Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Body Color: | Dark Green / Can Be Customized | Corrosion Integrity: | Excellent |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Chemical Resistance: | Excellent |
| Size Of Panel: | 2.4M * 1.2M | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Highlight: | Glass-lined steel tanks for data centers,Enamel-coated bolted steel tanks,Glass fused to steel tanks with seals |
||
"Glass-lined" and "GFS" describe the same bolted-tank family: steel panels with a fired enamel (glass) face, assembled on site with bolts and sealant. The engineering question for a data center is not the coating - that was covered elsewhere - but the build method, because the build method decides how fast the tank comes online and how leak-tight it stays.
A glass-lined bolted steel tank is erected from factory-coated panels joined by 8.8-grade bolts and a butyl sealant, so there is no field welding of the coated surface. That makes it faster and lower-risk on a data center critical path than a field-welded tank, and lets crews complete a tank in days rather than weeks. The sealant and bolt torque, not the weld, are what keep it leak-tight.
Each panel arrives pre-coated on both faces. Crews stack them into a shell, fasten with 8.8-grade bolts through the sealant joint, and fit the roof and accessories. Because the steel is never welded after coating, the glass face is never reheated or stressed by weld heat near the seal.
Leak tightness comes from a continuous butyl sealant bead compressed by the bolted joint, not from a weld. Correct bolt torque and a clean, dry joint are what prevent weeping. The supplier should specify torque and joint prep; the crew follows it.
| Build element | Specification | Failure mode if ignored |
|---|---|---|
| Bolts | 8.8-grade | Joint loosening. |
| Sealant | Butyl bead, continuous | Seam weeping. |
| Torque | Specified, checked | Uneven compression. |
| Joint prep | Clean, dry | Seal breach. |
Field-welded tanks need qualified welders, radiographic testing and weather windows, all of which threaten a data center schedule. Bolted panels ship flat, need no on-site coating, and erect with a small crew and a crane. The Thailand installation completed with a six-person crew in twelve days, illustrating the speed.
The same panel system scales from a small fire tank to the 21,088 m3 Indonesia Cilincing potable tank (2024). Multi-tank programs simply repeat the erection sequence in phase with foundations, which is easier to plan than custom-welded geometry.
Center Enamel manufactures the coated panels and supplies the bolt, sealant and torque specification with erection supervision, so the glass-lined bolted tank arrives as a governed build, not a site experiment.
In this tank family yes - both mean steel panels with a fired enamel (glass) face, assembled bolted.
Not if built to spec: a continuous butyl sealant compressed by 8.8-grade bolts and correct torque keeps the joint leak-tight.
Typically much faster - no field welding, no radiography, no on-site coating; a small crew and crane can finish in days.
8.8-grade bolts are the standard for the shell; the sealant and washer system matter equally for tightness.
Yes, up to 20,000 m3-plus in one shell, as with the 21,088 m3 Indonesia Cilincing tank.
The tank supplier specifies it; the erection crew follows it under supervision.
The glass-lined bolted tank wins on a data center schedule because it removes field welding, radiography and on-site coating from the critical path. Build it on 8.8-grade bolts, a continuous sealant and correct torque, and the result is a fast, leak-tight, repeatable asset across the campus.
Suggested CTA: Send us your tank count and volumes and we will return a phased erection plan with bolt, sealant and torque specification plus supervision.