| Place of Origin: | China | 
| Brand Name: | CEC TANKS | 
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI | 
| Model Number: | W20160127007 | 
| Minimum Order Quantity: | 1set | 
| Price: | $5000~$20000 one set | 
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box | 
| Delivery Time: | 0-60 days after deposit received | 
| Payment Terms: | L/C, T/T | 
| Supply Ability: | 60 sets per month | 
| Detail Information | |||
Above Ground With High Acid And Alkali Resistance Glass Lined Liquid Storage Tank
How is the production process of GFS tank ?
1. Get raw steel sheet : First measure the thickness with micrometer and see whether it matches the raw steel sheet to be used . Then mark down the batch number .
2. Punching , corner cut and edging : Before punching set all the dates as per drawing in the computer and then put steel sheet on the automatic laser cutting machine , which will cutting the holes according to the setting datas .
3. Press Arc :According to the diameter , determine the radian of the pressure plate ; clean up the pressure machine and the plate surface ; be careful do not press the steel emery onto the plate .
4. Short blasting : Before the blasting , shifting the steel emery ( steel grit) and add it to the blasting machine ; hoist the rough steel into the blasting machine.
5. Glaze Mortar Adjustment : Firstly , the ground coat glaze mortar must be shifted . Secondly , adjust the glaze mortar according to the specification .
6. Spray : Before the spray , check the plate is clean and no defects , use sandpaper to clean the surface well and then put them into the automatic spray machine , start spraying .
7. Buring : After finish spray put the steel sheet to the high temperature oven , the burning temperature between ground enamel and top enamel are different . The temperature of ground enamel is 880-900 degree and the buring time is about 8-20 minutes , while the top ground the temperature is 780-820 degree and the burning time is about 6-16 minutes .
9. Production QC : chemical elements inspection ; holiday test ; Coating thickness gauge ; Out appearance checking ; Anti-acid&alkaline test ; Anti-high temperature test ; Adhesion test ; Adhesion test
10. Package : Double checking is required before packaging, confirm the plate’s code and quality . The steel plates is separated with each other by PE foam , to avoid any damage on the coating surface . And the whole pallet steels are covered by a outer film, tied by steel belt .
Advatanges of GFS tank
| 1. superior performance in corrosion resistance and against rust | 
| 2. factory fabrication tank . No painting or spray on erection site | 
| 3. minimal maintenance cost | 
| 4. No need crane or other large equipment during erection. | 
| 5. not subjected to severe weather and environment | 
| 6. can be designed to future expansion, dismantle or re-movement. | 
Comparation of various tanks
| No | Item | Cement tank | Carbon steel tank | Enamel tank | 
| 1 | Construction time | >90 day | > 60 days | <15 days | 
| 2 | Process technology demand | strict | Welding difficult | easy | 
| 3 | Installation technology demand | Strict & complicated | difficult | Convenient & easy | 
| 4 | Removal | impossible | difficult | easy | 
| 5 | Appearance | normal | normal | good |