| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
A biogas tank manufacturer for an anaerobic plant supplies the containment chain, not a single vessel. A complete biogas system usually needs a digester that holds the reacting slurry at 35-38 C, a gasholder that buffers biogas at 5-30 mbar, and a digestate tank sized to the fertiliser season plus regulation. Treating these as one product family is what lets a manufacturer deliver a coherent, leak-tight system instead of three mismatched tanks. Center Enamel manufactures the GFS, FBE, stainless-steel and carbon-steel bolted tanks that make up that chain.
The Three Tanks A Biogas Plant Actually NeedsThe digester is the reactor where microbes produce methane. The gasholder decouples gas production from gas use, letting the combined-heat-and-power unit or upgrading train draw steady flow while the digester keeps running. The digestate tank stores the nutrient-rich outflow, sized to spreading windows and local rules rather than daily volume. A manufacturer that understands all three specs the coatings and roofs consistently across the chain.
Each tank sees a different hostile environment. The digester liquid zone meets organic acid; its gas zone meets H2S and condensation; the gasholder lives in near-pure biogas with moisture; the digestate tank meets an ammoniacal, sometimes high-pH liquor. A biogas tank manufacturer should specify GFS 2C2F or FBE per zone rather than one coating for the whole plant, because the failure point is almost always the seal, gasket or metal at a coating boundary.
Assess a biogas tank manufacturer on the whole containment chain with these numbers: digester retention of 20-40 days at 35-38 C, gasholder pressure of 5-30 mbar, methane content of 55-65%, and per-zone coating - GFS 2C2F at 0.25-0.45 mm or FBE - verified by a 1,500 V holiday-spark test and a shell calculation to AWWA D103-19 and ISO 28765. They decide whether the supplier delivers one coherent leak-tight system, not a lone digester.
Design parameter |
Typical value or range |
Why it matters |
Digester retention |
20-40 days at 35-38 C |
Sets digester volume |
Biogas pressure |
5-30 mbar gasholder |
Roof class for the holder |
Methane content |
55-65% of biogas |
Drives CHP or upgrading size |
Digestate storage |
Season plus regulation |
Distinct from digester volume |
Coating by zone |
GFS 2C2F or FBE |
Weak point is the coating boundary |
Limitation to check |
Usable gas volume is below low-pressure setpoint |
Size holder to recoverable volume |
A 2021 biogas engineering project in France used a single Glass-Fused-to-Steel bolted tank of 2,215 m3. As a European biogas tank delivery it demonstrates a manufacturer supplying a GFS bolted vessel for biogas duty with documented coating and structural certification. Diameter and height are not recorded in the verified project data and are reported Not Provided.
Field |
Value |
Location |
France, Europe |
Year |
2021 |
Tank type |
GFS bolted, 1 unit |
Volume |
2,215 m3 |
Application |
Biogas engineering |
A biogas plant is a chain, and splitting the digester, gasholder and digestate tank across three suppliers invites three different coating logics and three interface gaps. A single manufacturer who specifies the coating per zone across the whole chain keeps the gas-zone boundary consistent and the nozzles aligned with the mixer and biogas train. The saving from splitting suppliers is usually eaten by the site coordination and the coating mismatch that appears at commissioning. One manufacturer with one calculation basis is the lower-risk route for a gas-tight system.
Center Enamel manufactures the full biogas containment chain in GFS, FBE, stainless-steel and carbon-steel bolted construction. The company has produced bolted tanks since 2008, operates a base designed for 250,000 panels per year, and holds ISO 9001, ISO 45001, NSF/ANSI 61, EN 1090 (CE), ISO 28765 and WRAS approvals, with more than 30,000 projects delivered across 100+ countries.
Typically three: a digester holding the reacting slurry at 35-38 C, a gasholder buffering biogas at 5-30 mbar, and a digestate tank sized to the fertiliser season plus regulation. Treating them as one chain avoids mismatched coatings and roofs.
Why does a biogas tank manufacturer specify coatings per zone?Because each tank sees a different hostile environment - organic acid in the digester liquid, H2S in the gas zone, wet biogas in the holder, ammoniacal liquor in the digestate. The failure point is usually the coating boundary, so per-zone specification matters.
What pressure is a biogas gasholder designed for?A flexible-membrane gasholder typically operates at 5-30 mbar. That low pressure class, with flame arrester, water seal or relief, and hazardous-area classification, is what defines the roof and safety basis.
How is digestate storage sized?To the spreading season plus local regulation, not to daily output. Digestate accumulates and is stored then land-applied, so the tank is often larger than intuition suggests and is a separate scope from the digester.
Which standards apply to biogas tanks?Bolted tanks to AWWA D103-19 and ISO 28765; coatings to NSF/ANSI 61 or WRAS where potable contact applies; structural marking to EN 1090 (CE) for Europe. ASME VIII applies where a pressure vessel class is specified.
Does Center Enamel manufacture biogas tanks?Yes. Center Enamel supplies GFS, FBE, stainless-steel and carbon-steel bolted tanks across the biogas chain - digester, gasholder and digestate - with documented coating and structural certification.
What methane content should I expect from the digester?Biogas from anaerobic digestion is typically 55-65% methane, with the balance mostly CO2 and trace H2S. That methane fraction drives the size of the combined-heat-and-power or upgrading train.
How large was a delivered European biogas tank?A 2021 biogas engineering project in France used a single GFS bolted tank of 2,215 m3; a 2024 Sweden project used a single GFS digester of 5,504 m3, both demonstrating verified European biogas tank deliveries.
What is the most common biogas tank sizing error?Sizing the gasholder to the full geometric tank volume. Usable gas volume is only what sits above the low-pressure setpoint, so the holder must be sized to recoverable volume with the venting and detection basis confirmed.
ConclusionA biogas tank manufacturer supplies the containment chain - digester, gasholder and digestate storage - not one vessel, and the coating must follow the zone because the digester sees organic acid, the gas zone sees H2S, and the digestate sees ammoniacal liquor. Size the gasholder to recoverable volume and the digestate tank to season plus regulation. Center Enamel manufactures the full GFS, FBE, stainless-steel and carbon-steel bolted chain, proven on European biogas duty such as a 2,215 m3 GFS tank in France in 2021.
Suggested CTA: Send Center Enamel your plant mass balance and gas-use profile, and request a three-tank biogas containment chain with per-zone coating specification.