| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Hardness: | 6.0Mohs | Size Of Panel: | 2.4M * 1.2M |
| Feature: | Eco-friendly, Durability | Capactiy: | 20 M3 To 20,000 M3 |
| Warranty Period: | 2 Years Free Of Charge | Installation: | By Jacking Machine Or Steel Pole, Fast In Installation |
| Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion | Highlight: | Chilled Water Storage Tank UK,Stratified Chilled Water Tank,Peak Shaving Water Tank |
A chilled-water storage tank in the UK is a stratified vessel that stores cold made off-peak and releases it during peak cooling hours, letting a plant cut peak electricity demand and defer chiller capacity. Time-of-use tariffs and heat-network growth make peak shaving relevant to UK commercial and district-cooling operators, and the specification follows Building Regulations, BS EN standards and CIBSE guidance. Center Enamel supplies Glass-Fused-to-Steel, Fusion-Bonded Epoxy and stainless bolted tanks engineered for chilled-water duty, with more than 30,000 installed tank projects across 100-plus countries. This article sets out the duty-led baseline a UK chilled-water project should work from.
A stratified chilled-water tank holds cold water at the bottom and warmer return water at the top. Charging runs chillers at low-cost or low-carbon hours; discharging serves the building or process load at the peak without starting extra machines. The economic case is the avoided peak chiller capacity and demand charge, so the tank is sized from the peak-hour cooling deficit and the hours to cover, not from a generic factor.
For a chilled-water storage tank in the UK the framework is the Building Regulations and the relevant BS EN standards, with CIBSE guidance informing stratification, controls and commissioning. A closed chilled loop normally needs a process-contact specification, but the makeup connection must be backflow-protected and meet Water Supply (Water Fittings) Regulations where it ties to the public supply. Agree structural loading, fire separation and the energy-metering point with the authority having jurisdiction before ordering.
A thermal store, chilled-water buffer, data-center water reservoir or fire reserve sits idle or cycles slowly for most of its life, so the internal finish and the shell discipline matter more than the nameplate rating. Glass-Fused-to-Steel panels are fired at 820-930 degrees C to give a smooth inert skin at 0.25-0.45 mm thickness, adhesion above 3,450 N/cm2 and 100 percent 1,500 V DC spark testing per panel. Fusion-Bonded Epoxy bolted tanks (Resicoat R4-ES interior 180-280 micrometres, Interpon D2015 exterior 150-250 micrometres, adhesion above 16 MPa) and hot-dip galvanized bolted tanks cover specified or cost-sensitive duties. Stainless 304 or 316 is chosen where the fluid is low-mineral or a factory-fabricated vessel is preferred. The caveat is that lining choice follows fluid chemistry and code duty, so the specifier should confirm pH, chloride load and pressure class rather than assume one construction fits every duty.
Sizing starts from the real duty calculation - thermal charge/discharge profile, chilled-water temperature swing, makeup and process balance, or fire hydraulic demand - not from a catalogue number. The coating thickness of 0.25-0.45 mm for GFS or 180-280 micrometres for FBE, a 30-50 year tank lifecycle, the NSF/ANSI 61 or WRAS potable-contact option where relevant, and the local freeze or seismic margin then set the shell, roof and appurtenances. Every figure below is checked against the applicable standard and the authority having jurisdiction in the destination country.
Design parameter |
Typical value or range |
Why it matters |
Peak cooling deficit |
Site-specific kW or MW |
Sets discharge duty |
Peak hours covered |
Hours per day |
Derives stored volume |
Supply/return temperature |
Chilled-water delta-T |
Defines usable cold |
Thermocline target |
Sharp interface |
Preserves usable volume |
Coating thickness |
0.25-0.45 mm enamel / 180-280 um FBE |
Idle-surface integrity |
Adhesion |
above 3,450 N/cm2 (GFS) |
Lining integrity on cycling |
Spark test |
1,500 V DC per panel |
Holiday verification |
Design lifecycle |
30-50 years |
Daily charge/discharge duty |
The figure below is a REAL Center Enamel delivery cited here as manufacturing-capability evidence for the tank type discussed, NOT as a claimed thermal-energy-storage, chilled-water, data-center water or fire-water delivery in the named country. Center Enamel's verified project record (case_library.csv) holds no dedicated TES, chilled-water, data-center-water or Netherlands/Spain/France/UK/Belgium fire-water tank project for this specific duty; where a real in-country tank exists it is cited as the closest analogue, never as the named application. This reference demonstrates the ability to engineer large coated, stainless and bolted water tanks for demanding duty, not a claim about this specific application or geography. Where the source did not record a diameter or height, the field reads Not Provided and is never estimated.
Project |
Country |
Tank type |
Volume |
Year |
Relevance |
Russia industrial-water stainless tanks |
Russia |
Stainless steel tank (SUS304/316L) |
2 tanks, 519 m3 total |
2024 |
Real stainless industrial-water tanks (capability analogue, not a UK chilled store) |
Require a duty schedule with the peak-hour cooling deficit, hours to cover and supply/return temperatures, then ask the supplier to show the volume and diffuser design that deliver it. Reject a bid quoting a volume with no thermocline or inlet detail, because poor mixing can sharply cut usable cold. Keep lining evidence and the BS EN, CIBSE and water-fittings documentation ready for review and define the metering approach if the store supports an efficiency claim.
A stratified tank that stores cold made off-peak and releases it during peak cooling hours, cutting peak electricity demand and deferring chiller capacity.
From the peak-hour cooling deficit and the hours to cover, checked against the supply/return temperature band - not from a generic factor.
A sharp thermocline keeps cold separate from returning warm water, preserving usable stored cold; poor mixing cuts effective capacity.
A closed chilled loop usually needs a process-contact specification, though the makeup connection must be backflow-protected and meet water-fittings rules.
The Building Regulations and relevant BS EN standards, with CIBSE guidance on stratification, controls and commissioning.
GFS enamel for inert idle water, FBE for a specified duty, or stainless where the fluid is low-mineral and a fabricated vessel is preferred.
Thickness (0.25-0.45 mm for GFS or 180-280 micrometres for FBE), adhesion above 3,450 N/cm2 for GFS and 100 percent 1,500 V DC spark testing per panel.
Yes - stratified cold stores are common in UK heat-network and district-cooling schemes to shift chiller operation to lower-cost hours.
About 30 days ex-works for a 1,000-10,000 m3 vessel, with on-site bolted erection in weeks.
A 30-50 year shell lifecycle is expected, with the lining and diffusers driving maintenance under daily cycling.
Yes - the lining should be warranted separately because daily thermal cycling stresses it more than the shell.
A verified single shell of 20,000 m3 was delivered in 2016, setting the upper bound for one bolted tank.
No - it is a real stainless industrial-water tank cited as a capability analogue, not a claimed UK chilled-water delivery.
Yes - GFS, FBE and stainless bolted tanks sized from the real peak-shaving duty with documentable lining and construction records.
Because the tank covers the few peak hours from stored cold, avoiding the purchase of chillers that would run briefly at low utilisation.
A chilled-water storage tank in the UK is sized from the peak-hour cooling deficit and hours covered, with usable cold set by stratification rather than nameplate volume. Require a CIBSE-aligned diffuser and thermocline strategy, documentable lining and an authority-ready compliance file.
Suggested CTA: State peak deficit, covered hours and supply/return temperatures, and require a stratification strategy before ordering a UK chilled-water tank.