Wastewater Treatment Plants Glass Fused To Steel Water Tanks For Municipal Treatments And Organized Industrial Zone

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W20161021002
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W20161021002
Coating Thickness: 0.25mm~0.40mm & Double Coating Service Life: ≥30 Years
Capacity: 20 M3 To 18,000 M3 Tank Material: Glass Fused To Steel
High Light:

glass fused to steel water tanks

,

above ground fuel storage tanks

Product Description

Glass Fused to Steel tanks for Municipal Treatments and Organized Industrial Zone Wastewater Treatment Plants

 

 

In water and waste water treatment and biogas project, GFS tank has been widely used as various aerobic and anaerobic reactors of UASB,EGSB,SBR,BAF,USR,CSTR, and equalization tank,Clarifier, sludge holding tank, etc.

 

Design criterion & certificates: AWWA-D103, OSHA, NSF/ANSI-61 (by IAPMO), ISO9001, FDA

 

Eight Reasons to choose GFS tanks:

 

1. Short construction times

2. Tank volume can be expanded

3. Superior corrosion resistance

4. Easy to be shipped, relocated, dismantled

5. No need crane or other large equipment for erection

6. Beautiful appearance

7. Low project cost, more cost effective

8. Enameled surface is durable when exposed to the rigid environment

 

Projects reference

 

2008 Beijing Olympic Games Sewage Treatment--4 sets of Ø18.33×3.6M, 1 set of Ø4.82×3.6M

Malaysia Palm oil biogas plant--2 sets of Ø18.33×3.6M

Australia Melbourne Drinking Water Storage--2 sets Ø 22.17 x 6M

New Zealand Dairy Effluent Storage Tank-- 1 sets Ø 11.46 x 3.6M

Russia Municipal Wastewater Treatment---2 sets Ø 5.35 x 8.4 M

 

Wastewater Treatment Plants Glass Fused To Steel Water Tanks For Municipal Treatments And Organized Industrial Zone 0

 

Comparison of various tanks:

 

No Item Cement tank Carbon steel tank Enamel tank
1 Construction time >90 day > 60 days <15 days
2 Process technology demand strict Welding difficult easy
3 Installation technology demand Strict & complicated difficult Convenient & easy
4 removal impossible difficult easy
5 appearance normal normal Good

 

Wastewater Treatment Plants Glass Fused To Steel Water Tanks For Municipal Treatments And Organized Industrial Zone 1

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused Steel Tanks Supplier. Copyright © 2016-2024 cectanks.com . All Rights Reserved.
Send Message