Sustainable Biogas Technology for Indonesia Pig Farm Wastewater Treatment Projects

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W201691123005
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 0-60 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W201691123005
Steel Plates Thickness: 3mm To 12mm , Depends On The Tank Structure Corrosion Integrity: Excellent
Chemical Resistance: Excellent Capacity: 20 M3 To 18,000 M3
Service Life: ≥30 Years Permeability: Gas / Liquid Impermeable
Highlight:

sustainable biogas wastewater treatment

,

pig farm biogas technology

,

Indonesia wastewater treatment projects

Product Description

Sustainable Biogas Technology for Indonesia Pig Farm Wastewater Treatment Projects

 

 

As Indonesia strives to meet its renewable energy targets, the adoption of Biogas Technology within the livestock industry has gained significant momentum. For large-scale swine operations, implementing a robust pig farm Wastewater Treatment Project is essential for environmental compliance and operational efficiency. Center Enamel supports this transition by providing world-class GFS Tanks and advanced anaerobic digestion systems designed to thrive in Indonesia’s demanding environment.

 

Biogas Development in Indonesia’s Swine Industry

Indonesia’s livestock sector is undergoing a period of significant modernization. While pig farming is a key agricultural activity in various provinces, the tropical climate and high humidity make traditional waste management difficult. Untreated manure runoff poses a threat to local water sources and the environment. Consequently, Indonesian agri-businesses are increasingly exploring decentralized power generation to offset rising energy costs and promote a circular economy. By converting high-strength organic wastewater into clean energy, these farms are becoming models of sustainability.

 

Principles of Biogas Generation

The principle of biogas generation is based on anaerobic digestion—a biological process where microorganisms break down organic matter in the absence of oxygen. As illustrated in technical production flows:

Hydrolysis & Acidogenesis: Organic polymers are broken down into soluble compounds and organic acids.

Acetogenesis: These compounds are further converted into acetic acid, hydrogen, and $CO_2$.

Methanogenesis: Specialized bacteria convert these substrates into methane-rich biogas, which is captured for energy use.

 

 

Optimized Anaerobic Processes: CSTR, UASB, and USR

Center Enamel engineers solutions to maximize methane yield based on specific farm requirements:

CSTR (Completely Stirred Tank Reactor): Ideal for feedstocks with high solids content. It uses high-torque mechanical mixing to ensure maximum microbial contact and high biogas yield.

UASB (Upflow Anaerobic Sludge Blanket): A high-rate process suited for liquid-phase wastewater. It allows for rapid degradation of pollutants within a compact footprint by flowing effluent through a granular sludge blanket.

USR (Upflow Solids Reactor): Specially designed for wastewater with high concentrations of suspended solids, ensuring thorough digestion through high solids retention time.

 

The GFS Tank Advantage

In a pig farm Wastewater Treatment Project, the durability of the digestion vessel is paramount. GFS Tanks (Glass-Fused-to-Steel) offer unrivaled benefits:

 

Exceptional Corrosion Resistance: The fusion of glass and steel creates a non-porous barrier that is immune to organic acids and $H_2S$.

Modular Efficiency: The bolted design enables rapid on-site assembly, which is crucial for reducing construction timelines in remote areas.

Longevity: These tanks are engineered to last over 30 years, resisting UV radiation and tropical fluctuations.

 

Comprehensive Biogas Equipment Solutions

To ensure the success of a biogas project, Center Enamel provides a full suite of integrated equipment:

Biogas Holders: Integrated double-membrane caps for safe methane storage.

Desulfurization Systems: Units that remove $H_2S$ to protect downstream energy infrastructure.

Solid-Liquid Separators: Essential for pre-treatment to filter out grit and improve reactor efficiency.

Flare Systems: Safety units for controlled gas burning during emergencies.

Heat Exchangers & Mixers: Internal systems that maintain the stable temperatures required for efficient digestion.

 

 

Global Success Stories: Pig Farm Project Cases

Center Enamel's expertise is reflected in its diverse portfolio of successfully commissioned projects:

1. Beijing Pig Farm Wastewater Treatment Project

Installation Date: 2020

Daily Processing Capacity: 580 m³/day

Treatment Process: UASB + AOAO

 

 

2. Pig Farm Wastewater Treatment Project in Guangdong, China

Location: Guangdong, China

Process Flow: Pre-treatment + Ultrasonic Cleaning + AOAO

Processing Capacity: Submerged Manure Flushing: 300 m³/day

 

Conclusion

For pig farm operators, the transition to sustainable Biogas Technology is an investment in the future. By combining the resilience of GFS tanks with precision-engineered anaerobic processes like CSTR, UASB, and USR, Center Enamel enables agricultural enterprises to achieve energy independence while safeguarding the environment.

 

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused To Steel Tanks Supplier. Copyright © 2016-2026 cectanks.com . All Rights Reserved.
Send Message