Home ProductsLiquid Storage Tanks

Center Enamel Co.,Ltd

Certification
Good quality Waste Water Storage Tanks for sales
Good quality Waste Water Storage Tanks for sales
It is really a great pleasure to work with this company ,I can always get the solution timely and on budget

—— Micheal Jonson

Highly recommend this company ! I am a water and wastewater project contractor ,.I am so glad to find such a trustworthy tank supplier .

—— Martin Jäger

Good service ,very patient to help me find the best solution .I will buy more tanks from them in the near future .

—— William Koh

The GFS tank are very durable and very strong enough. The installation work are very simple and rapid for this work job. Overall, the GFS tank are highly recommend

—— HW Chua

I'm Online Chat Now

30000 gallon above ground storage tanks , crude oil storage tank

China 30000 gallon above ground storage tanks , crude oil storage tank supplier
30000 gallon above ground storage tanks , crude oil storage tank supplier 30000 gallon above ground storage tanks , crude oil storage tank supplier

Large Image :  30000 gallon above ground storage tanks , crude oil storage tank

Product Details:

Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W20160127007

Payment & Shipping Terms:

Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month
Contact Now
Detailed Product Description
Coating Color: Dark Green / Can Be Customized Coating Thickness: 0.25mm~0.40mm & Double Coating
Adhesion: 3,450N/cm Elastic: Same As Steel Sheet ,around 500KN /mm
Holiday Test: >1500v Permeability: Gas And Liquid Impermeable

Above Ground With High Acid And Alkali Resistance Glass Lined Liquid Storage Tank

 

 

How is the production process of GFS tank ?

1. Get raw steel sheet : First measure the thickness with micrometer and see whether it matches the raw steel sheet to be used . Then mark down the batch number .

2. Punching , corner cut and edging : Before punching set all the dates as per drawing in the computer and then put steel sheet on the automatic laser cutting machine , which will cutting the holes according to the setting datas .

3. Press Arc :According to the diameter , determine the radian of the pressure plate ; clean up the pressure machine and the plate surface ; be careful do not press the steel emery onto the plate .

4. Short blasting : Before the blasting , shifting the steel emery ( steel grit) and add it to the blasting machine ; hoist the rough steel into the blasting machine. 

5. Glaze Mortar Adjustment : Firstly , the ground coat glaze mortar must be shifted . Secondly , adjust the glaze mortar according to the specification .

6. Spray : Before the spray , check the plate is clean and no defects , use sandpaper to clean the surface well and then put them into the automatic spray machine , start spraying .

7. Buring : After finish spray put the steel sheet to the high temperature oven , the burning temperature between ground enamel and top enamel are different . The temperature of ground enamel is 880-900 degree and the buring time is about 8-20 minutes , while the top ground the temperature is 780-820 degree and the burning time is about 6-16 minutes .

9. Production QC : chemical elements inspection ; holiday test ; Coating  thickness gauge ; Out appearance checking ; Anti-acid&alkaline test ; Anti-high temperature test ; Adhesion test ; Adhesion test

10. Package : Double checking is required before packaging, confirm the plate’s code and quality . The steel plates is separated with each other by PE foam , to avoid any damage on the coating surface . And the whole pallet steels are covered by a outer film, tied by steel belt .

 

Advatanges of GFS tank

1.  superior performance in corrosion resistance and against rust

2.  factory fabrication tank . No painting or spray on erection site

3.  minimal maintenance cost

4.  No need crane or other large equipment during erection.

5.  not subjected to severe weather and environment

6.  can be designed to future expansion, dismantle or re-movement.

 

Comparation of various tanks

No

Item

Cement tank

Carbon steel tank

Enamel tank

1

Construction time

>90 day

> 60 days

<15 days

2

Process technology demand

strict

Welding difficult

easy

3

Installation technology demand

Strict & complicated

difficult

Convenient & easy

4

Removal

impossible

difficult

easy

5

Appearance

normal

normal

good

Contact Details
Center Enamel Co.,Ltd

Contact Person: Miss.Melody wong

Send your inquiry directly to us (0 / 3000)