Dark green Bolted Steel Tanks for Digester and Bioenergy Process

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W20160127015
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W20160127015
Coating Color: Dark Green / Can Be Customized Coating Thickness: 0.25mm~0.40mm & Double Coating
Adhesion: 3,450N/cm Elastic: Same As Steel Sheet ,around 500KN /mm
Acid And Alkalinity Proof: Standard Sheet PH:3~11 Special Sheet PH: 1~14 Hardness: 6.0Mohs
Holiday Test: >1500v High Light:

bolted steel water storage tanks

,

welded steel tanks

Product Description

Minimum Assembly Time Bolted Steel Tanks for Digester and Bioenergy Process

 

 

Brief introduction

Center has the most advanced glass fused to steel production technology and professional production line ,already passed ISO 9001-2000 ,and developed the enamel bolted tank enterprise standard Q/01ZT012009, which is the highest standard in China  and can meet European standards .We can produce AA grade (acid -proof and alkali -proof )enamel sheet according to customers’ different operating requirement In water and waste water treatment and biogas project, GFS tank has been widely used as various aerobic and anaerobic reactors of UASB,EGSB,SBR,BAF,USR,CSTR, and equalization tank, Clarifier, sludge holding tank, etc

 

Why choose GFS tanks

High resistance even against corrosive effluents

  1.  Easy to transport ,low fright cost
  2.  Standard green and color can be customized
  3.  Installation by a trained crew of professionals.
  4.  Short-term production and installation;
  5.  Beautiful appearance Bolted tank construction is  very conservation friendly with little disturbance to the surrounding environment.
  6.  Low capital cost :Tanks are assembled at ground level using a unique jacking system that progressively elevates  the structure to install the panels without the need for expensive cranes or staged scaffolding
  7.  For the installation of the Glass Fused to Steel tanks, the works are carried out at ground level with the use of Jack equipment. Therefore, from a Safety aspect, no work is carried out at height.

 

Comparison of various tanks

Characteristic

Cement

304 S.S.

FRP  tank

Enamel tank

Pressure standing ability

strong

normal

normal

strong

Installation period

> 35 days

>20 days

>30 days

7-10 days

installation

Complex, request big professional equipment

Professional people, work high above the ground, dangerous installation

work high above the ground, dangerous installation, have request on weather condition

Safe installation, easy, fast, do  not have requests on weather condition

removal

impossible

Possible, but high cost

impossible

Possible, low cost

Out appearance

normal

Ok,  but only one color

ok

Good looking

 

Package

To make sure of the plate’s code and quality, double checking is required before packing.The steel plates are separated wit each other by PE foam, to avoid any damage on the coating surface. And the whole pallet steels are covered with a outer film, tied by steel belt.

Dark green Bolted Steel Tanks for Digester and Bioenergy Process 0

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused Steel Tanks Supplier. Copyright © 2016-2024 cectanks.com . All Rights Reserved.
Send Message