Send Message
Home ProductsBolted Steel Tanks

OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project

Certification
China Shijiazhuang Zhengzhong Technology Co., Ltd certification
China Shijiazhuang Zhengzhong Technology Co., Ltd certification
It is really a great pleasure to work with this company ,I can always get the solution timely and on budget

—— Micheal Jonson

Highly recommend this company ! I am a water and wastewater project contractor ,.I am so glad to find such a trustworthy tank supplier .

—— Martin Jäger

Good service ,very patient to help me find the best solution .I will buy more tanks from them in the near future .

—— William Koh

The GFS tank are very durable and very strong enough. The installation work are very simple and rapid for this work job. Overall, the GFS tank are highly recommend

—— HW Chua

I'm Online Chat Now

OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project

OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project
OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project

Large Image :  OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project

Product Details:
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month
Detailed Product Description
Coating Thickness: 0.25mm~0.40mm , Two Layer Of Coating Internal And External Adhesion: 3,450N/cm
Service Life: ≥30 Years Steel Grade: ART 310
Roof Available: Glass Fused Steel Roof , Membrane Roof, Aluminum Roof , GRP Roof Size Of Panel: 2.4M * 1.2M
Acid And Alkalinity Proof: Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 Applications: Water , Waste Water, Digester , Reactor , Grain , Sludge , Chemicals
Capacity: 20 M³ To 18,000 M³ Installation: By Jacking Machine Or Steel Pole, Fast In Installation
Easy To Clean: Smooth, Glossy, Inert, Anti-adhesion
High Light:

welded steel tanks

,

above ground water storage tanks

Cost-effective Bolted Steel Tanks For Industrial Wastewater Treatment Project

 

 

       The material and design of the tank are commonly determined by the size and location of the industrial wastewater treatment project. Typically, concrete tanks are larger in size due to the high cost to set up. This high cost makes smaller tanks cost prohibitive relative to other designs, which require considerably less equipment on site. Steel tanks for industrial wastewater treatment project are commonly either bolted or welded design. Especially for the factory or plant located in the city, which doesn’t allow the storage tank to take too much place. Bolted steel tanks range in size from 5,000 to 3,500,000 gallons compared to welded steel tanks, which can be extremely large.

 

       Bolted steel tank also known as Glass-Fused-To-Steel Tank, is made of Glass-Fused-To-Steel, special sealant, self-locking bolt, which provides the best possible combination of the strength and flexibility of steel and the inertness of glass. Glass-Fused-To-Steel also known as glass-lined steel or Enamelled steel, is the result of coating the steel with glass infusion at high temperature (850°C).

 

      Comparing with concrete tanks and welded steel tanks, bolted steel tanks have proven to be a cost-effective solution for industrial wastewater treatment project. Bolted steel tanks are prefabricated in the factory and all the materials arrive at the job site ready to install, therefore the amount of manual labor on site is significantly reduced. As extensive and expensive site work required is very minimal, the tank cost is decreased, making bolted steel tanks more affordable compared to other tanks of the same size range. For most mid-sized projects, storage tanks for industrial wastewater treatment project range in capacity from 25,000 to 250,000 gallons, which is well-suited for a bolted steel tank. As welding, grinding and other hot work is not required to erect a bolted steel tank, the risk of fire is dramatically reduced. In addition, bolted steel tanks are prefinished in the factory, therefore sandblasting and painting in the field are eliminated and negative environmental impact is significantly reduced.

 

 

Glass-Fused-to-Steel  Tanks Advantage:

Short construction period, cost-effective tank solution
Superior corrosion resistance, service life is more than 30 years
Easy to install, no need for big installation equipment and/or very skilled labors
Tank volume can be easily expanded
It can be dismantled, removed and relocated
Elegant appearance, tank color can be customized

 

OSHA Bolted Steel Tanks For Industrial Wastewater Treatment Project 0

 

 

Contact Details
Shijiazhuang Zhengzhong Technology Co., Ltd

Contact Person: Ms. melody wong

Tel: 0086-18520168185

Fax: 86-020-34112006

Send your inquiry directly to us (0 / 3000)