split for N-plus-1 redundancy; some jurisdictions require the hydrant reserve to be independently verifiable even within one bolted system.
Externally readable level indicators let facility staff and firefighters confirm the reserve without confined-space entry.
NFPA 22 and NFPA 20 in North America, EN 12845 and EN 1090 in Europe, with AWWA D103-09 and ISO 28765 for the bolted structure and enamel.
GFS enamel for maintenance-free standby; FBE or galvanized where specified, all with documented coating evidence.
Yes - bolted GFS, FBE and galvanized fire-fighting tanks with isolation and coating discipline, shipped to 100-plus countries.
Typically 30-90 minutes per the hazard class and the fire-protection engineer's hydraulic design.
So a process draw or makeup event can never starve the fire-fighting reserve during an emergency.
A fire fighting water tank for data centers extends the reserve to hydrants and standpipes, sized by adding hose-stream demand to the sprinkler base and kept isolated and redundant. The usable volume and clear connection labeling decide whether firefighters and the pre-action system can draw reliably during an event without competing for the same suction.
Suggested CTA: Size a data-center fighting tank by adding hydrant and standpipe demand to the sprinkler base, keep it isolated and redundant, and verify usable volume with the AHJ.