Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | W |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
Delivery Time: | 10-30 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
ANAEROBIC DIGESTION (AD) TANKS OF UASB, EGSB,SBR,BAF,USR,CSTR
Our glass fused to steel tank are Certificated by AWWA D103-09, ISO9001:2008, OSHA. By using glass fused to steel tank as anaerobic digester tank and biogas storage tank ,we have helped customers with biogas project, WWTP project with aerobic and anaerobic reactors of UASB, EGSB,SBR,BAF,USR,CSTR etc.Our glass fused to steel tank use enamel frits and carbon steel panel to fuse together and achieve the best properties of both – the strength and flexibility of steel combined with the corrosion resistance of glass. It can provide many years of trouble free service in harsh environments.We calculate,design,deliver the full media and offer supervision and on-site assembly if needed.
Standard technical specification.
Coating Color: | Black Blue(RAL 5004), others are available with extra charge |
Number of Coats: | 2 costs (in & out) |
Number of Fires: | 2 fires (in & out) |
Coating Thickness: | 0.25 - 0.45mm |
Steel Size: | 2500 x 1250mm |
Steel thickness: | 3 - 12mm |
Adhesion: | 3,450 M/cm |
Elastic: | 500 KN/mm |
Hardness: | 6.0 Mohs |
Service Life: | 30 Years |
Holiday Test | 1500 V |
Accessories:
Standard equipped bolt, nut, washer(all HDG) with PP cap, including 5% overage
Standard equipped waterproof glue, sealant
Standard equipped tank top/bottom rolled angle(HDG)
Standard equipped wind stiffener(HDG, if it’s required)
Standard equipped access vertical staircase, platform with guardrail(all HDG)
Tank Roof Optional for biogas storage tank:
Glass Fused to Steel Tank Roof
Double Membrane Roof
TERMS
Trade Terms: FOB Tianjin Xingang.
Delivery time: 3 months after the receipt of deposit payment and tank drawing confirmation
Terms of payment: 30%TT deposit, balance paid before shipment
Warranty: 5 years free quality guarantee after installation finished (warranty statement will be detailed in quotation file)