| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20160504020 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
In industrial manufacturing, municipal water treatment, wastewater management, and renewable bio-energy sectors, containment capacity requirements vary drastically based on project scope. While a decentralized pilot plant or municipal booster station may only require a compact 20m³ reservoir, large-scale industrial wastewater plants or regional municipal sewage facilities often demand massive storage volumes reaching up to 60,000m³.
Meeting this vast spectrum of capacity requirements without sacrificing structural integrity or corrosion resistance has historically challenged civil engineers. Traditional welded steel tanks or cast-in-place concrete basins are rigid in design; scaling them up involves complex restructuring, while scaling them down presents cost inefficiencies.
To resolve this engineering bottleneck, Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) offers advanced Glass-Fused-to-Steel (GFS) Tanks engineered with freely scalable volumes ranging from 20m³ to 60,000m³.
Glass-Fused-to-Steel technology—also known as glass-lined steel (GLS)—combines the high tensile strength and structural flexibility of steel with the exceptional chemical inertness and corrosion resistance of glass.
High-Temperature Thermal Fusion: Specially formulated enamel frit is applied to high-strength steel plates and fired in a precision furnace at temperatures between 820°C and 930°C. The molten glass reacts with the steel substrate, creating an inseparable, high-integrity electrochemical bond.
Modular Bolted Construction: Rather than relying on single-piece field-welded shells, GFS tanks are built using standardized, factory-fabricated panels bolted together on-site with high-grade self-locking hardware and specialized elastomeric sealants.
The modular architecture of Center Enamel’s GFS tanks allows plant designers to customize diameter-to-height ratios and total capacity precisely to site-specific footprint and hydraulic constraints:
Seamless Capacity Expansion: As municipal populations grow or industrial output scales, modular GFS tanks can be systematically expanded by adding extra ring tiers or panels, protecting initial capital investments.
Compact Footprints for Small Sites (20m³–500m³): Smaller capacity configurations provide high-performance, rapid-deployment containment for packaged water treatment units, leachate pre-treatment pods, and agricultural liquid fertilizer dosing stations.
Massive Span Capability (10,000m³–60,000m³): Large-scale installations utilize engineered ring configurations and heavy-duty structural bracing to safely contain millions of gallons of municipal drinking water, anaerobic digester sludge, or industrial effluent without internal support columns.
| Evaluation Metric | Center Enamel Scalable GFS Tank (20m³–60,000m³) | Cast-in-Place Concrete Reservoir | Traditional Welded Steel Tank |
| Volume Scalability & Flexibility | High (Modular design allows effortless adaptation from small pilots to 60,000m³ giants) | Low (Fixed volume; expanding requires entirely new basin construction) | Low to Moderate (Requires complex field cutting, rolling, and plate welding) |
| Installation Speed & Labor | Fast (Prefabricated panels bolted rapidly on-site with minimal specialized labor) | Very Slow (Months of formwork, rebar binding, concrete pouring, and curing) | Moderate to Slow (Dependent on extensive field welding and NDT testing) |
| Corrosion Defense & Lifespan | Superior (Fused glass surface resists acids, alkalis, and UV degradation; 30+ years life) | Moderate (Vulnerable to concrete carbonation, cracking, and rebar rust) | Low (Requires continuous field maintenance and periodic epoxy recoating) |
| Relocation & Dismantling | Possible (Can be dismantled, relocated, and re-erected at a new site) | Impossible (Permanent structure requiring demolition) | Difficult (Destructive cutting required during dismantling) |
Engineering Note: Whether designing a compact 50m³ fire suppression reserve or a massive 50,000m³ municipal water treatment clarifier, Center Enamel’s engineering team utilizes advanced finite element analysis (FEA) to ensure every scalable volume configuration strictly complies with global benchmarks such as AWWA D103-09, ISO 28765, and NSF/ANSI 61.
A: Center Enamel's GFS tanks offer freely scalable volumes ranging from compact 20m³ units up to massive 60,000m³ industrial and municipal reservoirs, tailored to exact project specifications.
A: Yes. Because of the modular bolted design, Center Enamel's GFS tanks can be easily expanded by adding additional rings of steel panels as plant capacity requirements grow over time.
A: Absolutely. Their versatile modular nature makes them equally effective for small decentralized commercial setups (under 100m³) and ultra-large municipal wastewater treatment plants or bio-energy digesters exceeding 10,000m³.
A: During manufacturing, glass is fused to steel at 820°C to 930°C, creating a chemically inert, highly durable coating. This uniform protective barrier prevents corrosion, abrasion, and biological buildup across every panel, regardless of whether the tank is small or large.