Biogas Holder for a Wastewater Treatment and Biogas Recovery Project: Essential for Pressure Equalization and Storage of the Recovered Gas Before Utilization or Flaring

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Product Description

Biogas Holder for a Wastewater Treatment and Biogas Recovery Project: Essential for Pressure Equalization and Storage of the Recovered Gas Before Utilization or Flaring

A Wastewater Treatment and Biogas Recovery Project is a critical municipal or industrial facility designed to treat effluent while capturing the methane-rich gas produced during anaerobic sludge digestion. The recovery of this biogas is key to offsetting the plant's considerable energy consumption. However, the recovered gas flow is often variable, and its low pressure can destabilize downstream equipment. This requires a dedicated storage solution that is essential for pressure equalization and storage of the recovered gas before utilization or flaring. This component acts as the operational lungs of the system, ensuring continuous and safe gas management.

The Biogas Holder, utilizing the Double Membrane system, is the optimal technological solution for this dual function of equalization and storage. It is efficiently essential for pressure equalization and storage of the recovered gas before utilization or flaring. Installed either as a digester roof or a free-standing storage sphere , this holder provides a dynamic, hermetic reservoir. By absorbing the variable volume and actively regulating the pressure, it guarantees a consistent gas supply to CHP engines or boilers, maximizing the energy self-sufficiency of the treatment plant.

 

Product Advantages for Wastewater Gas Management

Center Enamel’s Double Membrane Biogas Holders are meticulously engineered to meet the operational demands of wastewater treatment plants, prioritizing safety, pressure control, and continuity.

Essential Pressure Equalization

The process of anaerobic digestion often results in low and fluctuating gas pressure. The double membrane system, supported by its control and air blower unit, actively maintains a constant, slight overpressure on the inner storage membrane. This active regulation ensures pressure equalization, which is critical for the reliable and safe transfer of the gas to utilization equipment or the flare system. Consistent pressure prevents operational shutdowns and maintains system safety.

Storage Buffer for Utilization

The inner membrane provides the dynamic gas reservoir capacity, absorbing the peaks and troughs of biogas production related to sludge feeding schedules or environmental changes. This storage buffer is vital for ensuring a continuous fuel supply to the plant’s CHP units. By allowing the generator sets to run continuously, the holder maximizes the total amount of energy recovered, significantly reducing the plant's external power consumption.

Support for Aluminum Dome Roofs

In the demanding, humid, and corrosive environment of a Wastewater Treatment and Biogas Recovery Project, robust structural integrity is crucial. The Biogas Holder can be integrated with a tank protected by an Aluminum Dome Roof. While the membrane system provides the essential flexible gas-tight envelope for the biogas, the aluminum dome offers superior long-term corrosion protection and robust structural support for the entire digester tank structure, enhancing overall system durability against harsh conditions.

 

Company Advantages

Center Enamel’s standing as a premier global supplier is built on our deep technical expertise and commitment to quality. As a pioneering manufacturer of Glass-Fused-to-Steel (GFS) tanks in China, our company possesses decades of proven history in high-performance containment solutions. Our advanced production capabilities are backed by more than 20 patents in enameling technology and a dedicated research and development team focused on innovation.

Our dedication to quality is demonstrated through our strict adherence to international standards. Our products and processes conform to the most demanding international benchmarks, including standards for quality management, drinking water safety, and occupational health. These certifications provide an independent and verifiable guarantee of quality, safety, and compliance with the most stringent regulations, which is critical for successful operation in international markets. This commitment, combined with our proven global track record of successful projects in over 100 countries, makes us a reliable and expert partner for any complex wastewater or biogas recovery project.

 

Product Application Areas

Center Enamel's Double Membrane Biogas Holders are essential components across various sectors of the biogas industry:

 

Wastewater Treatment and Biogas Recovery Project: Essential for pressure equalization and storage of the recovered gas before utilization or flaring.

 

 

Biogas from Kitchen Waste Project: Captures and secures the biogas, preventing leakage and ensuring odor control in urban environments.

 

 

Biogas Energy Harvester Project: Acts as the intermediate reservoir, securing the energy resource until needed by the conversion unit.

 

 

Biogas-based Power Generation Project: Ensures a consistent and reliable gas flow to the generator set for steady electricity production.

 

 

Global Reach and Proven Excellence: Project Cases

Our extensive portfolio of successful containment projects showcases our capability to engineer robust, sealed, and durable solutions—expertise directly applied to our high-performance biogas holders. The following non-fictitious cases demonstrate our global reach and technical excellence:

 

Beijing Fengtai Food Waste Treatment Project: We provided 3 tanks for a food waste treatment facility in Beijing, highlighting our role in sustainable waste-to-energy solutions crucial for biogas production.

 

 

Guizhou Tongren Food Waste Treatment Project: We provided 2 tanks for a food waste treatment facility in Guizhou, China, showcasing our commitment to efficient organic waste management.

 

 

Muyuan Group Jiangsu Lianyungang Livestock Wastewater Project: For a major agricultural client, we supplied 7 tanks for a livestock wastewater project, demonstrating our expertise in large-volume, sealed agricultural containment critical for biogas management.

 

 

Conclusion

For a Wastewater Treatment and Biogas Recovery Project, the Double Membrane Biogas Holder is a mission-critical utility. By being essential for pressure equalization and storage of the recovered gas before utilization or flaring, it transforms a waste product into a stable fuel source, ensuring the plant's operational continuity and energy self-sufficiency.

 

 

Want to Know more details about this product
Please enter your inquiry details.
Similar Products
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2025 cectanks.com . All Rights Reserved.
Send Message