Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | W |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
Delivery Time: | 10-30 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
Bolted Steel Tanks for Sewage and Wastewater Treatment Plants (STP): A Durable and Efficient Solution
In the realm of sewage and wastewater treatment plants (STP), the importance of reliable, durable, and cost-effective storage solutions cannot be overstated. Whether for holding raw sewage, treated water, or sludge, storage tanks are essential to maintaining the efficiency and continuity of the treatment process. Bolted Steel Tanks, particularly those made from Glass-Fused-to-Steel (GFS) panels, offer the perfect balance of strength, flexibility, and long-term reliability. At Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel), we specialize in manufacturing Bolted Steel Tanks that meet the rigorous demands of modern sewage and wastewater treatment facilities.
As a leading storage tank manufacturer in China. At Shijiazhuang Zhengzhong Technology Co., Ltd., we excel in providing high-quality bolted steel tanks tailored for the diverse needs of fish farming. Our extensive range of bolted steel tanks includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, and galvanized steel tanks, each designed to offer exceptional durability, efficiency, and adaptability for aquaculture applications.
Configuration of Customized Storage Tanks | ||||
Storage tanks | Volume | Roofs | Application | Design Requirements |
GFS Tanks SS Tanks Fusion Bonded Epoxy Tanks Galvanized Steel Tanks Welded Steel Tanks |
<1000m³ 1000-10000m³ 10000-20000m³ 20000-25000m³ >25000m³ |
ADR Roof GFS Roof Membrane Roof FRP Roof Trough Deck Roof |
Wastewater Treatment Project Drinking Water Project Municipal Sewage Project Biogas Project Fire Water Storage Project Oil Storage Project |
Water Supply & Drainage System Seismic Design Wind Resistant Design Lightning Protection Design Tank Insulation Design |
WasteWater Treatment Project Equipment Supply
Pretreatment Equipment | Resource Utilization System | Sludge Treatment System | Other Equipment |
Mechanical Bar Screen Solid-liquid Separator Submersible Mixer |
Gas Holder Boiler System Boost Fan Biogas Generator Torch System Dehydration and Desulfurization Tank |
PAM Integration Dosing Device Screw Sludge Dewatering Machine Slurry Separation Centrifuge |
Sewage Pump Mud Scraper Submersible Sewage Pump Three-phases Separator |
Why Choose Bolted Steel Tanks for STPs?
Sewage and wastewater treatment plants face unique challenges—ranging from fluctuating tank contents, chemical exposure, varying temperatures, and the risk of corrosion. Therefore, choosing the right material for the storage tanks is critical. Bolted Steel Tanks, especially those made from Glass-Fused-to-Steel, offer several advantages that make them ideal for use in sewage and wastewater treatment plants.
1. Corrosion Resistance for Harsh Environments
Wastewater contains a variety of corrosive substances, from chemicals and heavy metals to organic waste. Glass-Fused-to-Steel tanks are created by bonding a layer of enamel (glass) to steel at high temperatures, forming a non-porous, chemically resistant surface that protects the tank from corrosion. This makes them perfect for holding sewage, effluent, and other potentially corrosive materials in STPs without the risk of deterioration.
2. Durability and Longevity
Bolted steel tanks are designed to withstand both internal and external pressures. The combination of high-quality carbon steel and the enamel coating ensures that the tanks maintain their structural integrity over time, even in extreme conditions. These tanks are built to last for decades, offering STPs a long-term, low-maintenance solution.
3. Reduced Maintenance Costs
The enamel coating on Bolted Steel Tanks significantly reduces the buildup of sediment, scaling, and bacteria. The smooth, non-porous surface prevents the formation of deposits that could affect the tank’s performance. As a result, these tanks require minimal maintenance and cleaning, helping to reduce downtime and maintenance costs. Their long-lasting nature also means that they require fewer repairs over their lifespan compared to traditional concrete or uncoated steel tanks.
4. Fast and Easy Installation
Bolted steel tanks are designed for quick and efficient assembly. The panels are pre-fabricated and then bolted together at the site, eliminating the need for extensive welding or construction. This not only speeds up the installation process but also reduces labor costs and the overall project timeline, allowing wastewater treatment facilities to become operational faster.
5. Cost-Effective Solution
Compared to alternatives like stainless steel or concrete tanks, Bolted Steel Tanks are a more affordable option without compromising on performance. The cost-effectiveness of these tanks is enhanced by their longevity, reduced maintenance needs, and ease of installation, making them a smart choice for both new and existing sewage treatment facilities.
Key Features of Bolted Steel Tanks for Sewage and Wastewater Treatment Plants
Our Bolted Steel Tanks are designed with the specific needs of Sewage and Wastewater Treatment Plants (STP) in mind. Key features include:
Glass-Fused-to-Steel Coating: The enamel coating offers a high level of protection against corrosion and chemical exposure, ensuring a longer lifespan for the tank.
Seamless Construction: The bolted design provides a leak-proof structure that minimizes the risk of leaks or failures, even under pressure.
Customizable Capacities: We offer a range of tank sizes and configurations to suit the specific requirements of each STP, from small-scale installations to large storage systems.
Modular Design: Our tanks are modular, meaning they can be expanded or reconfigured as needed. This flexibility allows wastewater treatment plants to scale their storage capacity in line with future demands.
Aluminum Dome Roofs (Optional): We offer Aluminum Dome Roofs to protect the stored water and sludge from environmental contaminants. The dome roof also helps maintain the temperature and reduces evaporation, making the tanks even more efficient.
Compliance with International Standards: Our tanks are built in compliance with globally recognized standards such as ISO 9001, NSF/ANSI 61, ISO 28765, and more, ensuring the highest levels of quality and safety.
Applications of Bolted Steel Tanks in Sewage and Wastewater Treatment Plants
Bolted steel tanks are highly versatile and can be used for various applications within Sewage and Wastewater Treatment Plants:
Raw Sewage Storage: Bolted steel tanks are ideal for holding raw sewage before the treatment process. Their ability to withstand corrosive environments ensures that they provide reliable storage for untreated water.
Treated Water Storage: After treatment, the clean water needs to be stored for further use, such as for irrigation, industrial processes, or even in some cases, potable water. Bolted steel tanks are ideal for safely storing treated water.
Sludge Storage: After sewage treatment, the resulting sludge needs to be stored safely. Bolted Steel Tanks offer a secure and corrosion-resistant solution for managing sewage sludge before disposal or further processing.
Aeration Tanks: In some cases, bolted steel tanks are used as aeration tanks to help facilitate the biological treatment of wastewater, providing an environment for bacteria to break down organic materials.
Effluent Holding: Bolted steel tanks are also used for holding effluent from various industrial processes. Whether the effluent is from municipal or industrial sources, these tanks offer secure and reliable storage.
Why Center Enamel is the Best Choice for STP Storage Solutions
With over 30 years of experience in manufacturing bolted steel tanks, Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) has earned a reputation as a leader in the tank manufacturing industry. Here’s why we are the preferred choice for sewage and wastewater treatment plants around the world:
Global Expertise: Our tanks are used in more than 100 countries, with a successful track record in the sewage and wastewater treatment sector.
Customization: We understand that every STP has unique needs, and we offer customizable tank solutions that are tailored to your specific requirements.
Innovative Technology: As pioneers in Glass-Fused-to-Steel technology, we provide tanks that are highly durable, corrosion-resistant, and built for long-term performance.
Commitment to Quality: All our tanks are built in compliance with the highest international standards, ensuring the best quality and performance for our customers.
Cost-Effective Solutions: Our bolted steel tanks offer an affordable and reliable alternative to other materials like stainless steel and concrete, providing excellent value for money.
For sewage and wastewater treatment plants, Bolted Steel Tanks are an essential part of the infrastructure that ensures the safe and efficient storage of wastewater, treated water, and sludge. Their superior corrosion resistance, long lifespan, ease of maintenance, and cost-effectiveness make them the perfect choice for modern STPs.
At Center Enamel, we are committed to providing the best tank solutions for your sewage and wastewater treatment needs. Contact us today to learn more about our Bolted Steel Tanks and how they can help optimize your wastewater treatment operations.