| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
A Glass-Fused-to-Steel (GFS) industrial water tank is a high-performance, modular containment system engineered to deliver flexible, scalable, and ultra-durable liquid storage across a massive capacity spectrum ranging from 20m³ to 60,000m³. Whether supplying a compact commercial facility or a sprawling municipal water treatment plant, infrastructure projects demand containment solutions that adapt seamlessly to varying volume requirements without sacrificing structural integrity or corrosion resistance. By fusing inorganic glass enamel to high-tensile structural steel at temperatures exceeding 800°C, Center Enamel delivers certified GFS tanks that combine unyielding tensile strength with a non-porous vitreous glass shield capable of withstanding decades of continuous industrial use.
Project developers, municipal engineers, and industrial plant managers encounter diverse containment sizing and site constraints:
Variable Volume Demands: Water storage needs fluctuate drastically—small commercial sites require compact 20m³ reserves, whereas municipal reservoirs and fire water grids demand massive 60,000m³ capacities.
Hydrostatic Pressure Management: As tank capacities scale upward toward tens of thousands of cubic meters, lower wall panels experience extreme outward hydrostatic pressures that require rigorous variable-thickness engineering.
Construction Logistics and Speed: Traditional cast-in-place concrete basins struggle to scale efficiently across different capacities without massive custom formwork and lengthy curing delays.
Center Enamel’s pre-engineered modular bolted panel architecture allows tanks to be precisely configured to any intermediate or large capacity between 20m³ and 60,000m³. Panels are standardized for rapid manufacturing yet custom-calculated for site-specific wind, seismic, and hydrostatic loads.
Inorganic glass enamel is thermally fused to both sides of structural steel plates. This creates an inseparable molecular bond that provides permanent resistance to rust, water scaling, and aggressive chemical exposure across the entire height and breadth of the tank wall, eliminating the need for periodic interior repainting.
Unlike monolithic concrete structures that require months of construction time, modular bolted GFS tanks are erected rapidly using lightweight scaffolding and standard bolting tools. This drastically shortens project commissioning schedules whether building a mid-scale 500m³ tank or a massive 50,000m³ reservoir.
| Performance Metric | Center Enamel GFS Modular Tanks (20m³–60,000m³) | Cast-in-Place Concrete Basin | Field-Welded Carbon Steel Tank |
| Capacity Flexibility | High (Precise modular scaling from 20m³ to 60,000m³) | Moderate (Fixed monolithic structure) | High (Custom-welded to various sizes) |
| Installation Speed | Fast (Prefabricated modular bolted kit) | Very Slow (Months of formwork and curing) | Slow (Extensive field welding and testing) |
| Coating Durability | Superior (Factory-fused glass enamel barrier) | Moderate (Vulnerable to surface carbonation) | Low (Requires continuous field recoating maintenance) |
| Design Lifespan | 30–50+ Years | 20–25 Years | 15–20 Years |
| Future Expansion | High (Modular panels allow capacity upgrades) | None (Fixed structure) | Low |
To satisfy municipal authorities, industrial plants, and international EPC contractors, all Center Enamel GFS tanks are manufactured in strict compliance with premier global engineering benchmarks:
AWWA D103: The definitive standard for bolted steel tank structural calculations.
ISO 28765: Dedicated to bolted steel tanks for liquid and sludge storage.
ISO 9001: Guaranteeing stringent factory quality management and precision manufacturing.
A: Center Enamel’s GFS water tanks are engineered for a versatile capacity range spanning from compact 20m³ units up to massive 60,000m³ municipal and industrial reservoirs.
A: Large-capacity tanks are meticulously engineered with variable steel panel thicknesses, high-tensile structural bolting, and robust perimeter ring beams designed to safely withstand extreme hydrostatic wall pressures and local seismic/wind loads.
A: Yes. Because all steel panels are prefabricated and quality-tested in our factory, on-site erection of a modular GFS tank takes a fraction of the time required to build a poured-in-place concrete basin, eliminating curing delays.
A: Yes. One of the primary advantages of modular bolted steel construction is the flexibility to modify configurations or increase tank height/diameter to scale up storage capacity as operational demands grow.
At Center Enamel, we combine advanced manufacturing capabilities with versatile engineering design to deliver robust, scalable, and high-performance water storage solutions tailored to any capacity requirement worldwide.
Are you planning a municipal water storage or industrial liquid containment project? Contact our engineering team today for a technical consultation, capacity sizing, and a customized proposal.