Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | W20160901005 |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
Delivery Time: | 0-60 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
Place of Origin | China | Brand Name | CEC TANKS |
---|---|---|---|
Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W20160901005 |
Capacity: | 20 M3 To 18,000 M3 | Coating Thickness: | 0.25mm~0.40mm , Two Layer Of Coating Internal And External |
High Light: | water treatment tank,sewage treatment tank |
Waste Water Enamel Bolted Tank With Excellent Corrosion Resistance And Long Service Life
Glass fused steel tank specifications
Coating color | Dark blue, dark green , white, and customized |
A standard steel plate size | Effective size 2400mm x 1200 m |
Steel plates thickness | 3mm - 12mm , depends on the diameter & height |
Coating thickness | 0.25mm - 0.4mm, two coating internal and external |
Acid and alkalinity proof | Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 |
Adhesion | 3,450N/cm |
Elastic | Same as steel sheet , around 500KN/mm |
Hardness | 6.0 Mohs |
Service life | >30 years |
Spark test | >1500 V |
Permeability | Gas and liquid impermeable |
Easy yo clean | Smooth, glossy, inert, anti-adhesion |
Corrosion resistance | Excellent ! Suitable for waste water salt water, sea water, high sulfur crude oil, salt fox, organic and inorganic compounds |
Brief introduction of enamel bolted tank
Glass fused steel tank is a kind of factory fabrication tank made of glass coated on Ti-rich special steel plates. We use the enamel special ART310 steel sheet on our tank, which can greatly solve the fish scale problem and improve the adhesive power between enamel coating and steel sheet.
Hig recommended, we would cut holes on tank body in the workshop instead of on job site . And along with flange nozzles according to hole.
The installation of the glass fused to steel steel tank is easy, there is no need any big equipment during the installation. We usually install glass fused steel tank by jacks from top to down step by step . First, assembly the top ring, then lift them up by the jacks ; then assembly the next ring ....
Glass fused steel tank is widely used in water supply and waste water treatment, and it’s application areas are wide.
Optional roofs in waste water treatment project
Glass fused steel material roof
* gas - tight
* accommodate heavy loads from mixers and other equipment installed on roof
* gas and liquid impermeable
Aluminum sloped deck roof
* no gas - tight
* water treatment and waste water treatment
* economical
Glass reinforced polyester roof
* no gas - tight
* water treatment and waste water treatment
* economical
* dome shape roof
Single/double membrane roof
* tank mounted
* gas / liquid impermeable
* suits for low to moderate gas pressure
* center support pole is usually needed
Brief advantages of GFS tank
1. Short construction period for the installation of the GFS tanks
2. Superior corrosion resistance, service life is more than 30 years
3. Low project cost.
4. Tank volume can be easily expanded
5. Beautiful appearance, color can be customized
6. No need big installation equipment
7. Easily expand , dismantle, move, repair, clean
8. No subject to weather conditions