Leading Industrial Wastewater Treatment Project EPC Contractor for Indonesia

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W
Tank Body Color: Dark Green / Can Be Customized Corrosion Integrity: Excellent
Steel Plates Thickness: 3mm To 12mm , Depends On The Tank Structure Chemical Resistance: Excellent
Size Of Panel: 2.4M * 1.2M Easy To Clean: Smooth, Glossy, Inert, Anti-adhesion
Highlight:

industrial wastewater treatment contractor Indonesia

,

wastewater treatment EPC project Indonesia

,

Indonesia wastewater treatment project contractor

Product Description

Leading Industrial Wastewater Treatment Project EPC Contractor for Indonesia

 

 

As Indonesia continues to solidify its position as a global manufacturing and agricultural powerhouse, the scale of its industrial sectors, particularly in palm oil, food processing, and livestock, has reached unprecedented levels. While this growth supports the national economy and food security, it also generates a massive volume of high-strength organic effluent. For large-scale industrial operations, managing this waste has evolved into a complex Industrial Wastewater Treatment Project. To meet the stringent environmental standards and ensure long-term viability, partnering with an experienced Industrial Wastewater Treatment Project EPC Contractor like Center Enamel is essential for converting environmental challenges into sustainable energy assets.

 

 

The Impact of Industrial Wastewater in Indonesia

Indonesia’s rapid industrialization brings significant environmental risks if wastewater is left untreated:

Water Resource Contamination: Raw effluent contains extremely high Chemical Oxygen Demand (COD) and Biological Oxygen Demand (BOD), which can contaminate critical groundwater and river systems.

Pathogenic Risks: Large-scale waste discharge poses severe health risks to surrounding rural and urban populations through the spread of waterborne pathogens.

Environmental Degradation: High nitrogen and phosphorus content leads to soil salinization and the eutrophication of local water bodies, threatening the ecological balance.

By implementing a professional Industrial Wastewater Treatment Project, Indonesian enterprises can achieve resource recovery by transforming high-load organic waste into biogas for captive power generation and producing nutrient-rich bio-fertilizers for local agriculture.

 

Advanced Anaerobic Technologies: UASB, CSTR, USR, and IC

As a leading Industrial Wastewater Treatment Project EPC Contractor, Center Enamel specializes in high-rate anaerobic digestion technologies, with a focus on the UASB Process for efficient organic removal.

 

1. The UASB Process (Upflow Anaerobic Sludge Blanket)

The UASB Process is a cornerstone of modern industrial wastewater treatment.

Mechanism: Wastewater flows upward through a dense blanket of granular anaerobic sludge.

Action: Microorganisms break down organic matter, producing biogas.

Benefit: It is highly efficient in treating high-COD wastewater with a relatively small footprint, making it ideal for the land-intensive requirements of industrial zones.

 

2. The CSTR Process (Completely Stirred Tank Reactor)

Ideal for feedstocks with high solids content, such as concentrated manure and bedding.

Mechanism: Mechanical agitators ensure a homogeneous environment within the tank.

Benefit: It maximizes microbial contact with solids, ensuring stable operation and high biogas production even with variable feedstocks.

 

3. The USR Process (Upflow Solids Reactor)

Specifically designed for high-concentration organic wastewater with high suspended solids.

Mechanism: It is optimized for long solids retention time (SRT) to ensure complete degradation.

 

Benefit: Extremely effective for the intensive treatment of heavy slurry from industrial-scale farms.

 

4. The IC Process (Internal Circulation)

The IC reactor is an advanced evolution of the UASB Process. It utilizes a taller structure and internal circulation driven by biogas production, allowing for significantly higher organic loading rates and enhanced treatment efficiency for the most demanding industrial effluents.

 

 

Durable Infrastructure: The GFS Tank Advantage

The success of any Industrial Wastewater Treatment Project depends on the resilience of the reactor vessels. Center Enamel’s Glass-Fused-to-Steel (GFS) tanks are the industry standard for these demanding applications:

Corrosion Resistance: The glass-and-steel fusion provides a non-porous barrier immune to high ammonia and corrosive $H_2S$ gas.

Rapid Installation: The bolted modular design significantly reduces construction timelines compared to concrete tanks, which is vital for meeting project deadlines in a fast-paced industrial sector.

Scalability and Longevity: GFS tanks offer a service life of over 30 years and can be easily expanded or relocated as production needs grow.

 

Why Choose Center Enamel for Your Project?

Center Enamel provides comprehensive, turnkey solutions that set us apart as a premier EPC partner:

Turnkey EPC Delivery: We manage the entire lifecycle, from design and engineering to manufacturing, installation, and commissioning.

Customized Process Design: We tailor the combination of UASB Process, CSTR, USR, or IC processes based on the specific waste characteristics of each facility.

Proven Global Reliability: With over 30 years of experience and projects in over 100 countries, we deliver world-class engineering quality to the Indonesian market.

 

Successful Project Case Studies

Center Enamel’s expertise is demonstrated through high-performance installations worldwide:

1. Beverage Factory Wastewater Treatment Project in Mali and Guinea

Location: Mali and Guinea

Installation Time: 2024

Process Flow: DAF + Hydrolysis Acidification + Biological Contact Oxidation + Sedimentation + Ozone Oxidation

Treatment Capacity: 100 m³/day

 

2.Thailand Palm Oil Factory Wastewater Treatment Project

Tank Dimensions: Ø29.79*13.8m, 9000m³

Number of Tanks: 2 CSTR GFS Tanks

Installation Date: Under Construction

 

Conclusion

For industrial-scale operators in Indonesia, moving toward sustainable wastewater treatment is a vital step for long-term viability. By combining the resilience of GFS tanks with high-rate processes like the UASB Process, Center Enamel empowers enterprises to achieve energy independence and environmental compliance.

 

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2026 cectanks.com . All Rights Reserved.
Send Message