Panel Storage Tank The Complete Guide to Modular Bolted Panel Tanks

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: J2016012316
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C,T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number J2016012316
Acid And Alkalinity Proof: Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 Elastic: Same As Steel Sheet , Around 500KN/mm
Serive Life: More Than 30 Years PH Range: PH 1 - PH 14
Coating Color: Dark Blue, Dark Green , White, And Customized Steel Plates Thickness: 3mm - 12mm , Depends On The Diameter & Height
Easy Yo Clean: Smooth, Glossy, Inert, Anti-adhesion Coating Thickness: 4.0.25mm - 0.4mm, Two Coating Internal And External
Highlight:

modular bolted panel tanks

,

glass fused steel storage tanks

,

panel storage tank guide

Product Description


 

Panel Storage Tank The Complete Guide to Modular Bolted Panel Tanks

A panel storage tank is a modular vessel assembled from factory-manufactured steel panels that bolt together on site with gasketed seams and high-strength fasteners. Municipalities, factories, farms, and mining operations choose panel tanks when they need large liquid capacity without welding equipment, field painting crews, or long curing schedules. Traditional alternatives struggle by comparison: cast-in-place concrete requires weeks of curing and still cracks and leaches, while field-welded carbon steel tanks demand blasting and coating work whose quality depends entirely on site conditions.

Center Enamel, the first Glass-Fused-to-Steel tank manufacturer in China, has produced bolted panel storage tanks since 2008 and holds nearly 200 enameling patents. Its panel tanks — in GFS, fusion bonded epoxy (FBE), stainless steel, and galvanized steel — are certified to ISO 9001, NSF/ANSI 61, EN 1090, ISO 28765, WRAS, and FM, and have been exported to more than 100 countries as of 2023.

1. What Is a Panel Storage Tank and How Is It Built?

A panel storage tank is a bolted vessel whose shell, roof, and floor are formed from standardized steel panels joined by 8.8 grade bolts and engineered sealants, erected ring by ring on a prepared foundation.

· Factory manufacturing: panels are cut, punched, formed, coated, and cured under ISO 9001 factory control — not on a muddy jobsite — so coating thickness and quality are repeatable on every panel.

· Four material systems: Glass-Fused-to-Steel fired at 820-930°C for potable and corrosive service; FBE for wastewater and chemical storage; 304/316/316L stainless for pharmaceutical and high-purity duties; hot-dip galvanized steel at ~450°C for economical dry and water service.

· Bolted erection: crews assemble panels with torque-controlled 8.8 grade bolts and gaskets; a 1,000 m³ tank typically erects in days with small crews and no hot work permits.

· Standardized accessories: manholes, flanges, roof hatches, ladders, platforms, vents, and mixer mounts bolt into predetermined panel positions.

2. Why Do Panel Tanks Outperform Concrete and Welded Alternatives?

Panel tanks win on speed, quality control, and lifecycle cost because the critical work — coating and fabrication — happens in a factory, not in the field.

· Construction velocity: bolted panels erect 3-5 times faster than concrete pours and need no 28-day cure; erection proceeds in parallel with civil works.

· Coating integrity: GFS and FBE coatings are oven-cured and 100% high-voltage spark tested at the factory, eliminating the pinholes that plague field-applied paint on welded tanks.

· Expandability and relocation: panel construction lets owners increase capacity by adding rings, or relocate the entire tank — impossible for cast concrete or welded monoliths.

· Lifecycle economics: with a 30-50 year GFS design life and no recoating cycles, total cost of ownership undercuts concrete (constant repair) and coated welded steel (recoating every 5-10 years).

3. How to Choose the Right Panel Material and Size

Material selection follows the stored liquid; sizing follows the process demand. Both decisions should be backed by certified engineering.

· Potable water: specify NSF/ANSI 61 and WRAS certified GFS panels engineered to AWWA D103-09, with roof access and venting per standard practice.

· Wastewater and sludge: FBE or GFS panels handle hydrogen sulfide and variable pH; ISO 28765 governs enameling quality for these duties.

· High-purity and chemical liquids: 304/316/316L stainless panels deliver an inert, polishable surface for food, beverage, and pharmaceutical processes (LFGB compliant options available).

· Capacity range: modular panel geometry covers 20 m³ to over 20,000 m³; FEA-verified designs accommodate wind, seismic, and snow loads for the project location.

Evaluation Criterion

Center Enamel Panel Tanks (GFS/FBE)

Cast-in-Place Concrete

Field-Welded Coated Steel

Corrosion and chemical defense

Superior — factory-fired GFS / FBE, 100% spark tested

Poor — carbonation, micro-cracking, effluent attack

Moderate — field coating quality varies with weather and crews

Construction velocity

Fast — days, small crews, no curing

Very slow — formwork plus 28-day cure

Slow — welding, blasting, multi-coat field painting

Quality assurance

High — ISO 9001 factory control on every panel

Low — site-dependent workmanship

Moderate — dependent on field conditions

Modularity and scalability

High — extendable by adding rings; relocatable

None

None

Lifecycle and maintenance

Minimal — 30-50 year design life

High — recurring crack repair

High — recoat every 5-10 years

 

Engineering Assurance

Every Center Enamel panel storage tank ships with FEA-based structural calculations, coating certificates, torque-controlled bolt procedures, and erection supervision options under ISO 9001 and ISO 45001 management systems, compliant with AWWA D103-09, ISO 28765, NSF/ANSI 61, EN 1090, and NFPA requirements.


Frequently Asked Questions (FAQ)

What is a panel storage tank?

A panel storage tank is a modular tank built from factory-coated steel panels bolted together on site with gasketed seams. It requires no welding or field painting, erects in days, and can be expanded ring by ring or relocated, with capacities from 20 m³ to over 20,000 m³.

How long does it take to install a panel tank?

Most panel tanks erect within one to three weeks depending on capacity — a 1,000 m³ GFS tank typically assembles in days with a small crew. Because panels bolt together, no concrete curing, welding, or field coating is required.

Which panel material should I choose?

Choose GFS for potable water and corrosive duties (NSF/ANSI 61 certified), FBE for wastewater and chemical service, 304/316/316L stainless for high-purity applications, and galvanized steel for economical water and dry storage. Center Enamel engineers confirm selection against your liquid chemistry.

Can panel storage tanks be customized?

Yes. Center Enamel tailors diameter, height, roof type (cone, geodesic dome, membrane), and accessories — manholes, flanges, ladders, platforms, mixers — to each project, with FEA verification for local wind and seismic loads.

·  

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2026 cectanks.com . All Rights Reserved.
Send Message