| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Body Color: | Dark Green / Can Be Customized | Corrosion Integrity: | Excellent |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Chemical Resistance: | Excellent |
| Size Of Panel: | 2.4M * 1.2M | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Highlight: | 10300m3 sludge storage tank,wastewater sludge storage tank,engineered sludge tank wastewater |
||
Wastewater treatment plants and industrial processors generate sludge continuously — and storing 10,300 m³ (about 2.72 million US gallons) of it demands a vessel that survives the most aggressive chemistry in the plant. Sludge is abrasive, sulfide-laden, oxygen-depleting, and temperature-variable; it attacks tank surfaces with hydrogen sulfide in the headspace and volatile fatty acids in the liquid phase. Concrete sludge tanks crack and corrode; field-coated welded steel loses its lining within years. A 10,300 m³ sludge storage tank is therefore an asset whose coating quality, structural design, and mixing interface decide its operating life.
Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) — the first Glass-Fused-to-Steel (GFS) tank manufacturer in China, with nearly 200 enameling patents and deliveries to more than 100 countries since 2008 — engineers large sludge storage tanks in GFS and fusion bonded epoxy (FBE) to AWWA D103-09, ISO 28765, and NSF/ANSI 61. Every panel is 100% high-voltage holiday spark tested under ISO 9001 control before shipment.
Sludge storage combines corrosion, abrasion, and odor duty in one vessel. Material selection starts from the chemistry, not from the price.
· Sulfide headspace attack: anaerobic conditions generate hydrogen sulfide that condenses on the shell and roof — the classic failure mode of coated steel sludge tanks. Fired glass (GFS) is chemically inert to H2S and cannot blister or peel.
· Abrasive liquid phase: sludge at 2-8% solids abrades softer linings; the fired glass surface is hard and wear-resistant, validated across decades of installations.
· Mixing and desludging forces: submersible mixers, recirculation nozzles, and desludging equipment impose local loads that FEA design resolves into reinforced panel and connection details.
· Odor control interfaces: covered storage with sealed vents and connections to odor control systems requires gas-tight engineered roof-to-shell sealing.
At this scale, quality is a documentation chain — structural calculations, coating records, and erection procedures that a plant auditor can follow panel by panel.
· FEA-verified structure: hydrostatic head, wind, seismic, and equipment loads are resolved per AWWA D103-09 with 8.8 grade bolted connections and anchorage design supplied with every project.
· Factory test records: each panel's coating thickness and 100% high-voltage holiday spark test are recorded under ISO 9001 — a paper trail inspectors and insurers recognize.
· GFS or FBE by duty: GFS for maximum chemical immunity and abrasion resistance; FBE where clients prefer an epoxy barrier — both factory-cured, both certified, both available up to 10,300 m³ and beyond.
· Commissioning-ready delivery: supervisor dispatch, torque procedures, and hydrotest documentation support plant acceptance and operator handover.
A 10,300 m³ sludge tank is a process vessel, not just storage: its interfaces with mixing, pumping, and gas handling must be engineered together.
· Mixer and nozzle integration: flanges and brackets at engineered positions accept submersible mixers, recirculation nozzles, and level instruments without field drilling or coating damage.
· Pumping and desludging: suction arrangements, anti-vortex details, and discharge piping interfaces are sized for plant hydraulics and desludging duty.
· Gas-tight covers: GFS or aluminum geodesic dome roofs contain odor, vent to treatment, and withstand the sulfide atmosphere — a single manufacturer for tank and cover removes interface risk.
· Expansion-ready geometry: diameter-to-height ratio is engineered for future solids loading, so the asset adapts as the plant grows.
|
Evaluation Criterion |
Center Enamel GFS/FBE Sludge Tank |
Cast-in-Place Concrete |
Field-Coated Welded Steel |
|
H2S and acid defense |
Superior — inert fired glass / factory FBE, 100% spark tested |
Poor — cracking, sulfide attack, leaching |
Moderate — headspace coating failure |
|
Abrasion resistance |
High — hard fired-glass surface |
Moderate — surface erosion over time |
Low — coating damage under abrasion |
|
Construction schedule (10,300 m³) |
Fast — bolted modular erection |
Very slow — multi-month cast works |
Slow — welding plus field lining |
|
Lifecycle and maintenance |
Minimal — 30-50 year design life |
High — repair and relining programs |
High — recoat every 5-10 years |
|
Quality documentation |
Full — FEA, spark-test records, ISO 9001 |
Site-dependent QA |
Field inspection only |
Every 10,300 m³ sludge storage tank ships with AWWA D103-09 structural calculations, ISO 28765 coating verification, 100% holiday spark-test records, and ISO 9001/45001 manufacturing certification — the file that passes plant audits, insurer review, and lender due diligence.
Sludge tanks fail from the inside out — H2S above the liquid line, abrasion below it. Only a surface that is inert and hard at the same time survives both, which is exactly what fired glass delivers.
A sludge storage tank holds thickened or digested sludge from wastewater treatment between process stages — buffering plant operations, equalizing feed to dewatering, or storing biosolids prior to disposal or reuse. Large units like 10,300 m³ serve municipal-scale plants.
Glass-Fused-to-Steel is chemically inert to hydrogen sulfide and volatile fatty acids, hard enough to resist sludge abrasion, and delivers a 30-50 year life without recoating. Concrete cracks and leaches; coated welded steel fails in the sulfide headspace.
Bolted GFS/FBE construction erects dramatically faster than concrete — from foundation readiness, a 10,300 m³ tank typically assembles in weeks with small crews, with no formwork, curing, or field coating.
Yes — diameter-to-height ratio, roof type (GFS or aluminum geodesic dome), mixer and nozzle interfaces, pumping arrangements, and accessories are engineered per plant, with FEA design for site wind and seismic conditions.
·