Aquaculture Wastewater Treatment Glass Fused To Steel Tanks Rapid Installation

Product Details
Place of Origin: China
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates ; wooden pallet and wooden box
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin China Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W
Coating Thickness: 0.25mm~0.40mm & Double Coating Adhesion: 3,450N/cm
Hardness: 6.0Mohs Service Life: ≥30 Years
Holiday Test: >1500v >1500v: Gas / Liquid Impermeable
Elastic: Same As Steel Sheet ,around 500KN /mm High Light:

glass fused to steel water tanks

,

above ground fuel storage tanks

Product Description

Rapid Installation of Aquaculture Wastewater Treatment Glass Fused to Steel Tank

 

Glass-Fused-to-Steel tanks are made of individual sections including Glass-Fused-to-Steel, roof, tank ancillaries. All the individual sections are manufactured and finished in the factory according to strict structural specifications, with quality bends, welds and surface processing. The bolt holes and openings will be cut by CNC laser cutting machine automatically. Spray the glass coating on both sides of steel panels automatically. Coating thickness is controlled within 230 microns to 450 microns. After enameling and drying, then firing steel panels in the oven at the temperatures ranging from 850℃ -940℃, which facilitates the interfacial fusion reactions that combine the two materials. That is what we call Glass-Fused-to-Steel. unlike field-welded tanks, which must be finished at the installation site, often resulting in an imperfect and inconsistent finished coating that is susceptible to corrosion and other damage.

 

 

 

The installation time of different tanks

 

Characteristic Concrete Tank SS304 Tank FRP Tank Glass-Fused-to Tank
Installation Period >35days >20days >35days 7-10days
Installation Difficulty Complicated, request large professional equipment Professional workers work high above the ground, dangerous installation Work high above the ground, dangerous installation, highly depends on weather Safe, fast, easy installation

 

Installation features

 

1. short installation period

 

Glass-Fused-to-Steel is manufactured in our factory. After being packed and transported to the construction site for assembly, the Glass-Fused-to-Steel connection is completely bolted, and we have developed a special installation tool to make the installation very simple. The installation time for Glass-Fused-to-Steel tank depends on the sizes of the tanks installed, and the complexity of the installation process. Normally, the installation is very quick, often requiring less than a third of the time it typically takes to complete a welded or a concrete tank, but factors such as site complications or specific job requirements can alter the installation time.

 

2. installation and maintenance are simple

 

Once all of the products have arrived, trained and licensed welders must be hired to weld the various parts together. Once finished, every weld must be thoroughly and professionally inspected to ensure that there are no weak welds or places where leaks might otherwise develop. This necessary step to field-welded tanks can cost a lot of money and time that might otherwise be better spent elsewhere. Should any weaknesses develop over time, those same skilled welders must be re-hired to appropriately mend the units.

In contrast, Glass-Fused-to-Steel tanks are easier to install and cheaper to maintain. Glass-Fused-to-Steel tanks are manufactured at an offsite facility and shipped together in ready-to-assemble sections. These sections can be assembled by anyone with a basic understanding of a socket wrench and blueprint. As long as the foundation is sound, these Glass-Fused-to-Steel tanks can be assembled in just about any type of weather. Should a problem with a leak or marring occur, the damaged piece can be easily unbolted and its replacement bolted into its place.

 

3. expansion and relocation

 

The enamel assembling tank is made of standard Glass-Fused-to-Steel with bolts. We can remove or re-install the Glass-Fused-to-Steel tank after construction and operation, and can easily expand and migrate the tank.

 

Glass-Fused-to-Steel tank Specifications

 

Coating Color Standard dark blue or customized
Coating thickness 0.25~0.45mm, Double coating
Acid and alkalinity proof Standard pH:3~11, Special pH:1~14
Adhesion 3,450N/cm
Elastic 7.9*104 MPA
Hardness 6.0 Mohs
Service life >30 years
Corrosion resistance excellent ! Suitable for waste water, salt water, sea water, high sulfur crude oil, salt fog, organic and inorganic compounds

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused Steel Tanks Supplier. Copyright © 2016-2024 cectanks.com . All Rights Reserved.
Send Message