| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W201691123005 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W201691123005 |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Corrosion Integrity: | Excellent |
| Chemical Resistance: | Excellent | Capacity: | 20 M3 To 18,000 M3 |
| Service Life: | ≥30 Years | Permeability: | Gas / Liquid Impermeable |
| Highlight: | FBE biogas preliminary tanks,Fusion bonded epoxy biogas tanks,Biogas efficiency optimization tanks |
||
In the anaerobic digestion (AD) process, the preliminary tank (or primary mixing/pre-treatment tank) is a high-stress environment. It is here that organic waste—ranging from food scraps to animal manure—is homogenized, heated, and prepared for digestion. This stage involves volatile organic acids (VOAs) and significant mechanical scouring. Fusion Bonded Epoxy (FBE) tanks have emerged as the industry's most cost-effective, high-performance solution for preliminary stages, offering the structural integrity of bolted steel with a high-durability polymer barrier.
Center Enamel’s FBE technology is a factory-controlled process where high-performance epoxy powder is electrostatically applied to a grit-blasted steel substrate and heat-cured to form a covalent bond.
Below are the performance benchmarks for Center Enamel FBE Biogas Preliminary Tanks:
| Feature | Performance Specification |
| Individual Tank Capacity | Up to 60,000 m3 + |
| Surface Preparation | Grit-blasting to SA 2.5 / SSPC-SP10 |
| Adhesion Strength | ge 12 MPa (Pull-off test) |
| Standard Compliance | AWWA D103-09, ISO 9001, ISO 28765 |
| Service Life | 20 – 30 Years |
| Mixing Compatibility | Supports side, top, and submersible agitators |
3. Strategic Advantages for AD Plant Operators
Modern industrial biogas plants require massive pre-treatment volumes to ensure consistent feedstock flow. Center Enamel supports individual tank builds up to 60,000 m3, allowing operators to:
Biogas plants are methane-rich, high-risk environments where safety is paramount.
Preliminary tanks often require heating to kickstart biological processes. Our FBE tanks integrate seamlessly with:
Our expertise in waste management is reflected in projects across 100+ countries. While our premium GFS technology was used for the Beijing Daxing Stability Circular Economy Park (Phi16.82 times 23.4m), our FBE line leverages the same world-class structural engineering (Finite Element Analysis) to provide a balanced "performance-to-cost" ratio for municipal and industrial biogas projects worldwide.
How does FBE handle the "Acid Phase" better than concrete?
Concrete is porous and prone to micro-cracking, which allows organic acids to penetrate and weaken the internal rebar. FBE is an impermeable polymer barrier, factory-tested at 1500V to ensure no leaks, protecting the structural integrity of the tank for decades.
Can FBE tanks handle high-grit waste?
Yes. The SA 2.5 grit-blasting and thermal fusion process ensure the coating has superior adhesion and hardness, making it highly resistant to the abrasive wear associated with high-solids feedstock.
Is the tank expandable?
Yes. One of the core benefits of the Center Enamel bolted system is scalability. If your plant's throughput increases, additional rings can often be added vertically to the existing structure to increase volume.
With over 30 years of experience and nearly 200 patents, Center Enamel is Asia's leader in bolted tank technology. Our FBE biogas preliminary tanks are operational worldwide, helping the renewable energy sector achieve higher efficiency through durable and record-breaking engineering.
Optimize your biogas feedstock strategy with a 60,000 m3+ solution.