Double Membrane Biogas Holder for Biogas from Biomass Digestion Project: Provides the Necessary Volume Stabilization to Manage Continuous or Batch Digester Output

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Product Description

Double Membrane Biogas Holder for Biogas from Biomass Digestion Project: Provides the Necessary Volume Stabilization to Manage Continuous or Batch Digester Output

A Biogas from Biomass Digestion Project is fundamentally a biological process where organic matter is broken down to yield methane-rich gas. Whether the digesters are operated in a continuous flow mode or via batch digester output, the rate of gas production is inherently variable. Downstream utilization equipment requires a steady, predictable supply. This mandates a storage solution that provides the necessary volume stabilization to manage continuous or batch digester output. The holder must act as the primary operational buffer, smoothing the intermittent supply into a usable flow.

The Double Membrane Biogas Holder is the optimal technological solution for integrating biological production with mechanical utilization. It efficiently provides the necessary volume stabilization to manage continuous or batch digester output. Installed as a core stabilizing component , this holder provides a dynamic, hermetic reservoir. By absorbing the significant volume swings common to both continuous or batch digester output, it ensures that the gas utilization equipment operates without interruption, maximizing efficiency and energy generation.

 

Product Advantages for Digester Output Management

Center Enamel’s Double Membrane Biogas Holders are meticulously engineered to handle the flow irregularities specific to various biogas digestion methodologies, ensuring maximum operational consistency.

Volume Stabilization for Intermittent Flow

The inner membrane of the holder provides a substantial dynamic volume buffer. This flexibility is essential for projects using batch digester output, where gas production surges and stops based on feeding cycles. The buffer absorbs these surges, ensuring that a stabilized flow is drawn by the utilization equipment, preventing damaging shutdowns and maximizing the continuous runtime of engines or boilers.

Pressure Regulation for Continuous Flow

Even in a continuous digestion system, variations in temperature and substrate consistency can lead to pressure fluctuations. The active control system of the holder ensures the gas is delivered at a consistent, regulated pressure, regardless of the stored volume. This controlled output is crucial for maintaining the high-efficiency operation of all downstream equipment connected to the continuous digester output.

Support for Aluminum Dome Roofs

In a heavy-duty industrial Biogas from Biomass Digestion Project, where corrosion and structural longevity are primary concerns for the digester vessels, the Biogas Holder can be integrated with a tank protected by an Aluminum Dome Roof. While the membrane system provides the essential flexible gas-tight containment, the aluminum dome offers superior long-term corrosion protection and robust structural support for the underlying digester tank structure, enhancing system durability.

 

Company Advantages

Center Enamel’s standing as a premier global supplier is built on our deep technical expertise and commitment to quality. As a pioneering manufacturer of Glass-Fused-to-Steel (GFS) tanks in China, our company possesses decades of proven history in high-performance containment solutions. Our advanced production capabilities are backed by more than 20 patents in enameling technology and a dedicated research and development team focused on innovation.

Our dedication to quality is demonstrated through our strict adherence to international standards. Our products and processes conform to the most demanding international benchmarks, including standards for quality management, drinking water safety, and occupational health. These certifications provide an independent and verifiable guarantee of quality, safety, and compliance with the most stringent regulations, which is critical for successful operation in international markets. This commitment, combined with our proven global track record of successful projects in over 100 countries, makes us a reliable and expert partner for any complex biomass digestion or biogas infrastructure project.

 

Product Application Areas

Center Enamel's Double Membrane Biogas Holders are essential components across various sectors of the biogas industry:

 

Double Membrane Biogas Holder for Biogas from Biomass Digestion Project: Provides the necessary volume stabilization to manage continuous or batch digester output.

 

 

Double Membrane Biogas Holder for Biogas Production from Waste Biomass Project: A large-capacity, secure vessel for holding gas derived from diverse waste streams.

 

 

Biogas Energy Harvester Project: Acts as the intermediate reservoir, securing the energy resource until needed by the conversion unit.

 

 

Wastewater Treatment and Biogas Recovery Project: Essential for pressure equalization and storage of the recovered gas before utilization or flaring.

 

 

Global Reach and Proven Excellence: Project Cases

Our extensive portfolio of successful containment projects showcases our capability to engineer robust, sealed, and durable solutions—expertise directly applied to our high-performance biogas holders. The following non-fictitious cases demonstrate our global reach and technical excellence:

 

Beijing Fengtai Food Waste Treatment Project: We provided 3 tanks for a food waste treatment facility in Beijing, highlighting our role in sustainable waste-to-energy solutions crucial for biogas production.

 

 

Guizhou Tongren Food Waste Treatment Project: We provided 2 tanks for a food waste treatment facility in Guizhou, China, showcasing our commitment to efficient organic waste management.

 

 

Muyuan Group Jiangsu Lianyungang Livestock Wastewater Project: For a major agricultural client, we supplied 7 tanks for a livestock wastewater project, demonstrating our expertise in large-volume, sealed agricultural containment critical for biogas management.

 

 

Conclusion

For a Biogas from Biomass Digestion Project, the Double Membrane Biogas Holder is the operational equalizer. By reliably providing the necessary volume stabilization to manage continuous or batch digester output, it ensures that the inherent variability of the biological process is successfully decoupled from the rigid demands of mechanical utilization, maximizing energy recovery and system reliability.

 

 

Want to Know more details about this product
Please enter your inquiry details.
Similar Products
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2025 cectanks.com . All Rights Reserved.
Send Message