AWWA D103 Makeup Water Tank: What The D103-19 Standard Requires For Bolted Tanks

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W201691123005
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C,T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W201691123005
Steel Plates Thickness: 3mm To 12mm , Depends On The Tank Structure Corrosion Integrity: Excellent
Chemical Resistance: Excellent Capacity: 20 M3 To 18,000 M3
Service Life: ≥30 Years Permeability: Gas / Liquid Impermeable
Highlight:

AWWA D103 bolted water tank

,

fusion bonded epoxy tank coating

,

D103-19 makeup water tank

Product Description

AWWA D103 Makeup Water Tank: What The D103-19 Standard Requires For Bolted Tanks

AWWA D103-19 is the standard for factory-coated bolted carbon-steel tanks, and a makeup water buffer built to it is a documented, code-aware vessel rather than a panel stack held together by hope. The risk is a supplier that says 'AWWA compliant' without naming the edition or the clauses, or confuses D103 with the welded (D100), coating (D102), or roof (D108) standards. This article explains what D103-19 requires, how it differs from the related AWWA standards, and what a buyer should verify on a makeup tank.

Key Takeaway

An AWWA D103-19 makeup water tank is a factory-coated, bolted carbon-steel tank designed and tested to the standard's requirements for design, fabrication, coating, and hydrotest, with panel quality moved indoors where it is controlled. The coating is a glass-fused-to-steel or FBE system holiday-tested to 1500 V, assembled with 8.8-grade bolts and sealed gaskets, and the design pressure and foundation are documented. Center Enamel has no makeup or data-center project in this library; our real Namibia GFS drinking-water array (6 x 11,230 m3, 2022) is cited as proof of building large, code-aware bolted water tanks, not as a makeup or data-center delivery, and the application remains analogous and is not claimed. Note: AWWA has no D153 tank standard; D103-19 is the bolted-tank standard.

What D103-19 Covers

AWWA D103-19 governs factory-coated, bolted, carbon-steel tanks for water storage, covering the design, the shop-applied coating, the bolted assembly, and the testing. It is the anchor standard for a bolted makeup buffer, with ISO 28765 as the international companion for enamel-coated tanks.

D103-19 = bolted, factory-coated, carbon steel.

  • Bolted carbon steel.
  • Factory coating.
  • Design + test.
  • ISO 28765 companion.
Coating, Bolts And Gaskets

The defining quality step is the factory coating - glass-fused-to-steel fired at 820-930 C or fusion-bonded epoxy - with a 1500 V holiday-test pass recorded per batch, because the coating is what fails in the field if it is applied outdoors. The bolt is equally important: 8.8 grade as standard, with sealed washers and medium-rated gaskets sized for the stored medium and the temperature swing.

Coating indoors, bolts and gaskets specified.

  • GFS 820-930 C.
  • 1500 V holiday test.
  • 8.8-grade bolts.
  • Medium-rated gasket.
Design, Foundation And Hydrotest

D103-19 requires the design - shell, roof, foundation loads, and anchor Bolts - to be documented and the tank hydrostatically tested before handover. The foundation and the anchor design are part of the standard's scope, not an afterthought, because a bolted tank is only as sound as the ring it sits on.

Design, foundation, and hydrotest are in scope.

  • Documented shell.
  • Foundation + anchors.
  • Hydrostatic test.
  • Handover proof.
D103 vs D100, D102, D108

D103 is for bolted tanks; D100-21 is for welded steel tanks; D102-24 is the coating standard that applies regardless of construction; D108-19 is for aluminum and steel roofs. A supplier should name the right standard for the construction, and there is no AWWA 'D153' tank standard - if you see D153 cited, treat it as a typo for D103 or an internal project number.

Right standard per construction; no D153.

  • D103 bolted.
  • D100 welded.
  • D102 coating.
  • D108 roofs; no D153.
Honest Boundaries On Our References

We have no makeup-water or data-center project in this library. Our Namibia GFS drinking-water array (6 x 11,230 m3, 2022) is a real large bolted water-tank delivery cited as proof of building code-aware bolted tanks to D103-style requirements, not a makeup or data-center delivery. The D103 guidance above reflects the published AWWA D103-19 structure, not a specific makeup contract.

Real bolted array supports the standard claim; the makeup application does not.

  • No makeup / DC project.
  • Real bolted array 2022.
  • Analogous, not claimed.
  • D103, not D153.

Reference check

Action

Red flag

Standard

Name edition

'All standards'

Coating

Holiday record

Claim only

Bolts

Specify 8.8

Assumed

Reference

Verify project

None

Frequently Asked Questions
What does AWWA D103-19 cover?

Factory-coated, bolted, carbon-steel water tanks - design, shop-applied coating, bolted assembly, and testing.

Is D103 for bolted or welded tanks?

Bolted. D100-21 is the standard for welded steel tanks; D102-24 is the coating standard; D108-19 covers roofs.

What coating does a D103 tank require?

A factory-applied glass-fused-to-steel or FBE system, with a per-batch 1500 V holiday-test record, because field-applied coating is harder to control.

What bolt and gasket specification applies?

8.8-grade bolts as standard, with sealed washers and medium-rated gaskets sized for the stored medium and the temperature swing.

Is there an AWWA D153 standard?

No. AWWA has no D153 tank standard; treat any 'D153' citation as a typo for D103 or an internal project number, not a real standard.

Have you built makeup tanks or data centers?

Not in our project library. Our Namibia bolted GFS array (6 x 11,230 m3, 2022) is cited as bolted-tank proof; the makeup application is analogous and not claimed.

What foundation does a D103 tank need?

A designed ring or slab with documented foundation and anchor-bolt loads, because the bolted tank is only as sound as its base.

What test confirms a D103 tank before handover?

A hydrostatic test of the assembled tank, with the design and coating records forming the acceptance file.

What is the biggest D103 mistake?

A supplier that says 'AWWA compliant' without naming the edition and showing the coating and hydrotest records.

An AWWA D103-19 makeup water tank is a factory-coated, bolted carbon-steel vessel designed and tested to the standard's requirements for design, coating, bolted assembly, and hydrotest, with the critical coating quality moved indoors where it is controlled. Specify the edition, require the 1500 V holiday-test record, the 8.8-grade bolts and sealed gaskets, and the documented foundation and hydrotest, and name the right standard for the construction - D103 for bolted, D100 for welded, D102 for coating, D108 for roofs, and no D153 exists. Center Enamel's real Namibia GFS drinking-water array (6 x 11,230 m3, 2022) shows we build large, code-aware bolted water tanks; the makeup or data-center application remains analogous and is not claimed. Before ordering, require the supplier to name the edition and show the coating and hydrotest records rather than quoting the words AWWA compliant. The edition, the 1500 V holiday-test file, and the hydrostatic test are what separate a compliant bolted tank from a decorative one, and a reviewer will ask for all three. Verify the edition and the coating record before ordering, and the tank is compliant instead of decorative.

Suggested CTA: If you are specifying an AWWA D103-19 makeup water tank, send us the volume, coating, and site loads and we will return a D103-19 design with coating and hydrotest documentation.

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2026 cectanks.com . All Rights Reserved.
Send Message