18000m3 CSTR Reactor Shipping from China Modular Delivery for Large-Scale Anaerobic Digestion

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W20160504020
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C,T/T
Supply Ability: 60 sets per month

Detail Information

Product Description

18000m3 CSTR Reactor Shipping from China Modular Delivery for Large-Scale Anaerobic Digestion

A continuous stirred tank reactor (CSTR) of 18,000 m³ is an industrial-scale biological engine: it holds hundreds of thousands of tonnes of substrate and digestate, keeps the biomass mixed and warm at 35-38°C mesophilic or 50-55°C thermophilic operation, and captures biogas under a sealed cover. For decades, a reactor of this size meant months of on-site welding, field coating, and concrete — and every one of those steps added schedule risk and quality uncertainty. Shipping a vessel this large was simply not an option.

Bolted construction changed that arithmetic. The 18,000 m³ CSTR reactor from Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) is manufactured as Glass-Fused-to-Steel (GFS) panels — fired at 820-930 degrees Celsius, 100% high-voltage holiday spark tested — and shipped from China as containerized flat-pack modules that bolt together on site with hand tools, no welding, and no field coating.

1. How Does an 18,000 m³ CSTR Ship from China in Containers?

The reactor is designed for shipping from the first drawing: the tank splits into standard container loads, and the process systems split with it.

  • Flat-pack panel system: GFS panels are factory-coated and crated in standard containers — the 18,000 m³ shell ships as a sequenced series of packs, not as welded steel volume.
  • Sequenced split delivery: shipments are scheduled to match the erection plan — foundations first, then shell panels, then the gas-tight cover, mixers, and accessories as the build advances.
  • Complete reactor scope: mixers, guide frames, gas holder or aluminum geodesic dome cover, manholes, flanges, and process piping ship in the same program, so the reactor is mechanically complete on arrival.
  • On-site bolt-up assembly: local crews assemble with torque wrenches and lifting gear — no welders, no coating crews, no heavy fabrication on site.
2. What Makes GFS the Right Surface for a Large CSTR?

At 18,000 m³ the surface must survive decades of biological attack — and fired glass is engineered for exactly that.

  • Biochemical resistance: the glass surface fused to steel resists the pH swings, organic acids, H2S vapor, and abrasion of active digestion — the attack modes that destroy field coatings inside digesters.
  • Temperature endurance: GFS handles sustained mesophilic (35-38°C) and thermophilic (50-55°C) operation without coating softening, blistering, or chemical migration into the digestate.
  • Sealed envelope for biogas: with gasketed bolted seams and a gas-tight cover, the reactor holds the biogas envelope — the revenue stream of the whole plant.
  • Long design life: 30-50 year service with minimal maintenance, verified by factory spark-test records on every panel before it ships.
3. Why Do Project Owners Prefer Modular Delivery for Large Reactors?

Modular delivery converts a high-risk field construction project into a factory-managed manufacturing program.

  • Schedule compression: bolted erection of a large digester typically takes weeks of field time versus months of welding and coating — a decisive advantage for project finance and feed-in deadlines.
  • Quality at the factory, not the field: coating, testing, and dimensional control happen under ISO 9001 in the factory — 100% holiday spark testing per panel — instead of depending on site weather and crews.
  • Weather independence: bolt-up assembly proceeds in rain, dust, or cold far better than welding and coating, widening the construction window.
  • Cost predictability: containerized flat-pack freight, standard lifting, and small crews make the landed and installed cost calculable before the contract is signed.
Evaluation CriterionBolted GFS CSTR (Center Enamel)Field-Welded Steel CSTRReinforced Concrete Digester
Corrosion & biochemical resistanceSuperior — fired glass, spark testedModerate — coating fails in digestateModerate — cracks, H2S attack
Shipping & logisticsHigh — flat-pack containers, sequencedN/A — built on siteN/A — built in place
Construction velocityFast — bolt-up in weeksVery slow — welding and coatingSlowest — forming, curing, sealing
Biogas tightnessHigh — gasketed seams + gas-tight coverModerate — weld defects riskModerate — joint leaks
Lifecycle & maintenanceMinimal — 30-50 year surfaceRecoating cyclesCrack and joint repairs
Quality evidenceFactory spark-test records per panelField inspection onlyConcrete test reports

Engineering Assurance

The 18,000 m³ CSTR reactor is FEA-verified for hydrostatic, wind, seismic, and mixing loads, manufactured under ISO 9001 to AWWA D103-09 and ISO 28765, and shipped with 100% holiday spark-test records and export documentation refined across 100+ countries.

People assume a reactor this size must be welded on site. Bolted GFS technology inverts that: the largest digester ships as flat-pack panels, and the factory does the quality-critical work — coating, testing, and dimensional control — before a single container leaves China.
Frequently Asked Questions (FAQ)
What is an 18,000 m³ CSTR reactor?

A continuous stirred tank reactor of 18,000 m³ capacity — about 4.75 million US gallons — for large-scale anaerobic digestion. It continuously mixes and heats organic substrate at 35-38°C (mesophilic) or 50-55°C (thermophilic) while capturing biogas under a gas-tight cover.

How can a reactor this large ship from China?

As Glass-Fused-to-Steel flat-pack panels in standard containers, sequenced to the erection plan. The 18,000 m³ shell, gas-tight cover, mixers, and accessories ship as coordinated batches and bolt together on site with hand tools.

How long does on-site assembly take?

Typically weeks for the bolted shell and systems — versus months of field welding, coating, and curing for welded steel or concrete digesters. Bolt-up assembly also proceeds in weather that would stop welding and coating crews.

Can the 18,000 m³ CSTR be customized?

Yes — operating temperature regime (mesophilic or thermophilic), mixing configuration, cover type (membrane or aluminum geodesic dome), and process accessories are engineered per substrate and site, with FEA verification and sequenced export delivery.

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2026 cectanks.com . All Rights Reserved.
Send Message