| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden |
| Delivery Time: | 10-30 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
| Place of Origin | China | Brand Name | CEC TANKS |
|---|---|---|---|
| Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | W |
| Tank Body Color: | Dark Green / Can Be Customized | Corrosion Integrity: | Excellent |
| Steel Plates Thickness: | 3mm To 12mm , Depends On The Tank Structure | Chemical Resistance: | Excellent |
| Size Of Panel: | 2.4M * 1.2M | Easy To Clean: | Smooth, Glossy, Inert, Anti-adhesion |
| Highlight: | GFS tanks for solid waste,biogas wastewater treatment project,Philippines waste treatment tanks |
||
The Philippines faces increasing pressure to improve municipal solid waste management as urban populations and consumption continue to grow. Organic waste offers significant potential for anaerobic digestion and renewable energy production. By combining CSTR reactors, GFS Tanks, Double Membrane Roof systems, and auxiliary equipment, project developers can establish integrated facilities that convert biodegradable waste into useful biogas. Center Enamel provides diversified tank manufacturing, EPC services, process packages, and equipment supply. Its storage solutions support customers seeking reliable infrastructure for Solid Waste Treatment and biogas projects in the Philippines.
The Philippines generated an estimated 61,700 tonnes of solid waste per day in 2024, according to Philippine Statistics Authority data. Rapid urbanization, population growth, and increasing consumption contribute to the growing waste management burden. Food waste, packaging materials, plastics, and other household refuse create challenges for collection, sorting, and final disposal. Although the country continues to expand its material recovery facilities and sanitary landfills, improving waste segregation and organic waste treatment remains important. Anaerobic digestion provides an alternative for processing suitable biodegradable materials, recovering renewable energy, and reducing the amount of organic waste sent to disposal facilities.
The conversion of Solid Waste into Biogas starts with collection and preliminary sorting. Non-biodegradable materials such as plastics, glass, and metals are removed to prepare suitable organic feedstock. The selected materials undergo crushing, mixing, and conditioning before entering the anaerobic digestion system. Inside the reactor, microorganisms decompose organic compounds in an oxygen-free environment and produce biogas. The generated gas is collected through a dedicated pipeline and transferred to dehydration and desulfurization equipment. Meanwhile, digestate is discharged for further treatment and solid-liquid separation. The treated biogas can then be stored and utilized for energy recovery.
The Continuous Stirred-Tank Reactor (CSTR) is an important component of anaerobic digestion facilities. It provides continuous or semi-continuous feeding and mechanical mixing inside an enclosed tank. The reactor is equipped with an agitator shaft and paddles that distribute organic feedstock and microorganisms throughout the digestion chamber. This mixing supports contact between microorganisms and organic matter, helping maintain relatively uniform fermentation conditions. Temperature management and stable anaerobic operation are essential for biological activity. During digestion, organic compounds are converted into biogas, which is collected from the upper section of the reactor. Digestate is discharged for subsequent treatment.
Raw biogas contains moisture and hydrogen sulfide that should be reduced before utilization. Dehydration and desulfurization equipment help condition the gas for storage and downstream applications.
Biogas Generation: Produces electricity through gas-powered generators.
Boiler: Supplies thermal energy for industrial and agricultural facilities.
Flare System: Provides controlled combustion when excess gas cannot be utilized.
Compressed Biomethane: Further upgrading and compression can produce biomethane with methane concentrations above 95%, depending on system specifications.
GFS Tanks are suitable for digestion and storage applications in environmental engineering projects. Their glass coating is fused onto steel panels at approximately 820–930°C, creating an integrated protective surface with corrosion resistance. The Double Membrane Roof provides an enclosed space for biogas collection and temporary storage. Its flexible structure accommodates gas volume fluctuations while helping optimize installation space and foundation requirements. Together, these products provide important infrastructure for integrated biogas projects.
Center Enamel provides different tank configurations for environmental applications:
GFS Tanks: Modular solutions for biogas digestion and wastewater storage.
Double Membrane Roof: Enclosed gas collection and storage.
Gas Holders: Facilities for temporary biogas storage.
Black Membrane Systems: Flexible membrane-based storage options.
Solid-Liquid Separator: Separates solid and liquid digestate.
Dehydration and Desulfurization Tank: Conditions raw biogas.
Boiler: Converts biogas into thermal energy.
Flare System: Handles excess gas through controlled combustion.
Gas Holder: Provides temporary biogas storage.
Lifting Pump: Transfers slurry and wastewater.
Torch System: Supports controlled gas combustion.
Screw Sludge Dewatering Machine: Reduces sludge moisture and volume.
Center Enamel combines tank manufacturing capabilities with project-related services for environmental applications.
Industry Experience: More than 36 years of tank manufacturing experience.
Manufacturing Facilities: A 150,000 m² R&D and production base.
Production Capacity: Annual production capacity of 250,000 sheets.
International Coverage: Products supplied to more than 100 countries.
Experienced Workforce: More than 500 employees.
Quality Certifications: Company materials list CE/EN1090, ISO 9001, NSF 61, and WRAS.
Integrated Services: EPC services, process packages, and equipment supply.
Product Diversity: GFS Tanks, Double Membrane Roof systems, and other storage solutions.
The Philippines needs effective waste treatment infrastructure to manage increasing municipal waste generation and improve resource recovery. Anaerobic digestion offers a practical approach to converting suitable organic waste into renewable energy. With CSTR technology, GFS Tanks, Double Membrane Roof systems, and supporting equipment, integrated biogas facilities can support more sustainable Solid Waste Treatment. Center Enamel provides diversified storage solutions and project-related services for environmental engineering requirements.
Q1: What is the difference between aerobic and anaerobic waste treatment?
Aerobic treatment uses oxygen to support microorganisms that decompose organic matter. Anaerobic treatment operates without oxygen and can generate methane-containing biogas during decomposition.
Q2: What factors influence the amount of biogas produced from organic waste?
Feedstock composition, organic loading rate, temperature, pH, retention time, and microbial activity all influence biogas production.
Q3: How does solid-liquid separation improve digestate management?
It separates digestate into liquid and solid fractions, making subsequent treatment, transportation, dewatering, and potential resource recovery easier to manage.