Place of Origin: | China |
Brand Name: | CEC TANKS |
Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
Model Number: | J2016012637 |
Minimum Order Quantity: | 1set |
Price: | $5000~$20000 one set |
Packaging Details: | PE poly-foam between each two steel plates ; wooden pallet and wooden box |
Delivery Time: | 0-60 days after deposit received |
Payment Terms: | L/C, T/T |
Supply Ability: | 60 sets per month |
Detail Information |
|||
Place of Origin | China | Brand Name | CEC TANKS |
---|---|---|---|
Certification | ISO 9001:2008, AWWA D103 , OSHA , BSCI | Model Number | J2016012637 |
Coating Thickness: | 0.35 Mm | Coating Color: | Customized |
Roof Type: | Glass Steel Roof, Membrane Roof, Aluminum Roof, GRP Roof | Design According To: | AWWA D 103 , OSHA |
Tank Color: | Dark Green, Dark Blue, Light Blue And Customized | Tank Material: | Glass Coated Steel Sheets |
Capacity Range: | 20 M3 To 18,000 M3 | Service Life: | More Than 30 Years |
High Light: | anaerobic sludge digester,anaerobic manure digester |
Glass Line Coated Wastewater Anaerobic Digester Tank
Quick details of GFS tank
Glass fused to steel tank is a kind of factory fabrication tank , which made of glass coated on Ti-rich special steel plates . The steel plates are coated with enamel powder ( mixing with 10-20 different materials ) and burned in oven ( Temperature from 800 celsius to 950 celsius ) , which makes the steel sheet and glass coated greatly blend together . High recommended , all of the holes on the tank wall will be precut on the workshop , instead of on job site . According to the size of hole , there will be some flanges nozzles along with.
How to do the wastewater treatment ?
The anaerobic digester is widely be used in wastewater treatment . For the wastewater treatment , the first process is doing pretreatment , the purpose is to remove the large solid from the wastewater . The next step is primary treatment , which need clarification and sedimentation tank to finish this process , the purpose is to remove the suspended solid and biochemical particulate from the wastewater .
After finished the pretreatment and primary treatment , it need to do the secondary treatment . For the secondary treatment , it require anaerobic mircroorganisms facilities ( most of the wastewater treatment use this facility to do the wastewater treatment ) to do it. The purpose of it is to remove the remaining suspended solid and BOD . Wastewater treatment facilities utilize anaerobic digester ( Glass fused to steel anaerobic digester tank ) to break down sewage sludge and eliminate pathogens in wastewater .
Glass fused steel tank advantages
1. superior performance in corrosion resistance and against rust |
2. factory fabrication tank . No painting or spray on erection site |
3. minimal maintenance cost |
4. No need crane or other large equipment during erection. |
5. not subjected to severe weather and environment |
6. can be designed to future expansion, dismantle or re-movement. |
Center glass fused to steel tank project reference
-- 2008 Beijing Olympics Games wastewater project
-- 2009 Niger Azelik uranium deposits(China National Nuclear Corporation)
-- 2009 Niger Azelik uranium deposits(China National Nuclear Corporation)
-- 2009-2013 Palm oil wastewater treatment project in Indonesia
-- 2011 Anyang city Biogas project
-- Chengdu Biology waste water project
-- Brewery wastewater treatment
-- Shandong Garbage waste water treatment project
-- Pharmacy waste water treatment project
-- 2013 Sichuan Chengdu Pharmaceutical wastewater treatment
-- 2014 Urban sludge treatment project- Kazakhstan