| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | J2016012316 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | J2016012316 |
| Acid And Alkalinity Proof: | Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 | Elastic: | Same As Steel Sheet , Around 500KN/mm |
| Serive Life: | More Than 30 Years | PH Range: | PH 1 - PH 14 |
| Coating Color: | Dark Blue, Dark Green , White, And Customized | Steel Plates Thickness: | 3mm - 12mm , Depends On The Diameter & Height |
| Easy Yo Clean: | Smooth, Glossy, Inert, Anti-adhesion | Coating Thickness: | 4.0.25mm - 0.4mm, Two Coating Internal And External |
| Highlight: | GFS fire water tanks NFPA 22 compliance,Glass fused steel tanks data centers,Fire water tanks sizing data centers |
||
A data center fire-water tank is a life-safety asset. It must hold the reserve demanded by the fire-protection design, stay available through standby, and pass inspection on day one and year fifteen. Glass-Fused-to-Steel (GFS) bolted tanks are a natural fit, but only if the sizing and the standard basis are handled correctly.
A GFS fire-water tank for a data center should be designed and erected to NFPA 22 for the storage and AWWA D103-09 for the bolted steel structure, with capacity set by the required fire duration and pump demand, a clean gravity or suction arrangement, freeze protection where needed, and seismic bracing per the site. The fired glass shell stays corrosion-free through long standby, which is exactly what a fire reserve needs.
NFPA 22 sets the rules for private fire-service water storage - capacity, overflow, access and protection - while AWWA D103-09 governs the bolted steel tank structure. The GFS enamel face is covered by ISO 28765. Together they give an inspector a clear, code-based acceptance path.
| Standard | Governs | Why it matters |
|---|---|---|
| NFPA 22 | Fire water storage | Inspector acceptance. |
| AWWA D103-09 | Bolted steel structure | Shell safety. |
| ISO 28765 | GFS enamel design | Lining integrity. |
Capacity comes from the fire-protection design: the required duration (commonly two to four hours for data centers) multiplied by the system demand, plus any hose/standpipe allowance, minus incoming water if credited. The tank supplies this through an NFPA 20 pump. Set the outlet depth and elevation to the pump suction needs.
Fire water sits unused for long periods, which is where painted steel rusts and galvanized steel eventually consumes its zinc. The GFS fired glass face does neither - it stays inert through standby, so the tank passes inspection years later without a recoat program. The Indonesia fire-water tower at 34.8 m (2018, the tallest GFS tank by an Asian manufacturer) is a delivered fire-duty example.
Cold sites need freeze protection (insulation or heat trace at the wetted components); seismic sites need braced anchorage to the foundation load. The bolted GFS shell is engineered to the local wind and seismic load, and the Ecuador installation that survived a 7.8 earthquake in 2016 shows the structural resilience available.
GFS and related bolted fire-water tanks have been delivered across climates: UAE Dubai 652 m3 (2025), USA Porsche speedway fire-water tanks (2016), Guyana 162 m3 (2025), Guatemala 598 m3 (2024), and Niger CNNC fire-water tanks (2009). These are real fire-duty references that demonstrate the tank type in service.
Center Enamel designs bolted tanks to AWWA D103-09 with ISO 28765 enamel, supplies fire-water tanks across climates with the load and freeze/seismic basis documented, and provides the coating test record for inspection.
NFPA 22 for the fire water storage and AWWA D103-09 for the bolted structure, with ISO 28765 for the GFS enamel face.
Reserve = required duration times system demand plus allowances, minus any credited incoming water, then match the outlet to the NFPA 20 pump suction.
It stays corrosion-free through long standby, so the tank remains code-ready for years without a recoat program.
Insulate or heat-trace the wetted components; the tank itself is inert, but the appurtenances need protection in cold climates.
It is engineered to the local wind and seismic load with braced anchorage to the foundation plan, as demonstrated by the Ecuador 2016 earthquake-survivor installation.
Yes - UAE Dubai 652 m3 (2025), USA Porsche speedway (2016), Guyana 162 m3 (2025), Guatemala 598 m3 (2024) and Niger CNNC (2009) are delivered fire-duty references.
A GFS fire-water tank earns its place in a data center by pairing NFPA 22 / AWWA D103-09 compliance with a shell that stays corrosion-free through years of standby. Size it to the fire duration and pump demand, protect it for the climate, and it will pass inspection on day one and a decade later.
Suggested CTA: Send us your fire-protection demand, duration and site loads and we will size a GFS fire-water tank with the NFPA 22 / AWWA D103-09 basis and freeze/seismic detailing.