| Place of Origin: | China |
| Brand Name: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Model Number: | W20160504015 |
| Minimum Order Quantity: | 1set |
| Price: | $5000~$20000 one set |
| Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
| Delivery Time: | 0-60 days after deposit received |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 60 sets per month |
|
Detail Information |
|||
In both renewable energy production and environmental protection engineering, reliable liquid containment forms the backbone of operational success. Whether managing raw municipal sewage, high-strength industrial effluent, agricultural slurry, or anaerobic digestion byproducts, wastewater storage tanks are subjected to some of the most chemically aggressive environments on earth. High concentrations of hydrogen sulfide (H2S), volatile fatty acids (VFAs), diverse microbial populations, and fluctuating pH levels routinely degrade traditional concrete structures and unprotected carbon steel tanks, leading to premature leaks, environmental hazards, and costly structural repairs.
To eliminate these vulnerabilities, modern sanitation facilities and bio-energy plants rely on high-performance containment engineered by Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel). Utilizing state-of-the-art Glass-Fused-to-Steel (GFS)—also known as glass-lined steel (GLS)—technology, Center Enamel delivers modular bolted storage tanks designed for decades of maintenance-free service in wastewater treatment and biogas recovery operations.
Comprehensive water and waste management requires specialized vessel configurations tailored to distinct biological and physical treatment stages:
Flow Equalization (EQ) Tanks: Industrial and municipal discharge streams fluctuate dramatically in volume and organic concentration. EQ tanks buffer these hydraulic surges, stabilizing feed rates before secondary biological treatment.
Anaerobic Digestion & Biogas Holding Tanks: Operating in oxygen-free environments, these specialized reactors break down complex organic sludge while capturing high-purity, methane-rich biogas for energy generation, heating, or combined heat and power (CHP) systems.
Clarification and Sedimentation Basins: Utilized for separating biological biomass and suspended solids from treated water post-treatment, demanding absolute leak-proof integrity and corrosion defense.
Effluent & Digestate Storage Reservoirs: Post-treatment effluent and nutrient-rich organic digestate require secure, long-term containment prior to safe environmental discharge or agricultural land application.
Center Enamel combines cutting-edge material science with robust modular engineering to address the rigorous demands of wastewater infrastructure:
High-Temperature Thermal Fusion: Specialized glass enamel frit is applied to both sides of high-strength structural steel sheets and fired in high-temperature furnaces between 820°C and 930°C. The resulting molecular fusion merges the tensile strength of steel with the absolute chemical inertness of glass.
Total Immunity to Chemical and Microbial Attack: The glossy, non-porous glass surface (Mohs hardness of 6.0) provides complete resistance to industrial solvents, wastewater acids, and microbial-induced corrosion (MIC).
Modular Bolted Flexibility: Prefabricated under rigorous factory quality controls, GFS panels are rapidly bolted on-site using specialized sealing compounds and high-tensile hardware, allowing for fast project deployment and effortless capacity expansion.
| Evaluation Metric | Center Enamel GFS Wastewater Tank | Cast-in-Place Concrete Basin | Traditional Welded Carbon Steel Tank |
|---|---|---|---|
| Corrosion & Chemical Defense | Superior (Inert glass coating blocks industrial acids, sulfides, and biological attack) | Moderate (Vulnerable to concrete carbonation, sulfate attack, and seepage) | Low (Dependent on field-applied epoxy coatings that pit, blister, and peel) |
| Installation Velocity | Fast (Prefabricated modular panels bolted rapidly on-site with zero curing delays) | Very Slow (Months of civil formwork, pouring, and multi-week curing phases) | Moderate (Requires heavy field plate rolling, welding, and radiograph testing) |
| Lifecycle Maintenance Cost | Minimal (Zero interior repainting required over decades of operation) | High (Requires frequent structural crack sealing, leak injection, and patching) | High (Continuous maintenance overhead to prevent rust-through and failure) |
| Design Lifespan | Extended (30 to 50+ years of continuous, reliable operation) | Variable (Prone to structural degradation and spalling over decades) | Moderate (Subject to degradation once protective coatings fail) |
Engineering Assurance: All wastewater storage and biological treatment tanks supplied by Center Enamel comply strictly with global benchmarks, including AWWA D103-09, ISO 28765, ISO 9001, and NSF/ANSI 61, and undergo 100% high-voltage holiday spark testing (>1500V) prior to dispatch to guarantee zero pinholes.
A: GFS tanks offer superior chemical resistance against aggressive wastewater acids, hydrogen sulfide, and biological attack without requiring continuous maintenance. Unlike concrete basins, which are porous and vulnerable to cracking or structural degradation under shifting ground loads, GFS tanks feature a factory-controlled modular design that installs rapidly and eliminates civil curing delays.
A: Center Enamel's tanks serve as high-efficiency anaerobic digesters and biogas holding reservoirs. They provide the absolute gas-tight integrity and corrosion resistance required to capture methane-rich biogas safely while withstanding the high-viscosity conditions of organic waste fermentation.
A: No. The permanent molecular fusion between the glass coating and the steel substrate provides total corrosion immunity, eliminating the need for interior repainting entirely over a design lifespan exceeding 30 to 50 years.
A: Yes. Because the tanks are constructed from standardized bolted panels, facility operators can easily dismantle upper rings, add new panels to increase height or diameter, or relocate the entire structure to a new site if operational demands shift.