| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Material: | Glass Fused To Steel | Foundation: | Concrete Or Glass Fused Steel |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Size Of Panel: | 2.4M * 1.2M |
| Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion | Permeability: | Gas / Liquid Impermeable |
| Highlight: | Glass fused to steel sludge tanks,Short-term sludge storage tanks,WWTP sludge equalization tanks |
||
Wastewater plants run on steady flow, but sludge is produced in bursts. Dewatering units process in batches, trucks collect on schedules, and digesters feed at set rates — while clarifiers keep producing sludge hour after hour. Without a buffer, every imbalance stalls the plant. Sludge holding tanks absorb that imbalance: they hold sludge for hours or days, equalize flow, and feed downstream processes at a steady, pumpable rate.
GFS sludge holding tanks from Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) provide the corrosion-proof, gas-tight buffer that this duty needs. The glass surface, fused to steel at 820-930 degrees Celsius, resists the H2S vapor and abrasive sludge chemistry of holding duty, while optional gas-tight covers contain odor. Center Enamel, operating since 2008 with nearly 200 enameling patents, has supplied sludge holding and storage tanks to more than 100 countries.
A sludge holding tank is a buffer vessel that stores sludge for a short period — hours to days — to equalize flow between sludge production and downstream processing.
Sludge holding duty is chemically aggressive and operationally demanding — GFS answers both with an inert surface and gas-tight options.
A holding tank is configured around its operational role — mixing, level control, pump-out, and safety systems are engineered together.
| Evaluation Criterion | GFS Sludge Holding (Center Enamel) | Concrete Basin | Field-Welded Steel |
|---|---|---|---|
| H2S and chemical resistance | Superior — fused glass | Moderate — cracks, absorbs odor | Poor — headspace corrodes |
| Abrasion at mixer zones | High — 6.0 Mohs | Moderate — scouring | Low — coating wear |
| Odor containment | Gas-tight cover options | Open basins typical | Cover dependent |
| Construction velocity | Fast — bolted in weeks | Very slow — months | Slow — welding |
| Lifecycle and maintenance | 30-50 years, minimal | Repair cycles | Recoat every 5-10 years |
Center Enamel GFS sludge holding tanks are FEA-verified to AWWA D103-09, manufactured under ISO 9001/45001, 100% high-voltage holiday spark tested, and certified to ISO 28765 — with wastewater references across more than 100 countries.
A sludge holding tank exists to buy the plant time — and time is only bought if the tank keeps working through the hardest hours. An inert surface and a gas-tight cover make holding duty boring, and boring is exactly what operators want.
A sludge holding tank is a buffer vessel that stores sludge for hours to days, equalizing flow between continuous sludge production and batch dewatering, digestion, or disposal. Mixers keep the sludge pumpable, and optional gas-tight covers contain odor.
Holding tanks buffer short-term flow — hours to days — with mixing and rapid pump-out. Storage tanks hold sludge longer — days to weeks — often with sealed covers and larger capacity. GFS serves both, with configuration adjusted for turnover and retention.
Holding duty combines H2S vapor, abrasive sludge, and mixing stress. The GFS fused-glass surface resists all three without recoating, gas-tight covers control odor, and bolted construction adds capacity in weeks.
Yes — capacity (100-5,000 m3 and larger), mixer type and placement, cover type (open, vented, or gas-tight), level and transfer instrumentation, and accessories such as manholes, flanges, and platforms are engineered per plant layout and duty.