| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Body Color: | Dark Green / Can Be Customized | Corrosion Integrity: | Excellent |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Chemical Resistance: | Excellent |
| Size Of Panel: | 2.4M * 1.2M | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Highlight: | bolted steel tank construction,glass fused steel tanks,bolt-up tank usage |
||
A bolted steel tank is a storage vessel assembled on site from factory-coated steel panels joined with 8.8-grade bolts, avoiding field welding. The factory enamel or epoxy coating is applied under controlled conditions and verified to AWWA D103-09 and ISO 28765. Engineered by Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel), bolted tanks reach 20-60,000 m3 and a 30-50 year design life.
A bolted steel tank is a vessel built from flat steel panels shipped to site and fastened with 8.8-grade bolts and gaskets, rather than welded. The coating is fused or cured in the factory to 0.25-0.45 mm, then holiday-tested at 1500 V, so quality is repeatable. Capacities reach 20-60,000 m3, and the shell is calculated to AWWA D103-09 and ISO 28765.
Bolted tanks are classified by coating: Glass-Fused-to-Steel (GFS) with enamel fused at 820-930°C, Fusion Bonded Epoxy (FBE), or galvanized. All use bolted shells with sealed roofs, manways, and nozzles. The panel system allows flat-pack shipping, and the same bolting principle scales from 20 m3 compact units to 60,000 m3 bulk storage.
They serve water, wastewater, biogas, grain, and fire protection where site welding is costly or remote. Because the coating is factory-applied, bolted tanks suit corrosive duties (pH 3-11, 1-14 special) and climates from -20 to 50°C. EPC contractors favor them where logistics and erection speed outweigh the very largest single volumes.
The shell is calculated to AWWA D103-09 and ISO 28765, plates blasted to Sa 2.5 and coated to 0.25-0.45 mm, then holiday-tested at 1500 V. Bolts are 8.8-grade with sealing gaskets; the foundation is designed for the hydrostatic head. Each panel is QA-tagged, so the assembled tank is fully traceable and auditable.
Bolted steel tanks erect faster and with better coating control than welded tanks, and they ship flat-packed. The limitation is capacity: a single bolted tank tops out near 60,000 m3, so duties above that use welded construction or multiple manifolded bolted tanks. This boundary is a logistics decision, not a quality gap.
The figures below are the load-bearing values a supplier should quote per bolted tank; capacities reach 60,000 m3 and design life runs 30-50 years. They let an engineer confirm the shell, coating, and joint system before panels are ordered.
| Design parameter | Typical value or range | Why it matters |
|---|---|---|
| Capacity range | 20-60,000 m3 | Single-tank throughput |
| Shell plate | 6-40 mm | Hydrostatic head |
| Coating DFT | 0.25-0.45 mm | Verified before shipment |
| Surface prep | Sa 2.5 blast | Coating adhesion |
| Holiday test | 1500 V | Every square meter |
| Bolt grade | 8.8 | Joint integrity |
| Design life | 30-50 years | With inspection |
| Operating temperature | 4-60 °C | Product and climate |
| Code basis | AWWA D103-09 / ISO 28765 | Design authority |
| Limitation to check | Product corrosivity | Confirm coating grade |
Against welded steel, concrete, and fiberglass, a bolted steel tank wins on erection speed and coating control for the 20-60,000 m3 range. Use the table to match the material to product corrosivity, site logistics, and required life.
| Criterion | GFS bolted tank | Welded steel tank | Concrete tank | FRP tank |
|---|---|---|---|---|
| Corrosion defense | Vitreous enamel, inert | Coating-dependent | Good but porous | Liner-dependent |
| Construction | Bolted, fast on site | Welded, slower | Cast in place | Molded / shop |
| Capacity ceiling | Up to 60,000 m3 | Up to 150,000 m3 | Very large | Limited (<5,000 m3) |
| Design life | 30-50 years | 30-50 years | 40-60 years | 20-30 years |
| Best fit | Corrosive, modular | Very large, generic | Heavy civil works | Small, neat chemical |
Require the ISO 28765 calculation, the 1500 V holiday test, and a coating log; confirm the coating grade matches the chemistry. Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) issues drawings, NDE records, and inspection packages per tank so the bolted build survives financing and regulatory review.
A bolted steel tank trades a little single-tank volume for far better coating control and erection speed. Specify the code math, the test proof, and the coating grade, and the bolted asset performs for 30-50 years.
A vessel assembled on site from factory-coated steel panels joined with 8.8-grade bolts, avoiding field welding, in capacities from 20 to 60,000 m3.
Bolting wins on coating control and speed; welding wins on very large volumes above 60,000 m3. Quality is set by the coating-to-chemistry match.
The shell is designed to AWWA D103-09 and ISO 28765, with plant control under ISO 9001 and ISO 45001.
Plates are blasted to Sa 2.5, coated to 0.25-0.45 mm DFT, and holiday-tested at 1500 V per square meter.
Glass-Fused-to-Steel enamel, Fusion Bonded Epoxy, and galvanized zinc, each matched to the stored product.
Yes. Capacity, coating grade, roof, and fittings are engineered per duty, with drawings issued per tank.