Enamel Coating Fire Fighting Water Tank With High Corrosion And Abrasion Resistance

Product Details
Place of Origin: CHINA
Brand Name: CEC TANKS
Certification: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number: W20180508003
Payment & Shipping Terms
Minimum Order Quantity: 1 SET
Price: $5000~$20000 one set
Packaging Details: PE poly-foam between each two steel plates;wooden pallets and wooden box
Delivery Time: 10-30 days after deposit received
Payment Terms: L/C, T/T
Supply Ability: 60 sets per month

Detail Information

Place of Origin CHINA Brand Name CEC TANKS
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Model Number W20180508003
Coating Color: Dark Green, Or Customizing Colors Coating Thickness: 0.25~0.40mm, Double Coating
Acid And Alkalinity Proof: Standard Coating Suits For PH3 - PH11, Special Coating Suits For PH1 - PH14 Adhesion: 3,450N/cm
Hardness: 6.0 Mohs Holiday Test: >1500V
Installation: By Jacking Machine Or Steel Pole, Fast In Installation Easy To Clean: Smooth, Glossy, Inert, Anti-adhesion
Permeability: Gas / Liquid Impermeable Foundation: Concrete Or Glass Fused Steel
Steel Grade: ART 310 Impact Resistance: Excellent
Capactiy Available: 20 M3 To 20,000 M3 Size Of Panel: 2.4M * 1.2M
High Light:

fire suppression tank

,

fire fighting water tank

Product Description

Enamel coating fire fighting water tanks are made of Glass-Fused-to-Steel, special sealant, self-locking bolts, and other accessories. And among them, Glass-Fused-to-Steel is the most important part. Glass-Fused-to-Steel or Glass-Lined Steel combines the strength and flexibility of steel and the corrosion resistance of glass. Enamel coating fire fighting water tanks with high corrosion and abrasion resistance. Center Enamel's enamel coating fire fighting water tanks engineering design meet or exceed AWWA D103-09 and EN/ISO28765:2011, and our GFS tank engineers make tank engineering calculation on each specific tank structure according to project local environmental conditions, such as snow load, wind speed, seismic zone, etc., to make sure the tank structure's adequate security in long-term service life.

 

The installation time for enamel coating fire fighting water tanks depends on the sizes of the tanks installed, and the complexity of the installation process. Normally, the installation is very quick, often requiring less than a third of the time it typically takes to complete a welded or a concrete tank, but factors such as site complications or specific job requirements can alter the installation time.

 

Enamel coating fire fighting water tanks are made from individual sections that are manufactured and finished offsite, greatly reducing the time and labor involved in the field. Once delivered, each section is erected, sealed with gaskets and bolted to adjacent sections. This results in an installation process that is quick and easy, far faster than the installation of concrete or welded tanks, and it is not subject to the weather delays that often stall the installation of competing designs.

 

Center Enamel Fire Water Tanks is the leader in the water storage tank industry, and confirming to AWWA D103 - 09 design standard. With over 30 years of experience, Center Enamel provides professional solutions to meet the client’s request, products are successfully exported to over 45 countries.

 

 

Want to Know more details about this product
Please enter your inquiry details.
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Leave a Message
*Email
*Message
Send
China Good Quality Glass Fused Steel Tanks Supplier. Copyright © 2016-2024 cectanks.com . All Rights Reserved.
Send Message