Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | W20160127012 |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
Delivery Time: | 0-60 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
Bolted Steel Tanks Anaerobic Digester Tank Glass lined Steel Reactors with Double Membrane Roof
What is double membrane gas storage
Double membrane gas storage device is composed of the outer membrane ,inner membrane and the bottom membrane .The outer membrane and inner membrane are air-proof .The outer membrane gave form to the external spherical shape of the gas storage device ,and the inner membrane and the bottom membrane made the cavity to store the bio-gas .And the device is explosion -proof
To make sure of the plate’s code and quality,double checking is required before packing.The steel plates are separated wit each other by PE foam, to avoid any damage on the coating surface. And the whole pallet steels are covered with a outer film, tied by steel belt.
advantages of anaerobic treatment
Advantages of glass fused to steel tanks
• Big volumes , storage capacity solutions ranging from 20CBM – 8000CBM
• More cost effective compared to concrete tanks: concrete tanks take long time in construction and need bio professional installation equipment
• More corrosion resistant as compared to welded reservoirs
• Easy to transport ,low fright cost : Standard green and color can be customized
• Installation by a trained crew of professionals.
• Short-term production and installation
• Beautiful appearance: color can be customized ,it is harmonious with the surrounding landscape : concrete tanks are blank out-look appearance, can not change color according to surroundings
• High Performance and Hard wearing: service life of glass fused to steel tank is more than 30 years
Flexibility to Re-Model, Extend, Dismantle and Re-Site: Bolted tanks are easily transported in sizes that absolutely preclude moving other types of tanks. They can be quickly knocked down and erected at a new location without the extra costs of complete cleaning, cutting down, and rewelding.
Project reference
2014 Urban sludge treatment project- Kazakhstan
|
2 sets of anaerobic tank size: φ17.06×15.6, 3564CBM
|
Pharmaceutical wastewate treatment located in Sichuan Chengdu in 2013
|
Project description: Ø19.86×4.8M, 1 set of aerobic tank Ø13.73×7.2M, 1 set of anaerobic tank Ø11.46×6M, 1 set of buffer tank
|