| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20161227006 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
Owners planning tank covers across water, wastewater, and bulk storage face the same pressure: get a dome that is designed, built, and installed by one accountable party, not a cover that arrives as loose parts with no owner. A fragmented supply chain turns a simple roof into a coordination project.
Engineered by Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel), a comprehensive aluminum geodesic dome roof program covers design, fabrication, and installation as one scope, so the 10-120 m span cover is verified to ASCE 7 and delivered ready to bolt onto the tank.
A comprehensive dome program starts with a site climate and tank survey, then produces load calculations, geometry, and connection details under one accountable scope. Snow of 0.5-3.0 kPa and wind up to 200 km/h are verified to ASCE 7, and the dome reaction is checked against the tank roof ring, because a cover designed in isolation often fails at the interface. One scope means one party answers when the numbers do not line up.
The aluminum struts, nodes, and panels are cut, drilled, and kitted in the shop, then bolted on site with minimal welding and no field coating. A 10-120 m dome can be erected quickly because every part is pre-engineered and labeled, and the coating-free 6061-T6 aluminum needs no paint cure before the tank is sealed. Installation is supervised so the as-built dome matches the calculated geometry.
At handover the operator receives drawings, load reports, a warranty, and inspection checklists, so the 40-60 year asset is supported from day one. Because the dome is bolted aluminum, a later panel swap is a small, planned job rather than an emergency, and near-zero maintenance keeps the lifecycle cost low. Comprehensive delivery is what turns a roof purchase into a managed, warrantied asset.
| Design parameter | Typical value or range | Why it matters |
|---|---|---|
| Span | 10-120 m | Self-supporting coverage |
| Aluminum alloy | 6061-T6 | Corrosion-resistant structure |
| Snow load | 0.5-3.0 kPa | Site climate |
| Wind load | up to 200 km/h | Cyclone-rated option |
| Dead load | 15-40 kg/m2 | Roof self-weight |
| Panel thickness | 3-8 mm | Local stress |
| Service life | 40-60 years | Design target |
| Maintenance | near-zero | No repaint cycle |
| Seam seal | Gasketed | Weathertight |
| Limitation to check | tank shell must suit dome load | Watch this in the spec |
| Wind / seismic load | 0.5-1.5 kPa | Roof and shell load |
| Foundation settle | 0.1-0.3 m | Controlled subgrade |
| Throughput | 50-500 m3/d | Typical draw |
| Operating temp | 20-60 °C | Product and climate |
| Product density | 800-950 kg/m3 | Typical range |
| Design margin | 10-20 % | Allowance in steel |
| Criterion | Aluminum geodesic dome | Steel fixed cone roof | Open top + cover |
|---|---|---|---|
| Span / columns | Self-supporting 10-120 m | Needs internal columns | Limited span |
| Weatherproofing | Sealed aluminum panels | Welded steel, coating | Fabric, UV-limited |
| Maintenance | Near-zero, no paint | Repaint cycle | Frequent |
| Emission control | Closed, low VOC | Closed | Open |
| Service life | 40-60 years | 30-50 years | 5-15 years |
Every structure delivered by Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) is engineered against EN 1090 and AWWA D103-09 with finite element verification of shell, roof and nozzle loads, fabricated under ISO 9001 and ISO 45001 control, inspected across one hundred percent of critical joints, and assembled with Grade 8.8 bolts and manufacturer-certified sealant.
A comprehensive aluminum dome is delivered as one accountable scope: designed, fabricated, and installed so the 10-120 m cover bolts true to its calculation.
One accountable scope covering site survey, ASCE 7 design, shop fabrication, and supervised installation of a 10-120 m dome.
Snow 0.5-3.0 kPa and wind up to 200 km/h are verified to ASCE 7, then aluminum struts and nodes are cut, drilled, and kitted in the shop.
Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) supervises bolt-up so the as-built dome matches the calculation, with no field coating.
Drawings, load reports, a warranty, and inspection checklists, so the 40-60 year asset is supported from day one.